C.R. Jackson, Inc.: SCDOT bid record
C.R. Jackson, Inc. submitted 198 bids on South Carolina DOT contracts in the data, from 11 JAN 2022 to 13 OCT 2026, and was the low bidder on 73 of them (37%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $976,527,967
- Latest bid
- 13 OCT 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 62 | 23 | 37% |
| 2023 | 19 | 4 | 21% |
| 2024 | 50 | 19 | 38% |
| 2025 | 34 | 8 | 24% |
| 2026 | 33 | 19 | 58% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 70 | 22 | 31% |
| District 1 | 62 | 26 | 42% |
| District 7 | 38 | 19 | 50% |
| District 4 | 18 | 3 | 17% |
| District 6 | 8 | 1 | 13% |
| District 1, District 7 | 2 | 2 | 100% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Palmetto Corp. of Conway | 161 | 81 of 161 |
| King Asphalt, Inc. | 46 | 23 of 46 |
| Blythe Construction, Inc. | 42 | 21 of 42 |
| Lynches River Contracting, Inc. | 37 | 17 of 37 |
| Reeves Construction Company | 37 | 7 of 37 |
| Eurovia Atlantic Coast LLC | 30 | 14 of 30 |
| Truerock Construction, LLC | 24 | 14 of 24 |
| Coastal Asphalt, LLC | 10 | 7 of 10 |
| Lci-Lineberger Construction, Inc. | 10 | 4 of 10 |
| Southern Asphalt, Inc. | 9 | 4 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 OCT 2026 | 0276070 | District 7 | I-20 5-23 MM Interstate Preservation | 1 of 2 | $29,980,495 | Low, 5.0% under the second |
| 13 OCT 2026 | 5578320 | District 5 | I-20 136-141 Interstate Preservation | 2 of 2 | $10,240,453 | +5.0% |
| 13 OCT 2026 | 8876840 | District 1, District 7 | I-20 23-37 WB and 37-49 EB Interstate Preservation | 1 of 3 | $20,741,679 | Low, 5.0% under the second |
| 09 SEP 2026 | 1377860 | District 4 | 2027 Chesterfield Pavement Improvement | 1 of 3 | $8,176,684 | Low, 13% under the second |
| 09 SEP 2026 | 2177740 | District 5 | 2027 PIPP Resurfacing 6/3/2026 3:28:07 PM | 1 of 3 | $5,480,783 | Low, 17% under the second |
| 09 SEP 2026 | 2777910 | District 6 | FDP, mill, STB, Intm B Spec, CMRB | 3 of 3 | $9,994,217 | +15% |
| 09 SEP 2026 | 2977880 | District 4 | 2027 Lancaster Pavement Improvement | 1 of 4 | $7,988,637 | Low, 2.0% under the second |
| 09 SEP 2026 | 3177790 | District 1 | 2027 Lee Pavement Improvement with CTC | 1 of 3 | $5,476,159 | Low, 7.0% under the second |
| 09 SEP 2026 | 3277620 | District 1 | 2027 Lexington County Pavement Improvement | 1 of 4 | $7,657,402 | Low, 10% under the second |
| 09 SEP 2026 | 3477780 | District 5 | 2027 Marion Pavement Improvement | 1 of 3 | $6,673,470 | Low, 0.0% under the second |
| 09 SEP 2026 | 4376690 | District 1 | S-25 (Old Manning Road) Road Departure Mitigation | 1 of 3 | $2,296,744 | Low, 19% under the second |
| 09 SEP 2026 | 5577840 | District 5 | 2026 CTC Resurfacing | 1 of 2 | $6,181,144 | Low, 16% under the second |
| 09 SEP 2026 | 5777540 | District 7 | 2027 Allendale and Hampton Pavement Improvement/CTC | 2 of 2 | $11,725,283 | +7.0% |
| 09 SEP 2026 | 5777760 | District 7 | 2027 Calhoun and Orangeburg Pavement Improvement | 1 of 3 | $8,978,047 | Low, 8.0% under the second |
| 11 AUG 2026 | 1477330 | District 7 | 2026 Clarendon CTC Resurfacing | 2 of 5 | $377,856 | +19% |
| 11 AUG 2026 | 3577310 | District 5 | 2026 Marlboro CTC Resurfacing | 3 of 3 | $1,824,822 | +15% |
| 11 AUG 2026 | 8876590 | District 1 | S-73 (Fish Hatchery Road) Roadway Departure Mitigation | 3 of 3 | $943,765 | +11% |
| 11 AUG 2026 | 8876600 | District 7 | SC (Old Number Six Hwy) Road Departure Mitigation | 5 of 5 | $2,733,743 | +21% |
| 09 JUN 2026 | 2163100 | District 5 | SC 403 (N Bethel Rd) at SC 341 (Olanta Hwy) Intersection Imp | 3 of 5 | $2,877,692 | +4.0% |
| 14 APR 2026 | 3270840 | District 1 | Improvements to S-48 (Columbia Ave) in Chapin | 4 of 5 | $65,904,453 | +21% |
| 10 MAR 2026 | 1374080 | District 4 | 2026 Chesterfield Pavement Improvement | 1 of 3 | $5,659,514 | Low, 0.0% under the second |
| 10 MAR 2026 | 1673460 | District 5 | 2026 Darlington Pavement Improvement | 1 of 3 | $8,368,917 | Low, 2.0% under the second |
| 10 MAR 2026 | 2173480 | District 5 | 2026 PIPP Resurfacing | 1 of 3 | $5,335,851 | Low, 9.0% under the second |
| 10 MAR 2026 | 2974520 | District 4 | 2026 District 4 Pavement Improvement | 3 of 4 | $8,821,665 | +10% |
| 10 MAR 2026 | 3876420 | District 7 | 2026 Orangeburg CTC Resurfacing | 3 of 3 | $7,224,875 | +12% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.