SCDOT contract 0575820 bid tabulation
2026 Bamberg PIPP/CTC. Let by South Carolina DOT on January 13, 2026, Bamberg, District 7. 3 bids received; low bid $6,299,359 by C.R. Jackson, Inc..
- Owner
- South Carolina DOT
- Letting
- 13 JAN 2026
- Pay items
- 52
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.R. Jackson, Inc. | $6,299,359 | Low |
| 2 | Palmetto Corp. of Conway | $6,716,293 | +7.0% |
| 3 | Blythe Construction, Inc. | $7,277,932 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.R. Jackson, Inc. | 2. Palmetto Corp. of Conway | 3. Blythe Construction, Inc. |
|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $314,000 | $275,000 | $363,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $125,000 | $125,000 | $27,000 |
| 0030 | Railroad insurance and flagging CSX (1071403) | LS | 1 | $25,000 | $28,000 | $26,500 |
| 0040 | Borrow excavation (2033000) | CY | 2,982 | $27.00 | $65.30 | $108.00 |
| 0050 | Excavation for shoulder paving (2036000) | STA | 1,417.15 | $110.00 | $46.05 | $63.50 |
| 0060 | Hauling of excavated shoulder material (2072000) | STA | 1,417.15 | $45.00 | $84.05 | $134.75 |
| 0070 | Maintenance stone (3059900) | TON | 51.80 | $200.00 | $115.00 | $62.00 |
| 0080 | HMA shoulder widening course (3104000) | TON | 7,462.99 | $85.00 | $94.55 | $101.50 |
| 0090 | Liquid asphalt binder PG64-22 (4011004) | TON | 1,824.50 | $540.00 | $555.00 | $620.00 |
| 0100 | Aramid fiber (4011500) | LB | 4,290 | $65.00 | $67.00 | $70.00 |
| 0110 | Full depth asph. pav. patching 4" unif. (4012040) | SY | 3,020 | $72.00 | $58.50 | $70.07 |
| 0120 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 2,160 | $72.00 | $73.20 | $65.50 |
| 0130 | Milling existing asphalt pavement 2.0" (4013120) | SY | 12,500 | $3.25 | $3.30 | $5.00 |
| 0140 | Milling existing asphalt pavement (variable) (4013990) | SY | 8,800 | $15.00 | $17.35 | $28.00 |
| 0150 | Asphalt surface course type B (4040320) | TON | 11,061.49 | $88.00 | $114.50 | $105.00 |
| 0160 | Asphalt surface course type C (4040340) | TON | 9,421.26 | $90.00 | $101.20 | $98.00 |
| 0170 | Asphalt surface course type D (4040350) | TON | 3,001.60 | $105.00 | $135.55 | $131.00 |
| 0180 | Driveway paving-surface type D (4047230) | TON | 835.63 | $160.00 | $268.00 | $373.00 |
| 0190 | Traffic control (6011000) | LS | 1 | $569,000 | $295,550 | $390,500 |
| 0200 | Permanent construction signs (ground mounted) (6051120) | SF | 2,684 | $5.50 | $5.45 | $5.45 |
| 0210 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 17,350 | $0.12 | $0.11 | $0.11 |
| 0220 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 219,600 | $0.12 | $0.10 | $0.10 |
| 0230 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 200 | $0.12 | $0.01 | $0.01 |
| 0240 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 1,410 | $1.00 | $1.50 | $1.50 |
| 0250 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 2 | $10.00 | $25.00 | $25.00 |
| 0260 | White word message "only"- fast dry paint (6240035) | EACH | 2 | $10.00 | $25.00 | $25.00 |
| 0270 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 2 | $10.00 | $35.00 | $35.00 |
| 0280 | White lane drop arrow (left or right)-fast dry paint (6240043) | EACH | 2 | $10.00 | $100.00 | $100.00 |
| 0290 | Railroad crossing symbols - fast dry paint (6240045) | EACH | 2 | $10.00 | $0.01 | $0.01 |
| 0300 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 9,020 | $0.12 | $0.11 | $0.11 |
| 0310 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 161,280 | $0.12 | $0.10 | $0.10 |
| 0320 | 24" yellow diagonal lines - fast dry paint (6240115) | LF | 100 | $1.00 | $0.01 | $0.01 |
| 0330 | 4" white broken lines(gaps excl.)perm.PVMT.marking (6251005) | LF | 9,800 | $0.75 | $0.44 | $0.44 |
| 0340 | 4" white solid lines (PVT. edge lines) perm.PVMT.marking (6251010) | LF | 110,300 | $0.42 | $0.42 | $0.42 |
| 0350 | 8" white solid lines perm.PVMT.markings (6251015) | LF | 200 | $2.75 | $4.00 | $4.00 |
| 0360 | 24" white solid lines (stop/diag lines)- perm.PVMT.marking (6251025) | LF | 755 | $10.00 | $11.00 | $11.00 |
| 0370 | White single arrows (LT, STRGHT, RT) perm.PVMT.marking (6251030) | EACH | 2 | $100.00 | $125.00 | $125.00 |
| 0380 | White word message "only" - perm.PVMT.marking (6251035) | EACH | 2 | $100.00 | $135.00 | $135.00 |
| 0390 | White combination arrows(STR&RT.or STR& LT)perm.PVMT.marking (6251040) | EACH | 2 | $100.00 | $150.00 | $150.00 |
| 0400 | White lane drop arrow(LT.or RT.)perm.PVMT.marking (6251043) | EACH | 2 | $200.00 | $350.00 | $350.00 |
| 0410 | Railroad crossing symbols - perm.PVMT.marking (6251045) | EACH | 1 | $500.00 | $700.00 | $700.00 |
| 0420 | 4" yellow broken lines(gaps exc)perm.PVMT.marking (6251064) | LF | 4,760 | $0.42 | $0.44 | $0.44 |
| 0430 | 4" yellow solid lines(PVT.edge lines) perm.PVMT.marking (6251074) | LF | 81,140 | $0.42 | $0.42 | $0.42 |
| 0440 | 24" yellow solid lines - perm.PVMT.marking (6251080) | LF | 100 | $7.50 | $15.00 | $15.00 |
| 0450 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 495 | $6.00 | $4.25 | $4.25 |
| 0460 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 70 | $6.00 | $4.25 | $4.25 |
| 0470 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 654 | $6.00 | $4.25 | $4.25 |
| 0480 | Milled-in rumble strip (6321000) | MI | 18.29 | $950.00 | $500.00 | $500.00 |
| 0490 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 25 | $20.00 | $17.50 | $17.50 |
| 0500 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 350 | $1.40 | $1.15 | $1.15 |
| 0510 | Sawcut for loop detector (6780495) | LF | 130 | $10.50 | $9.61 | $9.61 |
| 0520 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 14.91 | $3,300.00 | $3,245.16 | $3,350.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of January 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.