Reeves Construction Company: SCDOT bid record
Reeves Construction Company submitted 201 bids on South Carolina DOT contracts in the data, from 08 FEB 2022 to 13 OCT 2026, and was the low bidder on 35 of them (17%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $374,481,548
- Latest bid
- 13 OCT 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 56 | 13 | 23% |
| 2023 | 37 | 6 | 16% |
| 2024 | 39 | 6 | 15% |
| 2025 | 41 | 8 | 20% |
| 2026 | 28 | 2 | 7% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 65 | 13 | 20% |
| District 4 | 50 | 13 | 26% |
| District 1 | 31 | 2 | 6% |
| District 2 | 27 | 4 | 15% |
| District 7 | 15 | 0 | 0% |
| District 2, District 3 | 4 | 2 | 50% |
| District 6 | 3 | 1 | 33% |
| District 1, District 7 | 2 | 0 | 0% |
| Statewide | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Permanent yellow pavement markers BI-dir.- 4"X4" | 6301100 | EACH | 162 | 41 (25%) | $8.00 | $6.50 |
| 4" white solid lines (PVT. edge lines) thermo.- 90 mil. | 6271010 | LF | 134 | 39 (29%) | $0.60 | $0.54 |
| 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. | 6271074 | LF | 115 | 35 (30%) | $0.60 | $0.55 |
| Liquid asphalt binder PG64-22 | 4011004 | TON | 186 | 33 (18%) | $749.91 | $715.00 |
| Unclassified excavation | 2031000 | CY | 102 | 32 (31%) | $44.50 | $42.80 |
| Milling existing asphalt pavement 2.0" | 4013200 | SY | 67 | 32 (48%) | $2.98 | $3.10 |
| Permanent construction signs (ground mounted) | 6021120 | SF | 114 | 27 (24%) | $6.50 | $6.25 |
| Furnish & instl no. 14 copper wire,1-conductor for loop wire | 6770413 | LF | 87 | 27 (31%) | $0.75 | $1.00 |
| Borrow excavation | 2033000 | CY | 151 | 26 (17%) | $65.00 | $49.70 |
| 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint | 6250110 | LF | 85 | 26 (31%) | $0.15 | $0.13 |
| 4" white solid lines (PVT. edge lines)-fast dry paint | 6250010 | LF | 84 | 26 (31%) | $0.15 | $0.13 |
| Selective watering | 8109050 | GAL | 40 | 25 (63%) | $0.03 | $0.07 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Palmetto Corp. of Conway | 96 | 66 of 96 |
| Rogers Group, Inc. | 79 | 44 of 79 |
| King Asphalt, Inc. | 70 | 38 of 70 |
| C.R. Jackson, Inc. | 37 | 30 of 37 |
| Dane Construction, LLC | 35 | 16 of 35 |
| United Infrastructure Group, Inc. | 24 | 19 of 24 |
| Lynches River Contracting, Inc. | 22 | 10 of 22 |
| Eagle Construction Company | 21 | 10 of 21 |
| Eurovia Atlantic Coast LLC | 20 | 13 of 20 |
| Blythe Construction, Inc. | 17 | 15 of 17 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 OCT 2026 | 0276070 | District 7 | I-20 5-23 MM Interstate Preservation | 2 of 2 | $31,412,375 | +5.0% |
| 13 OCT 2026 | 2378290 | District 3 | S-978 Tugaloo Road Bridge Replacement in Greenville | 1 of 8 | $1,298,681 | Low, 2.0% under the second |
| 13 OCT 2026 | 4175571 | District 2 | 2026 Saluda CTC Resurfacing | 2 of 3 | $1,480,940 | +25% |
| 13 OCT 2026 | 4276560 | District 3 | I-585 0-2 MM Interstate Preservation | 3 of 4 | $7,185,597 | +24% |
| 13 OCT 2026 | 4673600 | District 4 | Br Replacement S-46-832 over Branch of Catawba River | 3 of 8 | $2,329,469 | +12% |
| 13 OCT 2026 | 8876550 | District 2, District 3 | I-385 14-23 MM Interstate Preservation | 4 of 4 | $16,620,669 | +32% |
| 13 OCT 2026 | 8876840 | District 1, District 7 | I-20 23-37 WB and 37-49 EB Interstate Preservation | 3 of 3 | $28,326,767 | +37% |
| 09 SEP 2026 | 0477440 | District 2 | 2027 Anderson Pavement Improvement | 3 of 3 | $10,654,844 | +14% |
| 09 SEP 2026 | 0965790 | District 7 | Safety Improvement - US 21/ SC 172/ SC 6 (Calhoun Co) | 8 of 8 | $3,390,321 | +31% |
| 09 SEP 2026 | 2376930 | District 3 | 2027 Greenville County Pavements | 4 of 4 | $11,986,001 | +23% |
| 09 SEP 2026 | 3277620 | District 1 | 2027 Lexington County Pavement Improvement | 4 of 4 | $9,751,604 | +27% |
| 09 SEP 2026 | 4276800 | District 3 | 2027 Spartanburg County Pavements | 3 of 4 | $9,880,495 | +12% |
| 11 AUG 2026 | 3077260 | District 2 | 2026 Laurens CTC Resurfacing | 5 of 6 | $2,228,598 | +19% |
| 11 AUG 2026 | 4275670 | District 3 | Bridge Replacement - S-234 over Tributary to Enoree River | 3 of 10 | $2,532,975 | +14% |
| 11 AUG 2026 | 4277290 | District 3 | Resurfacing - CMRB and Rehab S-62 Spartanburg County | 3 of 4 | $4,421,479 | +6.0% |
| 09 JUN 2026 | 2976280 | District 4 | SC 9 NB over Catawba River In Lancaster County Emergency Bri | 5 of 8 | $8,691,947 | +63% |
| 12 MAY 2026 | 4277020 | District 3 | Spartanburg County Sales Tax Tier 2 Ph. 1 and 2 Resurfacings | 4 of 4 | $21,020,597 | +23% |
| 14 APR 2026 | 2372300 | District 3 | Intersection Improvement S-540 @ L-1969 | 1 of 8 | $1,439,000 | Low, 7.0% under the second |
| 10 MAR 2026 | 2473910 | District 2 | S-24-102 over Ninety Six Creek Bridge Replacement Asset 2547 | 8 of 8 | $7,773,105 | +28% |
| 10 MAR 2026 | 3974750 | District 3 | 2026 Pickens County Pavements | 3 of 3 | $12,564,783 | +23% |
| 10 MAR 2026 | 4076400 | District 1 | 2026 Richland Pavement Improvement | 4 of 4 | $8,812,398 | +17% |
| 10 MAR 2026 | 5474310 | District 4 | 2026 District 4 Pavement Improvement | 3 of 3 | $11,018,317 | +22% |
| 10 MAR 2026 | 5474320 | District 4 | 2026 District 4 Pavement Improvement | 4 of 4 | $9,029,727 | +17% |
| 10 MAR 2026 | 8872120 | District 2, District 3 | Intersection Improvement US 178 @ S-73/S-27 | 4 of 6 | $2,713,170 | +18% |
| 10 FEB 2026 | 3973100 | District 3 | SC 183 Road Departure Projects | 3 of 3 | $7,029,359 | +34% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.