Improvements to S-48 (Columbia Ave) in Chapin. Let by South Carolina DOT on April 14, 2026, Lexington, District 1. 5 bids received; low bid $54,345,581 by McClam & Associates, Inc..
- Owner
- South Carolina DOT
- Letting
- 14 APR 2026
- Pay items
- 245
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McClam & Associates, Inc. | $54,345,581 | Low |
| 2 | Palmetto Corp. of Conway | $64,373,115 | +18% |
| 3 | Eagle Construction Company | $65,227,657 | +20% |
| 4 | C.R. Jackson, Inc. | $65,904,453 | +21% |
| 5 | Blythe Development, LLC | $68,302,028 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McClam & Associates, Inc. | 2. Palmetto Corp. of Conway | 3. Eagle Construction Company | 4. C.R. Jackson, Inc. | 5. Blythe Development, LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $2,269,021 | $2,810,000 | $3,200,000 | $3,290,000 | $3,428,000 |
| 0020 | Mobilization - subcontractor (1031100) | LS | 1 | $2,352,618 | $803,475 | $3,200,000 | $3,290,000 | $2,000,000 |
| 0030 | Bonds and insurance (1032010) | LS | 1 | $1,061,767 | $1,280,000 | $1,250,000 | $1,300,000 | $363,123 |
| 0035 | Railroad insurance CSX (1033000) | LS | 1 | $75,500 | $52,800 | $14,000 | $225,000 | $5,632.83 |
| 0040 | Construction stakes, lines & grades (1050800) | EACH | 1 | $527,500 | $196,000 | $830,000 | $540,000 | $1,107,415 |
| 0050 | Utility staking (1052001) | LS | 1 | $30,000 | $36,500 | $82,000 | $65,000 | $67,594 |
| 0060 | Large public water relocation no. ____ 01 (1052110) | EACH | 1 | $6,145,747 | $8,098,210 | $5,712,243 | $6,090,226 | $9,500,000 |
| 0070 | Small public sewer relocation no. ____ 01 (1052200) | EACH | 1 | $3,979,641 | $4,577,625 | $4,442,923 | $4,349,553 | $4,900,000 |
| 0080 | Archaeologist (1071400) | HR | 40 | $600.00 | $100.00 | $125.00 | $305.00 | $112.66 |
| 0100 | CPM progress schedule (1080300) | LS | 1 | $73,500 | $13,500 | $80,000 | $120,000 | $48,217 |
| 0110 | Clearing & grubbing within right of way (2011000) | LS | 1 | $2,309,380 | $2,800,000 | $1,705,000 | $1,810,000 | $6,139,000 |
| 0120 | Removal & disposal item no. 01 (2022000) | LS | 1 | $6,500.00 | $2,000.00 | $2,500.00 | $7,300.00 | $1,714.53 |
| 0130 | Removal & disposal item no. 02 (2022000) | LS | 1 | $1,500.00 | $1,000.00 | $1,800.00 | $570.00 | $1,054.99 |
| 0140 | Removal & disposal item no. 03 (2022000) | LS | 1 | $6,500.00 | $2,000.00 | $2,500.00 | $1,750.00 | $1,593.98 |
| 0150 | Removal & disposal item no. 04 (2022000) | LS | 1 | $5,500.00 | $2,000.00 | $2,100.00 | $3,500.00 | $1,714.53 |
| 0160 | Removal & disposal item no. 05 (2022000) | LS | 1 | $3,500.00 | $2,000.00 | $2,300.00 | $1,800.00 | $1,714.53 |
| 0170 | Removal & disposal item no. 06 (2022000) | LS | 1 | $4,500.00 | $7,500.00 | $6,500.00 | $5,000.00 | $28,164 |
| 0180 | Removal & disposal item no. 07 (2022000) | LS | 1 | $4,500.00 | $2,000.00 | $2,350.00 | $1,800.00 | $1,714.53 |
| 0190 | Removal & disposal item no. 08 (2022000) | LS | 1 | $2,500.00 | $2,000.00 | $2,500.00 | $125.00 | $1,593.98 |
| 0200 | Removal & disposal item no. 09 (2022000) | LS | 1 | $4,500.00 | $7,500.00 | $6,500.00 | $5,000.00 | $28,164 |
| 0210 | Removal & disposal item no. 10 (2022000) | LS | 1 | $5,500.00 | $7,000.00 | $9,750.00 | $3,900.00 | $6,017.31 |
| 0220 | Removal & disposal item no. 11 (2022000) | LS | 1 | $5,500.00 | $7,000.00 | $9,750.00 | $3,900.00 | $6,017.31 |
| 0230 | Removal & disposal item no. 12 (2022000) | LS | 1 | $3,500.00 | $3,000.00 | $3,900.00 | $3,900.00 | $1,955.60 |
| 0240 | Removal & disposal item no. 13 (2022000) | LS | 1 | $12,500 | $3,000.00 | $7,800.00 | $14,850 | $3,274.73 |
| 0250 | Removal & disposal item no. 14 (2022000) | LS | 1 | $2,500.00 | $3,000.00 | $3,600.00 | $3,050.00 | $1,714.53 |
| 0260 | Removal & disposal item no. 15 (2022000) | LS | 1 | $4,800.00 | $7,500.00 | $13,000 | $5,000.00 | $28,164 |
| 0270 | Removal & disposal item no. 16 (2022000) | LS | 1 | $7,500.00 | $5,000.00 | $10,400 | $5,000.00 | $2,368.23 |
| 0280 | Removal & disposal item no. 17 (2022000) | LS | 1 | $4,500.00 | $3,000.00 | $3,250.00 | $3,900.00 | $2,109.95 |
| 0290 | Removal & disposal item no. 18 (2022000) | LS | 1 | $4,500.00 | $1,000.00 | $2,050.00 | $570.00 | $934.44 |
| 0300 | Removal & disposal item no. 19 (2022000) | LS | 1 | $6,500.00 | $2,000.00 | $2,300.00 | $855.00 | $1,714.53 |
| 0310 | Removal & disposal item no. 20 (2022000) | LS | 1 | $5,500.00 | $1,000.00 | $2,600.00 | $2,600.00 | $1,296.07 |
| 0320 | Removal & disposal item no. 21 (2022000) | LS | 1 | $5,500.00 | $2,000.00 | $2,200.00 | $1,750.00 | $1,593.98 |
| 0330 | Removal & disposal item no. 22 (2022000) | LS | 1 | $5,600.00 | $4,000.00 | $5,200.00 | $1,400.00 | $4,966.53 |
| 0340 | Removal & disposal item no. 23 (2022000) | LS | 1 | $4,500.00 | $2,000.00 | $2,350.00 | $1,750.00 | $1,714.53 |
| 0350 | Removal & disposal item no. 24 (2022000) | LS | 1 | $3,500.00 | $3,000.00 | $3,250.00 | $1,750.00 | $1,714.53 |
| 0360 | Removal & disposal item no. 25 (2022000) | LS | 1 | $6,500.00 | $5,000.00 | $5,250.00 | $3,500.00 | $1,955.60 |
| 0370 | Removal & disposal item no. 26 (2022000) | LS | 1 | $8,500.00 | $3,000.00 | $3,100.00 | $3,900.00 | $2,437.78 |
| 0380 | Removal & disposal item no. 27 (2022000) | LS | 1 | $2,500.00 | $3,000.00 | $3,200.00 | $850.00 | $1,593.98 |
| 0390 | Removal & disposal item no. 28 (2022000) | LS | 1 | $8,500.00 | $5,000.00 | $5,900.00 | $7,325.00 | $4,698.21 |
| 0400 | Removal & disposal item no. 29 (2022000) | LS | 1 | $7,500.00 | $2,000.00 | $2,100.00 | $850.00 | $1,593.98 |
| 0410 | Removal & disposal item no. 30 (2022000) | LS | 1 | $7,500.00 | $2,000.00 | $3,300.00 | $125.00 | $1,593.98 |
| 0420 | Removal & disposal item no. 31 (2022000) | LS | 1 | $2,500.00 | $1,000.00 | $1,800.00 | $850.00 | $1,384.76 |
| 0430 | Removal & disposal item no. 32 (2022000) | LS | 1 | $8,500.00 | $9,000.00 | $11,100 | $10,000 | $14,082 |
| 0440 | Removal & disposal item no. 33 (2022000) | LS | 1 | $8,500.00 | $9,000.00 | $20,100 | $12,500 | $37,177 |
| 0450 | Removal & disposal item no. 34 (2022000) | LS | 1 | $4,500.00 | $9,000.00 | $14,500 | $10,000 | $14,082 |
| 0460 | Removal & disposal item no. 35 (2022000) | LS | 1 | $4,500.00 | $6,000.00 | $6,250.00 | $750.00 | $3,850.57 |
| 0470 | Removal & disposal item no. 36 (2022000) | LS | 1 | $2,000.00 | $3,000.00 | $3,900.00 | $850.00 | $2,109.95 |
| 0480 | Removal & disposal item no. 37 (2022000) | LS | 1 | $18,000 | $42,000 | $275,000 | $68,500 | $190,390 |
| 0490 | Removal & disposal item no. 38 (2022000) | LS | 1 | $3,500.00 | $2,000.00 | $7,800.00 | $990.00 | $4,048.32 |
| 0500 | Removal & disposal item no. 39 (2022000) | LS | 1 | $1,500.00 | $2,000.00 | $2,900.00 | $310.00 | $2,825.23 |
| 0510 | Removal & disposal of existing pavement (2023000) | SY | 1,802 | $13.25 | $33.50 | $14.00 | $21.50 | $36.25 |
| 0520 | Removal & disposal of existing curb (2024100) | LF | 6,810 | $13.25 | $15.00 | $7.00 | $9.00 | $19.63 |
| 0530 | Removal & disposal of existing asphalt pavement (2025000) | SY | 28,600 | $13.25 | $20.00 | $9.00 | $15.00 | $15.10 |
| 0540 | Unclassified excavation (2031000) | CY | 62,754 | $18.96 | $35.95 | $21.88 | $32.00 | $15.11 |
| 0550 | Borrow excavation (2033000) | CY | 68,840 | $19.74 | $50.00 | $45.50 | $33.00 | $36.00 |
| 0560 | Borrow pit set-UP (2033100) | LS | 1 | $345,272 | $225,000 | $265,000 | $150,000 | $4,657.49 |
| 0570 | Muck excavation (2034000) | CY | 52,000 | $44.68 | $46.75 | $25.00 | $31.50 | $34.24 |
| 0580 | Geotextile, separation (2036020) | SY | 39,100 | $5.82 | $3.95 | $6.00 | $3.00 | $2.30 |
| 0590 | Geotextile, stabilization (2036030) | SY | 39,100 | $5.90 | $4.45 | $6.00 | $3.00 | $2.30 |
| 0600 | Stone bridge lift material (2052010) | TON | 46,800 | $54.95 | $84.90 | $68.00 | $60.00 | $55.00 |
| 0610 | Fine grading (2081001) | SY | 99,258.91 | $5.70 | $3.95 | $2.00 | $7.75 | $3.00 |
| 0620 | Flowable fill (2103000) | CY | 100 | $319.08 | $500.00 | $725.00 | $425.00 | $430.00 |
| 0630 | Graded aggregate base course (6" uniform) (3050106) | SY | 87,306 | $17.37 | $28.25 | $35.50 | $26.00 | $15.98 |
| 0640 | Maintenance stone (3059900) | TON | 1,350 | $58.23 | $146.60 | $52.75 | $55.00 | $40.16 |
| 0650 | Liquid asphalt binder PG64-22 (4011004) | TON | 2,600 | $920.00 | $850.00 | $815.00 | $760.00 | $975.00 |
| 0660 | Full depth asph. pav. patching 8" unif (4012080) | SY | 1,000 | $141.50 | $133.10 | $130.00 | $150.00 | $150.00 |
| 0675 | Milling existing asphalt pavement 1.75" (4013117) | SY | 4,800 | $5.50 | $5.20 | $7.00 | $10.00 | $5.90 |
| 0680 | Milling existing asphalt pavement 2.0" (4013120) | SY | 33,762 | $4.50 | $4.20 | $11.00 | $7.00 | $4.85 |
| 0690 | Milling existing asphalt pavement (variable) (4013990) | SY | 8,500 | $13.50 | $12.60 | $7.00 | $20.00 | $14.75 |
| 0700 | Asphalt base course - type A (4020310) | TON | 24,395.48 | $110.50 | $104.40 | $115.00 | $150.00 | $118.00 |
| 0710 | Asphalt intermediate course type A (4030310) | TON | 7,029 | $122.50 | $112.80 | $135.00 | $130.00 | $132.00 |
| 0720 | Asphalt intermediate course type B (4030320) | TON | 10,208.40 | $132.00 | $125.30 | $137.00 | $130.00 | $140.00 |
| 0730 | Asphalt surface course type B (4040320) | TON | 11,980 | $140.00 | $125.95 | $165.00 | $140.00 | $150.00 |
| 0740 | Asphalt surface course type E (4040360) | TON | 754 | $171.70 | $160.00 | $240.00 | $225.00 | $185.00 |
| 0750 | Stained concrete pavement (8" uniform) (5019010) | SY | 570 | $220.00 | $152.30 | $250.00 | $208.00 | $225.00 |
| 0760 | Traffic control (6011000) | LS | 1 | $1,883,557 | $2,960,000 | $2,620,000 | $5,500,000 | $2,000,000 |
| 0765 | Barricade - type III (6041200) | LF | 642 | $24.00 | $21.00 | $30.00 | $25.00 | $36.16 |
| 0770 | Permanent construction signs (ground mounted) (6051120) | SF | 688 | $6.50 | $7.40 | $12.00 | $6.25 | $8.00 |
| 0772 | Permanent construction signs (barricade mounted) (6051125) | SF | 309 | $7.35 | $7.40 | $13.00 | $8.75 | $11.50 |
| 0774 | Construction zone electric changeable message sign (trailer (6062000) | EACH | 4 | $15,000 | $19,980 | $17,500 | $8,400.00 | $6,000.00 |
| 0776 | Type B - flashing light (608100B) | EACH | 85 | $47.50 | $125.00 | $160.00 | $165.00 | $120.54 |
| 0780 | Pavement markings(temp- paint) 4" white broken lines (609105A) | LF | 20,938 | $0.15 | $0.15 | $0.25 | $0.15 | $0.16 |
| 0790 | Pavement markings(temp- paint) 4" yellow broken lines (609105B) | LF | 2,300 | $0.15 | $0.15 | $0.25 | $0.15 | $0.16 |
| 0800 | Pavement markings(temp- paint) 6" white broken lines (609110A) | LF | 996 | $0.20 | $0.20 | $0.30 | $0.20 | $0.21 |
| 0810 | Pavement markings(temporary-paint)-4" white solid lines (609115A) | LF | 38,414 | $0.15 | $0.15 | $0.25 | $0.15 | $0.16 |
| 0820 | Pavement markings(temporary-paint)-4" yellow solid lines (609115B) | LF | 152,146 | $0.15 | $0.15 | $0.22 | $0.15 | $0.16 |
| 0830 | Pavement markings(temporary-paint)-6" white solid lines (609120A) | LF | 41,700 | $0.20 | $0.20 | $0.30 | $0.20 | $0.21 |
| 0840 | Pavement markings(temporary-paint)-8" white solid lines (609125A) | LF | 21,172 | $0.20 | $0.20 | $30.00 | $0.20 | $0.21 |
| 0850 | Pavement markings(temporary-paint)- 24"white solid lines (609135A) | LF | 5,084 | $1.50 | $1.50 | $2.00 | $1.50 | $1.60 |
| 0860 | Pavement markings (temporary paint) 24"X36" white triangle yield bar (609138A) | LF | 280 | $5.00 | $5.00 | $6.50 | $5.00 | $5.40 |
| 0870 | Pavement markings(temporary-paint)- white single arrow (609160A) | EACH | 232 | $10.00 | $10.00 | $15.00 | $10.00 | $10.95 |
| 0880 | Pavement markings(temporary-paint)- white word 'only (609180A) | EACH | 176 | $10.00 | $10.00 | $15.00 | $10.00 | $11.27 |
| 0890 | Pavement markings(temp.- paint)-WH.railroad xing symbols (609185A) | EACH | 16 | $10.00 | $10.00 | $15.00 | $10.00 | $11.27 |
| 0900 | Temporary clear pavement markers mono-dir.- 4"X4" (6092100) | EACH | 696 | $7.50 | $7.50 | $10.00 | $7.50 | $8.45 |
| 0910 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 536 | $7.50 | $7.50 | $10.00 | $7.50 | $8.45 |
| 0920 | White single bike lane arrow (LT, straight, RT)-fast dry paint (6240031) | EACH | 28 | $10.00 | $10.00 | $25.00 | $10.00 | $11.27 |
| 0930 | Bike lane symbol - fast dry paint (6240055) | EACH | 26 | $10.00 | $10.00 | $25.00 | $10.00 | $11.27 |
| 0935 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 5,560 | $0.75 | $0.75 | $1.00 | $0.75 | $0.84 |
| 0940 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 5,098 | $0.75 | $0.75 | $1.00 | $0.75 | $0.84 |
| 0950 | 6" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007) | LF | 249 | $1.15 | $1.15 | $1.50 | $1.15 | $1.30 |
| 0960 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 2,960 | $0.50 | $0.50 | $0.65 | $0.50 | $0.56 |
| 0970 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 10,425 | $0.75 | $0.75 | $1.00 | $0.75 | $0.84 |
| 0980 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 5,293 | $2.95 | $2.95 | $4.00 | $2.95 | $3.32 |
| 0990 | 12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023) | LF | 70 | $15.00 | $15.00 | $20.00 | $15.00 | $16.90 |
| 1000 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 1,201 | $8.85 | $8.85 | $11.50 | $8.85 | $9.97 |
| 1010 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 58 | $75.00 | $75.00 | $100.00 | $75.00 | $84.49 |
| 1020 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 44 | $85.00 | $85.00 | $120.00 | $85.00 | $95.76 |
| 1030 | Railroad crossing symbols - thermoplastic - 125 mil. (6271045) | EACH | 4 | $400.00 | $400.00 | $550.00 | $400.00 | $450.63 |
| 1040 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 575 | $0.50 | $0.50 | $0.70 | $0.50 | $0.56 |
| 1050 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 31,475 | $0.50 | $0.50 | $0.70 | $0.50 | $0.56 |
| 1060 | Bike lane symbol -preformed thermo - 60MIL (6280055) | EACH | 26 | $150.00 | $150.00 | $200.00 | $150.00 | $168.99 |
| 1070 | Bike lane arrow - preformed thermo - 60MIL (6280056) | EACH | 28 | $75.00 | $75.00 | $100.00 | $75.00 | $84.49 |
| 1080 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 199 | $7.50 | $7.50 | $10.00 | $7.50 | $8.45 |
| 1090 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 30 | $7.50 | $7.50 | $10.00 | $7.50 | $8.45 |
| 1100 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 519 | $7.50 | $7.50 | $10.00 | $7.50 | $8.45 |
| 1110 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 518 | $20.40 | $33.00 | $67.50 | $48.00 | $39.43 |
| 1120 | Flat sheet, type XI, size determined by MSG, overhead (6510108) | SF | 494 | $25.00 | $47.85 | $60.00 | $52.00 | $41.68 |
| 1130 | Mounting assembly for F.S. sign erctd on span wire (6513015) | EACH | 69 | $395.00 | $327.01 | $550.00 | $395.00 | $563.28 |
| 1140 | F&I mounting assembly for F.S. sign erctd on mast arm (6513020) | EACH | 35 | $550.00 | $300.00 | $575.00 | $550.00 | $788.60 |
| 1150 | U-section post for sign supports - 2P (6531205) | LF | 1,149 | $12.00 | $16.00 | $22.00 | $97.50 | $22.53 |
| 1160 | Design & installation of rdwy. lighting electrical system 01 (6581000) | EACH | 1 | $104,000 | $25,000 | $135,000 | $104,000 | $140,000 |
| 1170 | SGL.light STD.35'HT.AL.pole- incl top tenon MT. (6581145) | EACH | 8 | $18,850 | $10,000 | $16,900 | $18,850 | $13,000 |
| 1180 | Furnish & install electrical service connections 01 (6650900) | LS | 1 | $10,400 | $15,000 | $16,900 | $10,400 | $3,379.70 |
| 1190 | Furnish & install 2.0" galvanized rigid conduit (6750015) | LF | 105 | $97.50 | $100.00 | $75.00 | $97.50 | $45.06 |
| 1200 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 1,115 | $19.00 | $18.11 | $19.00 | $19.00 | $19.15 |
| 1210 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 2,025 | $19.75 | $18.83 | $21.50 | $19.75 | $27.25 |
| 1220 | Furnish & install 3.0" schedule 80 PVC conduit (675027C) | LF | 740 | $26.95 | $40.00 | $34.00 | $26.95 | $65.34 |
| 1230 | Furnish additional conduit within directional bore (675027Z) | LF | 4,320 | $13.00 | $6.48 | $22.00 | $13.00 | $16.90 |
| 1240 | Furnish & install 2" schedule 80 HDPE conduit (directional bored) (6760065) | LF | 2,160 | $34.00 | $35.00 | $47.00 | $34.00 | $78.86 |
| 1250 | Furnish & install no. 14 copper wire, 4 conductor - black (6770388) | LF | 3,115 | $5.95 | $5.29 | $6.75 | $5.95 | $7.89 |
| 1260 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 2,885 | $6.25 | $5.39 | $6.75 | $6.25 | $8.11 |
| 1270 | Furnish & install no. 14 copper wire, 8 conductor (black) (6770393) | LF | 6,530 | $6.55 | $5.59 | $7.50 | $6.55 | $8.79 |
| 1280 | Furnish & install no. 14 copper wire, 8 conductor (gray) (6770394) | LF | 1,995 | $6.75 | $5.90 | $7.50 | $6.75 | $9.91 |
| 1290 | Furnish & install fiber optic cable-single mode (6770470) | LF | 5,140 | $4.75 | $3.46 | $11.00 | $4.75 | $9.01 |
| 1300 | Furnish & install fiber optic interconnect center (6770476) | EACH | 1 | $4,550.00 | $1,956.00 | $3,400.00 | $4,550.00 | $11,266 |
| 1310 | Furnish & install fiber optic modem (6770482) | EACH | 1 | $4,550.00 | $4,000.00 | $3,400.00 | $4,550.00 | $3,942.99 |
| 1320 | Network switch (6770493) | EACH | 6 | $6,500.00 | $3,500.00 | $3,400.00 | $6,500.00 | $4,280.95 |
| 1330 | Furnish & install electrical service for traffic signal (6800499) | EACH | 6 | $1,795.00 | $1,586.97 | $3,400.00 | $1,795.00 | $4,731.58 |
| 1340 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 2 | $975.00 | $831.17 | $1,150.00 | $975.00 | $5,632.83 |
| 1350 | F&I-17"X30"X24"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (680052C) | EACH | 32 | $1,295.00 | $1,051.00 | $1,500.00 | $1,295.00 | $4,750.00 |
| 1360 | Furnish & install 1/4" galvanized steel cable (6825090) | LF | 5,140 | $5.50 | $5.10 | $11.00 | $5.50 | $7.89 |
| 1370 | Furnish & install 10' break- away alum pedestal pole and base (6825484) | EACH | 30 | $2,100.00 | $1,884.50 | $3,400.00 | $2,100.00 | $4,731.58 |
| 1380 | F&I - contr 332/336 cabinet assembly - base mounted 01 (6845511) | EACH | 6 | $25,950 | $23,800 | $32,000 | $25,950 | $33,572 |
| 1390 | Furnish & install -12" 4 (6865720) | EACH | 2 | $1,395.00 | $1,126.65 | $1,500.00 | $1,395.00 | $4,731.58 |
| 1400 | Furnish & install - 12" 3 (6865723) | EACH | 42 | $1,000.00 | $800.00 | $1,150.00 | $1,000.00 | $3,379.70 |
| 1410 | F&I - 1-way-1SECT.(countdown hand/man emblem)ped.sig.head (6865783) | EACH | 42 | $1,095.00 | $948.30 | $1,100.00 | $1,095.00 | $2,478.45 |
| 1420 | F&I-ped push but.solid state W/ tone assem 9"X15"&sign (R- 10-3E or R10-4A) (6865797) | EACH | 42 | $795.00 | $622.20 | $610.00 | $795.00 | $1,351.88 |
| 1425 | F&I no RT/LT turn symb LED blankout W/ spanwire MNT (6865820) | EACH | 2 | $5,600.00 | $6,500.00 | $11,500 | $5,600.00 | $14,082 |
| 1440 | Backplate W/ retrorefl.borders for traff. sig. (6865834) | EACH | 44 | $395.00 | $330.60 | $450.00 | $395.00 | $563.28 |
| 1450 | F&I - video detection system W/ one camera, hardware & lead-in (6886040) | EACH | 6 | $9,000.00 | $6,950.00 | $21,000 | $9,000.00 | $14,082 |
| 1460 | Furnish & install video detection camera W/ hardware & lead-in (6886042) | EACH | 16 | $9,000.00 | $6,850.00 | $19,500 | $9,000.00 | $13,000 |
| 1470 | Furnish & install concrete cabinet foundation (6887951) | EACH | 6 | $1,695.00 | $1,479.00 | $3,400.00 | $1,695.00 | $2,816.42 |
| 1480 | Furnish & install factory terminated patch panel (6888082) | EACH | 3 | $5,000.00 | $1,627.50 | $3,400.00 | $5,000.00 | $6,196.11 |
| 1490 | Powdercoating per mast arm over base (6888166) | EACH | 21 | $1,000.00 | $3,500.00 | $4,725.00 | $1,000.00 | $9,012.53 |
| 1500 | Decorative option per mast arm (6888168) | EACH | 21 | $1,000.00 | $5,000.00 | $6,100.00 | $1,000.00 | $2,253.13 |
| 1510 | Design, furnish & install steel pole with twin mast arms including foundation 01 (6888177) | EACH | 2 | $55,000 | $46,000 | $79,000 | $55,000 | $230,000 |
| 1520 | Design, furnish & install steel pole with mast arm including foundation (6888179) | EACH | 17 | $45,000 | $35,000 | $57,400 | $45,000 | $100,000 |
| 1525 | Powdercoating option for 10' aluminum pedestal pole (6888194) | EACH | 29 | $2,500.00 | $220.00 | $3,400.00 | $2,500.00 | $1,689.85 |
| 1530 | Conc. for structures - class 4000(culvert) (7011402) | CY | 28 | $3,290.00 | $4,725.00 | $4,300.00 | $3,275.00 | $2,365.79 |
| 1540 | Straight headwall for 60" circular pipe-2 lines (7016196) | EACH | 2 | $32,059 | $29,650 | $35,000 | $29,000 | $23,883 |
| 1550 | Reinf. steel for structures (roadway) (7031100) | LB | 2,542 | $2.50 | $9.50 | $5.00 | $3.75 | $2.25 |
| 1560 | 18" RC pipe cul.-class V (7141133) | LF | 328 | $100.65 | $164.00 | $118.00 | $175.00 | $109.52 |
| 1570 | 14"X 23" horizontal elliptical(HE) RC pipe cul.- class HE-IV (714114D) | LF | 31 | $191.95 | $231.00 | $213.00 | $280.00 | $299.44 |
| 1580 | 36" reinforced concrete pipe (class V special)trenchless (7141889) | LF | 122 | $2,313.52 | $3,800.00 | $2,330.00 | $3,100.00 | $4,399.55 |
| 1590 | 15" smooth wall pipe (7143615) | LF | 168 | $88.95 | $119.00 | $86.00 | $105.00 | $108.95 |
| 1600 | 18" smooth wall pipe (7143618) | LF | 15,808 | $90.63 | $135.00 | $84.00 | $140.00 | $113.61 |
| 1610 | 24" smooth wall pipe (7143624) | LF | 3,631 | $118.77 | $184.00 | $114.00 | $150.00 | $135.16 |
| 1620 | 30" smooth wall pipe (7143630) | LF | 1,098 | $152.11 | $240.00 | $160.00 | $175.00 | $167.10 |
| 1630 | 36" smooth wall pipe (7143636) | LF | 368 | $195.04 | $265.00 | $219.00 | $355.00 | $222.10 |
| 1640 | 60" smooth wall pipe (7143660) | LF | 236 | $430.41 | $967.00 | $540.00 | $500.00 | $363.82 |
| 1650 | Catch basin -type 1 CB - type 1 (7191005) | EACH | 11 | $6,178.74 | $4,971.00 | $5,000.00 | $7,460.00 | $8,617.71 |
| 1660 | Catch basin - type 1 special (7191050) | EACH | 2 | $6,627.08 | $5,514.00 | $5,000.00 | $7,700.00 | $7,595.51 |
| 1665 | Temporary traffic rated grate for type 1 catch basin (grate only) (719105A) | EACH | 6 | $1,923.21 | $4,800.00 | $3,000.00 | $1,000.00 | $1,889.46 |
| 1670 | Catch basin -type 9 (7191205) | EACH | 24 | $4,489.80 | $4,860.00 | $5,000.00 | $6,825.00 | $6,571.40 |
| 1680 | Catch basin -type 9 with standard 3' X 6' box (7191208) | EACH | 2 | $6,276.46 | $7,452.00 | $8,000.00 | $15,875 | $11,135 |
| 1690 | Catch basin -type 16 (7191605) | EACH | 139 | $6,896.78 | $8,940.00 | $8,100.00 | $9,625.00 | $7,592.39 |
| 1700 | Catch basin -type 18 (7191650) | EACH | 13 | $10,300 | $12,560 | $12,700 | $12,900 | $9,257.11 |
| 1710 | Drop inlet (24" X 24") (7192010) | EACH | 24 | $4,845.39 | $4,950.00 | $4,900.00 | $6,300.00 | $4,847.11 |
| 1720 | Drop inlet (24" X 24") with standard 4' X 4' box (7192011) | EACH | 1 | $5,693.26 | $7,017.00 | $9,600.00 | $7,475.00 | $5,665.82 |
| 1730 | Drop inlet (24" X 36") (7192020) | EACH | 2 | $5,826.95 | $5,724.00 | $4,900.00 | $6,425.00 | $5,034.15 |
| 1740 | Manhole (7192105) | EACH | 5 | $4,810.82 | $5,523.00 | $4,900.00 | $8,325.00 | $6,468.41 |
| 1750 | 24" X 24" junction box (7192205) | EACH | 4 | $4,839.95 | $5,010.00 | $4,900.00 | $7,600.00 | $4,932.67 |
| 1760 | 24" X 36" junction box (7192215) | EACH | 2 | $5,228.86 | $5,296.00 | $4,900.00 | $7,600.00 | $5,498.03 |
| 1770 | 36" X 36" junction box (7192240) | EACH | 4 | $4,950.22 | $5,580.00 | $4,900.00 | $7,600.00 | $5,798.17 |
| 1780 | 48" X 48" junction box (7192260) | EACH | 1 | $6,042.51 | $6,588.00 | $5,800.00 | $8,550.00 | $6,818.05 |
| 1790 | Catch basin - type 9(top only) (7196151) | EACH | 1 | $1,994.88 | $2,145.00 | $2,500.00 | $1,700.00 | $7,026.82 |
| 1800 | Concrete curb (9" X 15") (7201000) | LF | 190 | $34.00 | $66.50 | $48.00 | $45.85 | $53.34 |
| 1810 | Concrete curb (transition) (7201100) | LF | 100 | $90.00 | $56.35 | $100.00 | $34.05 | $143.30 |
| 1820 | Concrete curb and gutter(1'-6") vertical face (7203110) | LF | 1,300 | $28.00 | $46.00 | $47.00 | $41.40 | $53.52 |
| 1830 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 42,965 | $34.00 | $29.40 | $47.50 | $29.45 | $37.00 |
| 1840 | Concrete curb and gutter (2'-0") ogee (7203230) | LF | 72 | $36.00 | $80.30 | $100.00 | $34.05 | $39.26 |
| 1850 | Concrete sidewalk(4" uniform) (7204100) | SY | 14,913 | $60.00 | $65.30 | $107.00 | $77.80 | $83.00 |
| 1860 | Concrete sidewalk(6" uniform) (7204600) | SY | 40 | $75.00 | $152.10 | $143.00 | $112.25 | $129.24 |
| 1870 | Detectable warning material (7204900) | SF | 1,613 | $55.00 | $38.75 | $167.00 | $50.00 | $59.71 |
| 1880 | Concrete driveway(6" uniform) (7205000) | SY | 2,445 | $75.00 | $152.30 | $143.00 | $119.75 | $120.00 |
| 1890 | Concrete median (7206000) | SY | 2,463 | $90.00 | $145.35 | $145.00 | $86.75 | $100.00 |
| 1900 | Pedestrian ramp construction (7209000) | SY | 1,675 | $145.00 | $185.00 | $400.00 | $159.50 | $170.00 |
| 1910 | 6'X 8' P.C. box culvert {AASHTO M-259} FH = 9' (7222578) | LF | 104 | $2,183.21 | $3,590.00 | $2,950.00 | $2,275.00 | $2,253.13 |
| 1915 | Tree protection (8114011) | LS | 1 | $20,000 | $5,000.00 | $75,000 | $1,350.00 | $21,365 |
| 1920 | Planted median subsurface drainage (8020100) | SY | 6,900 | $64.95 | $105.00 | $91.50 | $125.00 | $142.83 |
| 1925 | 4" perf pipe underdrain W/ geotextile (8021204) | LF | 910 | $68.34 | $58.00 | $59.00 | $46.00 | $46.83 |
| 1940 | Rip-rap (class B) (8041020) | TON | 2,061 | $98.77 | $180.00 | $95.50 | $130.00 | $97.53 |
| 1950 | Rip-rap (class C) (8041030) | TON | 139 | $109.57 | $216.00 | $120.00 | $140.00 | $111.44 |
| 1960 | Geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 1,500 | $5.15 | $8.00 | $4.00 | $3.00 | $2.88 |
| 1970 | MT3 leading end treatment TL3 (8051151) | EACH | 8 | $2,534.04 | $2,534.04 | $2,800.00 | $3,000.00 | $3,379.70 |
| 1980 | MB trailing end treatment (8051710) | EACH | 8 | $1,669.95 | $1,669.95 | $2,100.00 | $1,800.00 | $1,746.18 |
| 1990 | MGS3 GR standard shoulder (8052100) | LF | 3,712.50 | $22.29 | $22.29 | $25.00 | $26.75 | $25.29 |
| 2000 | MGS3CS GR compressed shoulder (8052150) | LF | 100 | $32.16 | $32.16 | $38.00 | $31.75 | $32.67 |
| 2010 | Woven wire fence - type 1 without barbed wire (8061100) | LF | 3,550 | $15.00 | $9.80 | $45.00 | $13.00 | $11.04 |
| 2020 | 12' wide - chain link fence gate (72"HT) (8064600) | EACH | 4 | $3,500.00 | $1,750.00 | $1,200.00 | $3,300.00 | $1,971.49 |
| 2030 | Temporary barrier fence (orange) (8068301) | LF | 2,050 | $5.00 | $2.37 | $4.50 | $3.75 | $3.42 |
| 2040 | Right of way marker(rebar and cap) (8091010) | EACH | 234 | $175.00 | $195.00 | $275.00 | $165.00 | $112.66 |
| 2050 | Right of way plat (8091050) | LS | 1 | $30,000 | $10,500 | $35,000 | $20,000 | $22,531 |
| 2060 | Permanent cover (8100100) | ACRE | 20.29 | $1,325.00 | $1,498.53 | $1,600.00 | $1,325.00 | $1,914.88 |
| 2070 | Temporary cover (8100200) | ACRE | 30.44 | $1,150.00 | $1,082.87 | $1,400.00 | $1,150.00 | $1,689.85 |
| 2080 | Select material (8101100) | CY | 290 | $37.01 | $32.92 | $80.00 | $40.00 | $48.47 |
| 2090 | Compost (8101105) | CY | 5,457 | $76.60 | $5.00 | $65.00 | $125.00 | $24.78 |
| 2100 | Fertilizer (nitrogen) (8104005) | LB | 2,029.30 | $3.75 | $2.00 | $4.50 | $3.75 | $2.82 |
| 2110 | Fertilizer (phosphoric acid) (8104010) | LB | 2,029.30 | $3.75 | $2.00 | $4.50 | $3.75 | $2.82 |
| 2120 | Fertilizer (potash) (8104015) | LB | 2,029.30 | $3.75 | $2.00 | $4.50 | $3.75 | $2.82 |
| 2130 | Agricultural granular lime (8105005) | LB | 40,586 | $0.40 | $2.00 | $0.70 | $0.40 | $0.39 |
| 2140 | Selective watering (8109050) | GAL | 135,750 | $0.08 | $0.12 | $0.10 | $0.08 | $0.06 |
| 2150 | Mowing (8109901) | ACRE | 101.47 | $400.00 | $410.96 | $500.00 | $400.00 | $506.98 |
| 2160 | Arborist (8110002) | HR | 80 | $350.00 | $180.00 | $200.00 | $525.00 | $112.66 |
| 2165 | Turf reinforcement matting (TRM) type 1 (8151101) | MSY | 18.46 | $1,600.00 | $3,130.82 | $4,600.00 | $3,800.00 | $5,913.83 |
| 2170 | Temporary erosion control blanket (ecb) (8151110) | MSY | 16.71 | $3,800.00 | $2,145.88 | $1,950.00 | $1,600.00 | $1,329.75 |
| 2190 | Hydraulic erosion control product (hecp) - type 2 (8151202) | ACRE | 18.47 | $2,500.00 | $2,499.07 | $3,000.00 | $2,500.00 | $3,718.47 |
| 2200 | Hydraulic erosion control product (hecp) - type 4 (8151204) | ACRE | 1.83 | $4,900.00 | $5,696.90 | $5,900.00 | $4,900.00 | $3,723.78 |
| 2210 | Inlet structure filter - type F (weighted) (8152004) | LF | 1,450 | $16.63 | $10.65 | $18.00 | $18.00 | $18.31 |
| 2220 | Inlet structure filter- type F (non-weighted) (8152006) | LF | 1,450 | $14.97 | $10.65 | $16.00 | $15.00 | $5.14 |
| 2230 | Sediment tubes for ditch checks (8152007) | LF | 1,238 | $15.74 | $10.65 | $16.00 | $15.00 | $10.98 |
| 2240 | Silt fence (8153000) | LF | 21,087 | $4.00 | $3.25 | $4.00 | $3.00 | $3.74 |
| 2250 | Replace/repair silt fence (8153090) | LF | 2,109 | $4.50 | $3.64 | $6.00 | $4.50 | $2.93 |
| 2260 | Cleaning silt basins (8154010) | CY | 9,439 | $7.48 | $35.00 | $20.00 | $38.00 | $56.87 |
| 2270 | Porous baffle (8154011) | LF | 600 | $6.00 | $7.38 | $7.50 | $8.50 | $13.24 |
| 2280 | Floating skimmer (8154012) | EACH | 4 | $5,782.84 | $10,000 | $9,500.00 | $4,650.00 | $1,632.30 |
| 2290 | Removal of silt retained by silt fence (8154050) | LF | 5,272 | $7.48 | $1.54 | $5.00 | $3.15 | $54.72 |
| 2300 | Cleaning inlet structure filters (8156200) | EACH | 875 | $124.73 | $125.00 | $220.00 | $150.00 | $112.66 |
| 2310 | Inlet structure filter - type D1 (8156205) | EACH | 65 | $762.60 | $785.03 | $1,000.00 | $605.00 | $535.12 |
| 2320 | Filter material for inlet structure filter - type D1 (8156207) | EACH | 38 | $207.88 | $319.75 | $300.00 | $175.00 | $168.99 |
| 2330 | Aggregate no.5 or 57 for erosion control (8156410) | TON | 50 | $81.53 | $190.00 | $70.00 | $135.00 | $66.26 |
| 2340 | Stabilized construction entrance (8156490) | SY | 7,200 | $17.93 | $37.75 | $39.00 | $21.50 | $21.65 |
| 2350 | Detention pond (8161010) | LS | 1 | $155,000 | $235,000 | $315,000 | $195,000 | $211,179 |
| 2360 | Aggregate diaphragm (8161100) | CY | 30 | $302.00 | $330.00 | $100.00 | $350.00 | $176.60 |
| 2370 | On-the-job trainee (roadway) (9001000) | HR | 26,520 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of April 14, 2026. Compiled by Mirage Metrics.