Satterfield Construction Company, Inc.: SCDOT bid record
Satterfield Construction Company, Inc. submitted 84 bids on South Carolina DOT contracts in the data, from 11 JAN 2022 to 13 OCT 2026, and was the low bidder on 77 of them (92%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $471,822,731
- Latest bid
- 13 OCT 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 14 | 12 | 86% |
| 2023 | 18 | 17 | 94% |
| 2024 | 23 | 22 | 96% |
| 2025 | 14 | 14 | 100% |
| 2026 | 15 | 12 | 80% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 55 | 54 | 98% |
| District 7 | 28 | 22 | 79% |
| District 4 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Borrow excavation | 2033000 | CY | 40 | 33 (83%) | $46.00 | $49.70 |
| Milling existing asphalt pavement (variable) | 4013990 | SY | 41 | 32 (78%) | $6.00 | $11.30 |
| Full depth asph. pav. patching 8" unif | 4012080 | SY | 33 | 30 (91%) | $68.00 | $84.00 |
| Full depth asph. pav. patching 6" unif. | 4012060 | SY | 28 | 26 (93%) | $51.00 | $70.00 |
| Permanent grassing for non-permitted resurfacing projects | 8100102 | ACRE | 39 | 24 (62%) | $3,213.00 | $3,360.00 |
| HMA shoulder widening course | 3104000 | TON | 30 | 23 (77%) | $83.50 | $81.45 |
| Removal & disposal of existing pavement | 2023000 | SY | 25 | 18 (72%) | $17.00 | $35.00 |
| Maintenance stone | 3069900 | TON | 23 | 18 (78%) | $35.00 | $72.00 |
| Hot mix asphalt surface course type C | 4030340 | TON | 19 | 17 (89%) | $68.15 | $86.00 |
| Liquid asphalt binder PG64-22 | 4011004 | TON | 42 | 14 (33%) | $719.00 | $715.00 |
| Hauling of excavated shoulder material | 2072000 | STA | 30 | 14 (47%) | $64.75 | $66.17 |
| Maintenance stone | 3059900 | TON | 18 | 14 (78%) | $52.00 | $92.63 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| King Asphalt, Inc. | 15 | 0 of 15 |
| Blythe Construction, Inc. | 13 | 2 of 13 |
| Rogers Group, Inc. | 12 | 1 of 12 |
| Palmetto Corp. of Conway | 10 | 1 of 10 |
| Reeves Construction Company | 9 | 0 of 9 |
| Eurovia Atlantic Coast LLC | 7 | 0 of 7 |
| Atc Site Construction, Inc. | 3 | 2 of 3 |
| Universal Civil Construction, LLC | 2 | 1 of 2 |
| Gearig Civilworks, LLC | 1 | 0 of 1 |
| Aos Specialty Contractors, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 OCT 2026 | 4175571 | District 2 | 2026 Saluda CTC Resurfacing | 1 of 3 | $1,188,571 | Low, 25% under the second |
| 09 SEP 2026 | 0277810 | District 7 | 2026 Aiken CTC Resurfacing | 1 of 2 | $2,469,711 | Low, 18% under the second |
| 09 SEP 2026 | 0277850 | District 7 | 2027 Aiken Pavement Improvement | 1 of 2 | $10,154,570 | Low, 8.0% under the second |
| 09 SEP 2026 | 5277450 | District 2 | 2027 Abbeville/McCormick Pavement Improvement | 1 of 1 | $10,937,181 | Low |
| 11 AUG 2026 | 3077260 | District 2 | 2026 Laurens CTC Resurfacing | 1 of 6 | $1,877,582 | Low, 4.0% under the second |
| 14 APR 2026 | 1976490 | District 2 | 2026 Edgefield CTC Resurfacing | 1 of 1 | $857,216 | Low |
| 14 APR 2026 | 3675740 | District 2 | 2026 Newberry CTC Resurfacing | 1 of 2 | $3,118,996 | Low, 6.0% under the second |
| 14 APR 2026 | 3872110 | District 7 | Orangeburg SC 389 @ SC 394 Int. Improvement | 3 of 6 | $2,389,908 | +17% |
| 10 MAR 2026 | 0276160 | District 7 | 2026 Aiken Rehab/PM | 1 of 2 | $8,182,423 | Low, 3.0% under the second |
| 10 MAR 2026 | 0676010 | District 7 | 2026 Barnwell Pavement Improvement | 3 of 3 | $6,659,518 | +6.0% |
| 10 MAR 2026 | 0676350 | District 7 | 2026 Barnwell CTC Resurfacing | 2 of 3 | $434,674 | +29% |
| 10 MAR 2026 | 5273760 | District 2 | 2026 District 2 Pavement Improvement | 1 of 3 | $12,347,534 | Low, 7.0% under the second |
| 13 JAN 2026 | 0275430 | District 7 | 2026 Aiken Pavement Improvement | 1 of 2 | $8,294,888 | Low, 21% under the second |
| 13 JAN 2026 | 5273750 | District 2 | 2026 District 2 Pavement Improvement | 1 of 1 | $13,868,631 | Low |
| 13 JAN 2026 | 5274300 | District 2 | 2026 District 2 Pavement Improvement | 1 of 1 | $11,763,573 | Low |
| 12 NOV 2025 | 0275090 | District 7 | 2026 Aiken CTC Resurfacing | 1 of 2 | $6,058,267 | Low, 5.0% under the second |
| 12 NOV 2025 | 3073770 | District 2 | 2026 Laurens Pavement Improvement | 1 of 5 | $11,593,670 | Low, 7.0% under the second |
| 14 OCT 2025 | 1972740 | District 2 | 2025 Edgefield CTC Resurfacing | 1 of 1 | $474,782 | Low |
| 14 OCT 2025 | 2474800 | District 2 | 2026 Greenwood CTC Resurfacing | 1 of 1 | $1,448,552 | Low |
| 09 SEP 2025 | 5273720 | District 2 | 2026 District 2 Pavement Improvement | 1 of 3 | $9,748,376 | Low, 19% under the second |
| 10 JUN 2025 | 3672960 | District 2 | Newberry County Resurface | 1 of 1 | $5,843,040 | Low |
| 13 MAY 2025 | 0671391 | District 7 | 2024 Barnwell CTC Resurafing | 1 of 3 | $517,065 | Low, 1.0% under the second |
| 11 MAR 2025 | 0271590 | District 7 | 2025 Aiken County Rehabilitation | 1 of 2 | $6,821,748 | Low, 30% under the second |
| 11 MAR 2025 | 5269890 | District 2 | 2025 Newberry & Saluda Rehabilitation | 1 of 1 | $11,497,721 | Low |
| 14 JAN 2025 | 3069970 | District 2 | 2025 FA Secondary Pavement Improvement Program | 1 of 5 | $10,415,214 | Low, 25% under the second |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.