SCDOT contract 3069970 bid tabulation

2025 FA Secondary Pavement Improvement Program. Let by South Carolina DOT on January 14, 2025, Laurens, District 2. 5 bids received; low bid $10,415,214 by Satterfield Construction Company, Inc..

Owner
South Carolina DOT
Letting
14 JAN 2025
Pay items
75
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Satterfield Construction Company, Inc.$10,415,214Low
2Palmetto Corp. of Conway$13,039,388+25%
3Rogers Group, Inc.$15,495,150+49%
4King Asphalt, Inc.$16,088,014+54%
5Reeves Construction Company$18,159,310+74%
SCDOT contract 3069970: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Satterfield Construction Company, Inc.2. Palmetto Corp. of Conway3. Rogers Group, Inc.4. King Asphalt, Inc.5. Reeves Construction Company
0010Mobilization (1031000)LS1$235,000$600,000$770,000$765,000$465,337
0020Bonds and insurance (1032010)LS1$65,000$255,000$440,000$175,000$125,000
0030Removal & disposal of existing pavement (2023000)SY25$13.45$89.00$100.00$52.65$102.00
0040Removal of exist. guardrail (2027801)LF3,275$1.10$1.00$1.25$1.05$1.35
0050Borrow excavation (2033000)CY8,039.80$36.50$54.50$119.35$115.00$92.00
0060Excavation for shoulder paving (2036000)STA1,336$42.00$22.50$167.40$65.00$129.00
0070Hauling of excavated shoulder material (2072000)STA1,336$55.00$79.40$163.50$85.00$148.00
0080Maintenance stone (3059900)TON569.75$34.00$95.00$140.00$90.00$116.00
0090HMA shoulder widening course (3104000)TON6,100.04$78.50$82.35$126.20$105.00$125.00
0100Liquid asphalt binder PG64-22 (4011004)TON2,110.81$708.00$625.00$665.00$720.00$700.00
0110Full depth asph. pav. patching 8" unif (4012080)SY19,425$53.45$84.30$80.80$105.00$111.00
0120Full depth asph. pav. patching 10"unif (4012100)SY22,650$69.30$93.10$104.90$125.00$128.00
0130Full depth asph. pav. patching 12"unif (4012120)SY4,500$92.50$126.25$128.95$155.00$151.00
0140Milling existing asphalt pavement 1.0" (4013110)SY25,715$2.01$2.20$3.05$2.60$2.75
0150Milling existing asphalt pavement 1.75" (4013117)SY129,585$2.45$2.55$3.70$2.70$3.60
0160Milling existing asphalt pavement 2.0" (4013120)SY51,475$2.70$2.80$3.95$3.10$4.50
0170Milling existing asphalt pavement 3.0" (4013130)SY29,760$4.25$4.10$4.35$2.25$6.30
0180Milling existing asphalt pavement (variable) (4013990)SY11,250$6.30$7.15$13.40$9.70$17.00
0185Asphalt intermediate course type B (4030320)TON1,219.68$78.00$93.35$104.50$110.00$138.00
0190Asphalt surface course type B (4040320)TON3,997.15$77.00$99.25$97.35$99.05$138.00
0200Asphalt surface course type C (4040340)TON22,909.81$76.00$99.50$95.40$99.85$140.00
0210Driveway paving-surface type B (4047210)TON7.88$246.00$615.00$465.00$485.00$1,150.00
0220Driveway paving-surface type C (4047220)TON1,211.88$180.00$240.00$255.00$290.00$248.00
0230Traffic control (6011000)LS1$420,000$625,000$990,000$1,255,000$1,625,000
0240Permanent construction signs (ground mounted) (6051120)SF4,634$6.50$5.35$6.60$6.35$8.25
02504" white broken lines -(gaps excluded)-fast dry paint (6240005)LF12,430$0.16$0.15$0.16$0.16$0.20
02606" white broken lines -(gaps excluded)-fast dry paint (6240007)LF744$0.16$0.15$0.16$0.16$0.20
02704" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF229,835$0.16$0.15$0.16$0.16$0.20
02806" white solid lines (PVT. edge lines)-fast dry paint (6240012)LF210,060$0.16$0.15$0.16$0.16$0.20
02908"white solid lines (crosswalk& channelization)fast dry paint (6240015)LF1,820$0.16$0.15$0.16$0.16$0.20
030024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF2,365$0.54$0.50$0.55$0.55$0.65
0310White single arrow (left, straight, right)-fast dry paint (6240030)EACH14$27.00$25.00$26.50$26.35$34.00
0320White word message "only"- fast dry paint (6240035)EACH4$27.00$25.00$27.00$26.35$34.00
03304" yellow broken lines(gaps exc) - fast dry paint (6240105)LF19,400$0.16$0.15$0.16$0.16$0.20
03406" yellow broken lines(gaps exc) - fast dry paint (6240107)LF14,550$0.16$0.15$0.16$0.16$0.20
03504"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF280,325$0.16$0.15$0.16$0.16$0.20
03606"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240111)LF202,830$0.16$0.15$0.16$0.16$0.20
03706" yellow solid line on curb/median - fast dry paint (6240112)LF80$1.62$1.50$1.60$1.60$2.00
038024" yellow diagonal lines - fast dry paint (6240115)LF1,125$0.54$0.50$0.55$0.55$0.65
03904" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF3,794$1.08$1.00$1.05$1.05$1.35
04006" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007)LF248$1.62$1.50$1.75$1.60$2.00
04104" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF71,825$0.52$0.48$0.50$0.50$0.65
04206" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012)LF70,020$1.05$0.95$1.00$1.00$1.25
04308" white solid lines thermoplastic - 125 mil. (6271015)LF490$3.25$3.00$3.15$3.15$4.00
044024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF740$13.50$12.50$13.00$13.15$17.00
0450White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030)EACH4$108.00$100.00$105.00$105.25$135.00
0460White word message "only" - thermoplastic - 125 mil. (6271035)EACH1$108.00$100.00$105.00$105.25$135.00
04704" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064)LF6,000$0.52$0.48$0.50$0.50$0.65
04806" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271066)LF4,850$1.62$1.50$1.55$1.60$2.00
04904" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF87,180$0.52$0.48$0.50$0.50$0.65
05006" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271076)LF67,610$1.05$0.95$1.00$1.00$1.25
051024" yellow solid lines - thermoplastic - 125 mil. (6271080)LF300$6.50$6.00$6.50$6.30$8.00
0520Evaluation of pavement marking retroreflectivity (6290001)LS1$11,350$6.50$11,000$11,065$14,000
0530Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH181$7.02$6.50$6.75$6.85$8.00
0540Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005)EACH276$7.02$6.50$6.75$6.85$8.00
0550Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH1,358$7.02$6.50$6.75$6.85$8.00
0560Milled-in rumble strip (6321000)MI28.54$880.20$815.00$860.00$525.00$680.00
0570Furnish & install 1.0" schedule 80 PVC conduit (6750275)LF155$15.40$24.75$26.30$26.05$33.00
0580Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413)LF3,418$1.65$0.56$0.60$0.60$0.75
0590Sawcut for loop detector (6780495)LF1,078$9.30$9.50$10.10$10.00$13.00
0600F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508)EACH4$460.00$364.00$390.00$385.00$495.00
0610Adjust manhole (7197120)EACH1$3,510.00$2,410.00$3,800.00$2,945.00$3,400.00
0620Detectable warning material (7204900)SF12.50$86.40$40.00$87.00$58.00$88.00
0630Pedestrian ramp construction (7209000)SY25$378.00$138.50$415.00$110.50$270.00
0640Surface applied detectable warning (7209100)SF20$108.00$40.00$86.85$58.00$109.00
0650Premash W-beam strong post system WSP3 (8051050)LF1,012.50$31.32$20.00$20.85$21.05$27.00
0660MT3 leading end treatment TL3 (8051151)EACH66$3,645.00$3,400.00$3,550.00$3,580.00$5,700.00
0670MGS3 GR standard shoulder (8052100)LF225$39.96$20.00$20.85$21.05$27.00
0680MGS3CS GR compressed shoulder (8052150)LF4,712.50$40.90$26.00$27.10$27.40$35.00
0690Premash W-beam compressed SHLDR 9' post (8053001)LF2,875$40.82$25.00$26.05$26.30$34.00
0700Premash type T TL3 leading 50' (8057100)EACH6$3,564.00$2,950.00$3,075.00$3,105.00$6,000.00
0710Permanent grassing for non-permitted resurfacing projects (8100102)ACRE13.09$2,585.00$2,750.00$3,525.00$5,200.00$4,000.00
0720Silt fence (8153000)LF1,300$3.05$2.75$3.25$3.70$5.50
0730Replace/repair silt fence (8153090)LF325$2.20$2.00$5.25$3.15$2.00
0740Removal of silt retained by silt fence (8154050)LF130$2.20$12.50$4.75$4.20$2.70
SCDOT contract 3069970: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy