Blythe Construction, Inc.: SCDOT bid record

Blythe Construction, Inc. submitted 76 bids on South Carolina DOT contracts in the data, from 09 JAN 2024 to 13 OCT 2026, and was the low bidder on 22 of them (29%). When it was not low, its total sat a median +12% above the low bid.

Owner
South Carolina DOT
Low bid volume
$173,268,308
Latest bid
13 OCT 2026
Data through
13 OCT 2026
76Bids
22Low bids
29Win rate, percent
+12%Median gap to the low bid when not low, 54 bids

By year

YearBidsLow bidsWin rate
202424625%
202528932%
202624729%
Blythe Construction, Inc., SCDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 7391026%
District 120735%
District 610330%
District 44250%
District 2200%
District 1, District 7100%
Blythe Construction, Inc., SCDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Permanent yellow pavement markers BI-dir.- 4"X4"6301100EACH6956 (81%)$6.00$6.50
Permanent grassing for non-permitted resurfacing projects8100102ACRE6841 (60%)$3,236.39$3,360.00
Permanent clear pavement markers- mono-dir.- 4"X4"6300005EACH4638 (83%)$5.88$6.00
Maintenance stone3059900TON4836 (75%)$53.20$92.63
4"yellow solid line(PVT.edge&no passing zone)-fast dry paint6240110LF4433 (75%)$0.12$0.13
4" yellow broken lines(gaps exc) - fast dry paint6240105LF4233 (79%)$0.12$0.12
Permanent construction signs (ground mounted)6051120SF5032 (64%)$6.00$7.00
24" white solid lines (stop/diagonal lines)-fast dry paint6240025LF4532 (71%)$1.00$1.00
4" white solid lines (PVT. edge lines)-fast dry paint6240010LF4332 (74%)$0.12$0.13
Hauling of excavated shoulder material2072000STA5631 (55%)$70.00$66.17
4" white broken lines -(gaps excluded)-fast dry paint6240005LF4230 (71%)$0.12$0.13
Furnish & install 1.0" schedule 80 PVC conduit6750275LF4025 (63%)$17.50$17.50
Blythe Construction, Inc., SCDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Blythe Construction, Inc., SCDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
13 OCT 20264175571District 22026 Saluda CTC Resurfacing3 of 3$1,619,923+36%
13 OCT 20264676540District 4I-77 MM 75.86 - 82.5 MM Interstate Preservation2 of 2$28,488,004+17%
13 OCT 20268876840District 1, District 7I-20 23-37 WB and 37-49 EB Interstate Preservation2 of 3$21,871,070+5.0%
09 SEP 20260277810District 72026 Aiken CTC Resurfacing2 of 2$2,912,991+18%
09 SEP 20260277850District 72027 Aiken Pavement Improvement2 of 2$10,934,675+8.0%
09 SEP 20262777910District 6FDP, mill, STB, Intm B Spec, CMRB1 of 3$8,662,247Low, 15% under the second
09 SEP 20263277620District 12027 Lexington County Pavement Improvement3 of 4$8,880,200+16%
09 SEP 20264376690District 1S-25 (Old Manning Road) Road Departure Mitigation3 of 3$3,339,851+45%
09 SEP 20265777540District 72027 Allendale and Hampton Pavement Improvement/CTC1 of 2$10,961,308Low, 7.0% under the second
09 SEP 20265777760District 72027 Calhoun and Orangeburg Pavement Improvement3 of 3$11,039,026+23%
11 AUG 20261477330District 72026 Clarendon CTC Resurfacing5 of 5$460,126+44%
11 AUG 20268876590District 1S-73 (Fish Hatchery Road) Roadway Departure Mitigation1 of 3$849,085Low, 8.0% under the second
11 AUG 20268876600District 7SC (Old Number Six Hwy) Road Departure Mitigation1 of 5$2,251,567Low, 5.0% under the second
10 MAR 20260276160District 72026 Aiken Rehab/PM2 of 2$8,389,398+3.0%
10 MAR 20260676010District 72026 Barnwell Pavement Improvement2 of 3$6,591,252+5.0%
10 MAR 20260676350District 72026 Barnwell CTC Resurfacing1 of 3$337,289Low, 29% under the second
10 MAR 20263876420District 72026 Orangeburg CTC Resurfacing2 of 3$7,001,173+9.0%
10 MAR 20264076400District 12026 Richland Pavement Improvement1 of 4$7,500,438Low, 3.0% under the second
10 MAR 20265273760District 22026 District 2 Pavement Improvement2 of 3$13,177,667+7.0%
13 JAN 20260275430District 72026 Aiken Pavement Improvement2 of 2$10,065,536+21%
13 JAN 20260575820District 72026 Bamberg PIPP/CTC3 of 3$7,277,932+16%
13 JAN 20262775560District 62026 Jasper CTC Resurfacing1 of 4$2,929,741Low, 14% under the second
13 JAN 20263275880District 12026 Lexington Pavement Improvement2 of 4$9,943,764+12%
13 JAN 20263875970District 72026 Orangeburg Pavement Improvement2 of 3$11,357,251+10%
09 DEC 20254674110District 42026 Interstate Preservation I-77 83-911 of 2$31,348,617Low, 27% under the second
Blythe Construction, Inc.: latest SCDOT bids in the data

How this record was read

SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy