| 0010 | Mobilization (1031000) | LS | 1 | $630,000 | $445,000 | $455,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $230,500 | $65,000 | $265,000 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 2 | $5,500.00 | $4,390.69 | $1,300.00 |
| 0040 | Railroad insurance and flagging NS (1071403) | LS | 1 | $35,000 | $15,000 | $52,000 |
| 0050 | Removal & disposal of existing pavement (2023000) | SY | 25 | $17.00 | $100.00 | $37.50 |
| 0060 | Borrow excavation (2033000) | CY | 11,988 | $59.50 | $88.90 | $62.25 |
| 0070 | Excavation for shoulder paving (2036000) | STA | 1,091 | $48.00 | $58.90 | $49.45 |
| 0080 | Hauling of excavated shoulder material (2072000) | STA | 1,091 | $85.00 | $89.75 | $122.45 |
| 0090 | Maintenance stone (3059900) | TON | 484 | $50.00 | $52.50 | $130.00 |
| 0100 | Cement modified recycled base (12" unif)-curing method B (3063242) | SY | 21,900 | $9.75 | $10.70 | $10.50 |
| 0110 | Portland cement for cement modified recycled base course (3064000) | TON | 822 | $270.00 | $219.00 | $230.00 |
| 0120 | HMA shoulder widening course (3104000) | TON | 4,399.17 | $83.00 | $101.00 | $99.15 |
| 0130 | Liquid asphalt binder PG64-22 (4011004) | TON | 2,251.62 | $660.00 | $604.00 | $595.00 |
| 0140 | Full depth asph. pav. patching 4" unif. (4012040) | SY | 14,480 | $34.00 | $46.75 | $48.35 |
| 0150 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 2,000 | $46.00 | $56.70 | $63.85 |
| 0160 | Full depth asph. pav. patching 8" unif (4012080) | SY | 14,910 | $68.00 | $74.00 | $81.05 |
| 0170 | Full depth asph. pav. patching 10"unif (4012100) | SY | 8,620 | $87.00 | $93.75 | $104.30 |
| 0180 | Milling existing asphalt pavement 1.0" (4013110) | SY | 32,295 | $2.05 | $3.20 | $2.25 |
| 0190 | Milling existing asphalt pavement 2.0" (4013120) | SY | 189,232 | $2.95 | $4.30 | $4.35 |
| 0200 | Milling existing asphalt pavement (variable) (4013990) | SY | 12,705 | $5.95 | $31.15 | $17.25 |
| 0210 | Asphalt surface course type B (4040320) | TON | 22,462.79 | $88.00 | $99.25 | $111.85 |
| 0220 | Asphalt surface course type C (4040340) | TON | 7,822.94 | $92.50 | $98.25 | $108.05 |
| 0230 | Asphalt surface course type E (4040360) | TON | 3,446.08 | $96.00 | $92.80 | $114.30 |
| 0240 | Driveway paving-surface type B (4047210) | TON | 957.25 | $218.00 | $213.90 | $235.00 |
| 0250 | Driveway paving-surface type C (4047220) | TON | 389.25 | $218.00 | $215.00 | $270.00 |
| 0260 | Traffic control (6011000) | LS | 1 | $812,900 | $503,005 | $708,815 |
| 0270 | Permanent construction signs (ground mounted) (6051120) | SF | 5,444 | $6.35 | $6.10 | $5.75 |
| 0280 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 9,162 | $0.12 | $0.11 | $0.11 |
| 0290 | 6" white broken lines -(gaps excluded)-fast dry paint (6240007) | LF | 330 | $0.18 | $0.16 | $0.16 |
| 0300 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 509,860 | $0.12 | $0.11 | $0.11 |
| 0310 | 6" white solid lines (PVT. edge lines)-fast dry paint (6240012) | LF | 68,310 | $0.18 | $0.15 | $0.15 |
| 0320 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 480 | $0.12 | $0.10 | $0.10 |
| 0330 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 4,030 | $0.55 | $0.50 | $0.50 |
| 0340 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 6 | $11.00 | $10.00 | $10.00 |
| 0350 | White word message "only"- fast dry paint (6240035) | EACH | 6 | $11.00 | $10.00 | $10.00 |
| 0360 | Railroad crossing symbols - fast dry paint (6240045) | EACH | 12 | $16.50 | $15.00 | $15.00 |
| 0370 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 29,650 | $0.12 | $0.11 | $0.11 |
| 0380 | 6" yellow broken lines(gaps exc) - fast dry paint (6240107) | LF | 5,955 | $0.18 | $0.16 | $0.16 |
| 0390 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 559,115 | $0.12 | $0.11 | $0.11 |
| 0400 | 6"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240111) | LF | 64,515 | $0.18 | $0.15 | $0.15 |
| 0410 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 2,922 | $0.50 | $0.45 | $0.45 |
| 0420 | 6" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007) | LF | 110 | $0.88 | $0.80 | $0.80 |
| 0430 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 153,900 | $0.48 | $0.44 | $0.44 |
| 0440 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 22,770 | $0.88 | $0.80 | $0.80 |
| 0450 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 160 | $2.75 | $2.50 | $2.50 |
| 0460 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 1,286 | $9.90 | $9.00 | $9.00 |
| 0470 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 2 | $66.00 | $60.00 | $60.00 |
| 0480 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 2 | $66.00 | $60.00 | $60.00 |
| 0490 | Railroad crossing symbols - thermoplastic - 125 mil. (6271045) | EACH | 4 | $440.00 | $400.00 | $400.00 |
| 0500 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 8,200 | $0.48 | $0.44 | $0.44 |
| 0510 | 6" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271066) | LF | 1,985 | $0.88 | $0.80 | $0.80 |
| 0520 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 170,365 | $0.46 | $0.44 | $0.44 |
| 0530 | 6" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271076) | LF | 21,505 | $0.88 | $0.80 | $0.80 |
| 0540 | Evaluation of pavement marking retroreflectivity (6290001) | LS | 1 | $8,800.00 | $8,000.00 | $8,000.00 |
| 0550 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 78 | $5.50 | $5.00 | $5.00 |
| 0560 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 54 | $5.50 | $5.00 | $5.00 |
| 0570 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 1,390 | $5.50 | $5.00 | $5.00 |
| 0580 | Milled-in rumble strip (6321000) | MI | 26.72 | $880.00 | $1,025.65 | $800.00 |
| 0590 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 130 | $24.20 | $17.95 | $17.95 |
| 0600 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 2,330 | $2.20 | $1.35 | $1.35 |
| 0610 | Sawcut for loop detector (6780495) | LF | 730 | $19.80 | $10.00 | $10.00 |
| 0620 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 4 | $1,320.00 | $650.00 | $650.00 |
| 0630 | Detectable warning material (7204900) | SF | 12.50 | $110.00 | $100.00 | $55.00 |
| 0640 | Pedestrian ramp construction (7209000) | SY | 25 | $385.00 | $250.00 | $172.50 |
| 0650 | Surface applied detectable warning (7209100) | SF | 120 | $82.50 | $100.00 | $44.00 |
| 0660 | MT3 leading end treatment TL3 (8051151) | EACH | 70 | $3,196.00 | $3,125.00 | $3,200.00 |
| 0670 | MGS3CS GR compressed shoulder (8052150) | LF | 10,037.50 | $31.20 | $31.47 | $26.00 |
| 0680 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 16.05 | $3,135.00 | $3,498.69 | $3,450.00 |