SCDOT contract 4673600 bid tabulation
Br Replacement S-46-832 over Branch of Catawba River. Let by South Carolina DOT on October 13, 2026, York, District 4. 8 bids received; low bid $2,073,442 by Kemp Sigmon Construction Co., Inc..
- Owner
- South Carolina DOT
- Letting
- 13 OCT 2026
- Pay items
- 94
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kemp Sigmon Construction Co., Inc. | $2,073,442 | Low |
| 2 | Eagle Construction Company | $2,218,372 | +7.0% |
| 3 | Reeves Construction Company | $2,329,469 | +12% |
| 4 | Coogler Construction, Inc. | $2,442,345 | +18% |
| 5 | Blythe Development, LLC | $2,474,417 | +19% |
| 6 | Palmetto Infrastructure, Inc. | $2,509,737 | +21% |
| 7 | Dane Construction, LLC | $2,616,984 | +26% |
| 8 | Aos Specialty Contractors, Inc. | $2,995,464 | +44% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kemp Sigmon Construction Co., Inc. | 2. Eagle Construction Company | 3. Reeves Construction Company | 4. Coogler Construction, Inc. | 5. Blythe Development, LLC | 6. Palmetto Infrastructure, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $103,000 | $109,500 | $116,000 | $172,700 | $125,000 | $125,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $41,000 | $13,000 | $69,000 | $27,647 | $14,000 | $50,000 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $35,000 | $28,500 | $34,000 | $45,280 | $39,450 | $40,000 |
| 0040 | Utility staking (1052001) | LS | 1 | $2,500.00 | $2,500.00 | $1.00 | $10,000 | $3,000.00 | $1.00 |
| 0050 | CPM progress schedule (1080300) | LS | 1 | $15,000 | $1,250.00 | $250.00 | $20,000 | $8,000.00 | $7,500.00 |
| 0060 | Clearing & grubbing within roadway (2012000) | LS | 1 | $175,000 | $49,500 | $120,000 | $65,000 | $90,000 | $120,000 |
| 0070 | Selected clearing (2015010) | LS | 1 | $10,000 | $4,000.00 | $10,000 | $10,000 | $10,000 | $6,500.00 |
| 0080 | Removal & disposal item no. 001 (2022000) | LS | 1 | $1.00 | $11,000 | $8,500.00 | $500.00 | $3,400.00 | $6,500.00 |
| 0090 | Removal & disposal item no. 002 (2022000) | LS | 1 | $1.00 | $11,000 | $5,500.00 | $500.00 | $3,400.00 | $1,200.00 |
| 0100 | Removal & disposal item no. 003 (2022000) | LS | 1 | $1.00 | $400.00 | $7,900.00 | $2,000.00 | $3,400.00 | $2,200.00 |
| 0110 | Removal & disposal item no. 004 (2022000) | LS | 1 | $1.00 | $400.00 | $15,000 | $2,200.00 | $3,400.00 | $1,250.00 |
| 0120 | Removal & disposal of existing asphalt pavement (2025000) | SY | 432 | $10.00 | $10.00 | $38.00 | $15.00 | $10.00 | $22.00 |
| 0130 | Removal & disposal of existing bridge (2028100) | LS | 1 | $275,000 | $63,500 | $77,000 | $114,571 | $80,000 | $215,000 |
| 0140 | Unclassified excavation (2031000) | CY | 798 | $20.00 | $51.00 | $50.00 | $30.00 | $35.00 | $55.00 |
| 0150 | Borrow excavation (2033000) | CY | 1,319 | $20.00 | $58.00 | $42.00 | $40.00 | $60.00 | $65.00 |
| 0160 | Geotextile, separation (2036020) | SY | 137 | $5.00 | $9.00 | $8.50 | $9.00 | $7.00 | $12.00 |
| 0170 | Geogrid stabilization (2037030) | SY | 291 | $5.00 | $10.00 | $23.00 | $9.00 | $7.00 | $16.00 |
| 0180 | Granular bridge lift material (2052020) | CY | 100 | $95.00 | $93.25 | $135.00 | $40.00 | $95.00 | $70.00 |
| 0190 | Fine grading (2081001) | SY | 1,272 | $10.00 | $1.00 | $20.00 | $8.00 | $24.00 | $12.00 |
| 0200 | Maintenance stone (3059900) | TON | 20 | $60.00 | $54.25 | $70.00 | $100.00 | $63.00 | $85.00 |
| 0210 | Liquid asphalt binder PG64-22 (4011004) | TON | 45 | $848.00 | $900.00 | $848.00 | $840.00 | $1,000.00 | $848.00 |
| 0220 | Milling existing asphalt pavement (variable) (4013990) | SY | 354 | $40.00 | $45.00 | $40.00 | $18.00 | $35.00 | $40.00 |
| 0230 | Asphalt base course - type B (4020320) | TON | 316 | $120.00 | $130.00 | $120.00 | $135.00 | $144.00 | $120.00 |
| 0240 | Asphalt intermediate course type C (4030330) | TON | 239 | $130.00 | $140.00 | $130.00 | $135.00 | $140.00 | $130.00 |
| 0250 | Asphalt surface course type C (4040340) | TON | 263 | $125.00 | $135.00 | $125.00 | $135.00 | $120.00 | $125.00 |
| 0260 | Asphalt surface course type E (4040360) | TON | 26 | $195.00 | $240.00 | $195.00 | $135.00 | $235.00 | $125.00 |
| 0270 | Driveway paving-surface type C (4047220) | TON | 7 | $630.00 | $800.00 | $630.00 | $600.00 | $235.00 | $630.00 |
| 0280 | Traffic control (6011000) | LS | 1 | $40,000 | $40,000 | $6,700.00 | $20,000 | $3,500.00 | $8,800.00 |
| 0290 | Barricade - type III (6041200) | LF | 84 | $26.50 | $35.00 | $21.00 | $46.00 | $30.00 | $35.00 |
| 0300 | Permanent construction signs (ground mounted) (6051120) | SF | 128 | $13.50 | $10.00 | $7.40 | $40.00 | $9.00 | $7.00 |
| 0310 | Permanent construction signs (barricade mounted) (6051125) | SF | 70 | $12.00 | $10.00 | $7.40 | $35.00 | $10.00 | $7.00 |
| 0320 | Type A - flashing light (608100A) | EACH | 16 | $45.00 | $160.00 | $125.00 | $210.00 | $50.00 | $250.00 |
| 0330 | Pavement markings(temporary-paint)-4" white solid lines (609115A) | LF | 3,800 | $0.15 | $0.18 | $0.15 | $2.40 | $0.15 | $0.15 |
| 0340 | Pavement markings(temporary-paint)-4" yellow solid lines (609115B) | LF | 3,800 | $0.15 | $0.18 | $0.15 | $1.21 | $0.15 | $0.15 |
| 0350 | Pavement markings(temporary-paint)- 24"white solid lines (609135A) | LF | 30 | $2.00 | $2.25 | $2.00 | $14.30 | $2.00 | $2.00 |
| 0360 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 10 | $10.00 | $11.25 | $10.00 | $44.00 | $10.00 | $10.00 |
| 0370 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 1,600 | $1.50 | $1.70 | $1.50 | $5.50 | $1.50 | $1.50 |
| 0380 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 50 | $15.00 | $17.00 | $15.00 | $27.50 | $15.00 | $15.00 |
| 0390 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 1,800 | $1.50 | $1.70 | $1.50 | $5.50 | $1.50 | $1.50 |
| 0400 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 20 | $10.00 | $11.25 | $10.00 | $23.10 | $10.00 | $10.00 |
| 0410 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 29 | $28.00 | $35.00 | $26.70 | $40.00 | $30.00 | $25.00 |
| 0420 | Flat sheet, type III, size determined by MSG (6510106) | SF | 9 | $33.00 | $50.00 | $33.00 | $50.00 | $30.00 | $25.00 |
| 0430 | U-section post for sign supports - 2P (6531205) | LF | 40 | $8.00 | $21.00 | $14.00 | $11.00 | $11.00 | $15.00 |
| 0440 | U-section post for sign supports - 3P (6531210) | LF | 34 | $13.50 | $21.00 | $14.00 | $11.00 | $12.00 | $15.00 |
| 0450 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 564 | $15.00 | $35.00 | $22.33 | $20.57 | $23.30 | $22.00 |
| 0460 | Conc. for structures - class 4000 (7011400) | CY | 95 | $900.00 | $1,000.00 | $1,180.00 | $2,305.90 | $2,500.00 | $2,500.00 |
| 0470 | Conc. for structures - class 4000DS (7011510) | CY | 6 | $1,800.00 | $1,000.00 | $3,950.00 | $4,354.07 | $1,800.00 | $2,500.00 |
| 0480 | Reinf. steel for structures (bridge) (7031200) | LB | 35,096 | $1.50 | $3.50 | $1.75 | $2.35 | $3.00 | $1.75 |
| 0490 | 3'-0" X 3'-3" box beam (7046220) | LF | 1,087.70 | $350.00 | $480.00 | $480.00 | $370.00 | $500.00 | $425.00 |
| 0500 | 42" MASH concrete barrier parapet/railing wall (7051050) | LF | 280 | $135.00 | $185.00 | $145.00 | $150.00 | $200.00 | $145.00 |
| 0510 | Pile driving set-UP (7110010) | EACH | 6 | $1,500.00 | $5,500.00 | $4,000.00 | $17,681 | $1,600.00 | $4,500.00 |
| 0520 | Reinf. pile tips (HP14 X 73) (7111560) | EACH | 6 | $200.00 | $325.00 | $225.00 | $151.80 | $400.00 | $300.00 |
| 0530 | Steel H bearing index piling (HP 14 X 73) (7112222) | LF | 546 | $85.00 | $108.00 | $85.00 | $112.85 | $200.00 | $100.00 |
| 0540 | 15" smooth wall pipe (7143615) | LF | 20 | $125.00 | $82.00 | $260.00 | $125.00 | $120.00 | $225.00 |
| 0550 | 18" smooth wall pipe (7143618) | LF | 28 | $125.00 | $83.00 | $230.00 | $130.00 | $160.00 | $300.00 |
| 0560 | Drilled pile set-UP (7160008) | EACH | 6 | $5,000.00 | $8,000.00 | $23,500 | $3,489.00 | $100.00 | $3,500.00 |
| 0570 | Soil excavation for drilled pile foundations - 30" diameter (7160023) | LF | 234 | $350.00 | $425.00 | $120.00 | $689.00 | $600.00 | $500.00 |
| 0580 | Rock excavation for drilled pile foundations - 30" diameter (7160063) | LF | 30 | $750.00 | $850.00 | $525.00 | $962.00 | $1,850.00 | $1,800.00 |
| 0590 | Construction casing - 30" diameter (7160405) | LF | 234 | $350.00 | $425.00 | $450.00 | $254.00 | $200.00 | $300.00 |
| 0600 | 4' slope flume (6" curb style with cutoffs) (7199200) | LF | 54 | $168.00 | $325.00 | $300.00 | $320.00 | $230.00 | $350.00 |
| 0610 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 99 | $15.00 | $80.00 | $75.00 | $50.00 | $85.00 | $100.00 |
| 0620 | Elastomeric bearing (7243100) | EACH | 22 | $200.00 | $575.00 | $450.00 | $825.59 | $500.00 | $300.00 |
| 0630 | Waterproofing (7282000) | SY | 363.20 | $50.00 | $75.00 | $150.00 | $94.86 | $220.00 | $65.00 |
| 0640 | Aggregate underdrain(agg#789)with 4"perf.pipe for struc (8011210) | TON | 86 | $100.00 | $85.00 | $120.00 | $110.00 | $150.00 | $200.00 |
| 0650 | Rip-rap (class B) (8041020) | TON | 1,279 | $70.00 | $80.00 | $80.00 | $95.00 | $80.00 | $80.00 |
| 0660 | Geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 2,083 | $2.50 | $4.00 | $4.00 | $9.00 | $6.00 | $10.00 |
| 0670 | MT3 leading end treatment TL3 (8051151) | EACH | 3 | $3,200.00 | $4,300.00 | $3,200.00 | $4,017.52 | $4,350.00 | $3,700.00 |
| 0680 | MGS3 GR standard shoulder (8052100) | LF | 100 | $28.00 | $39.00 | $28.00 | $35.27 | $29.00 | $24.00 |
| 0690 | MTBBC3 MASH thrie-beam barrier connector TL3 (8053253) | EACH | 3 | $2,800.00 | $5,000.00 | $2,800.00 | $4,750.48 | $3,900.00 | $3,300.00 |
| 0700 | Flume inlet at guardrail (handwork) (8053257) | EACH | 3 | $4,900.00 | $5,000.00 | $4,200.00 | $2,300.00 | $2,800.00 | $3,000.00 |
| 0710 | Non-mow strip under guardrail (8055250) | SY | 111 | $93.00 | $100.00 | $140.00 | $80.00 | $82.00 | $170.00 |
| 0720 | 2' crash cushion 3A (8057350) | EACH | 1 | $26,100 | $47,000 | $26,100 | $34,682 | $42,000 | $40,500 |
| 0730 | Temporary barrier fence (orange) (8068301) | LF | 406 | $3.00 | $3.00 | $3.50 | $5.25 | $3.00 | $3.46 |
| 0740 | Right of way marker(rebar and cap) (8091010) | EACH | 11 | $300.00 | $310.00 | $200.00 | $150.00 | $480.00 | $250.00 |
| 0750 | Right of way plat (8091050) | LS | 1 | $1,500.00 | $2,000.00 | $5,000.00 | $5,500.00 | $1,760.00 | $4,500.00 |
| 0760 | Permanent cover (8100100) | ACRE | 0.66 | $1,825.00 | $1,700.00 | $1,994.00 | $6,000.00 | $1,825.00 | $1,416.86 |
| 0770 | Temporary cover (8100200) | ACRE | 0.33 | $3,200.00 | $1,100.00 | $1,596.00 | $10,000 | $3,200.00 | $933.00 |
| 0780 | Fertilizer (nitrogen) (8104005) | LB | 66.20 | $3.25 | $1.75 | $5.00 | $24.00 | $3.25 | $1.34 |
| 0790 | Fertilizer (phosphoric acid) (8104010) | LB | 66.20 | $3.25 | $1.75 | $5.00 | $24.00 | $3.25 | $1.34 |
| 0800 | Fertilizer (potash) (8104015) | LB | 66.20 | $3.25 | $1.75 | $5.00 | $24.00 | $3.25 | $1.34 |
| 0810 | Agricultural granular lime (8105005) | LB | 1,324 | $0.35 | $1.10 | $0.50 | $2.00 | $0.35 | $0.95 |
| 0820 | Selective watering (8109050) | GAL | 54,300 | $0.07 | $0.15 | $0.20 | $0.25 | $0.07 | $0.13 |
| 0830 | Mowing (8109901) | ACRE | 1.99 | $550.00 | $525.00 | $400.00 | $1,500.00 | $550.00 | $452.31 |
| 0840 | Turf reinforcement matting (TRM) type 1 (8151101) | MSY | 0.82 | $3,510.00 | $3,800.00 | $4,480.00 | $3,865.00 | $3,510.00 | $3,272.92 |
| 0850 | Temporary erosion control blanket (ecb) (8151110) | MSY | 0.36 | $1,900.00 | $2,100.00 | $1,978.00 | $2,000.00 | $1,900.00 | $1,818.99 |
| 0860 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 1.86 | $2,750.00 | $3,500.00 | $3,992.00 | $3,500.00 | $2,750.00 | $2,997.64 |
| 0870 | Sediment tubes for ditch checks (8152007) | LF | 200 | $11.00 | $15.00 | $14.00 | $25.00 | $13.00 | $11.27 |
| 0880 | Silt fence (8153000) | LF | 1,816 | $2.90 | $3.50 | $3.50 | $4.75 | $2.80 | $3.72 |
| 0890 | Replace/repair silt fence (8153090) | LF | 182 | $3.90 | $6.00 | $3.50 | $4.75 | $3.90 | $3.78 |
| 0900 | Floating turbidity barrier- heavy duty(5'depth) (8153305) | LF | 400 | $33.50 | $30.00 | $58.00 | $25.00 | $40.00 | $24.83 |
| 0910 | Cleaning silt basins (8154010) | CY | 89 | $25.00 | $30.00 | $60.00 | $100.00 | $100.00 | $45.00 |
| 0920 | Removal of silt retained by silt fence (8154050) | LF | 454 | $4.00 | $5.00 | $9.00 | $4.75 | $1.00 | $18.00 |
| 0930 | Aggregate no.5 or 57 for erosion control (8156410) | TON | 28 | $125.00 | $64.00 | $100.00 | $100.00 | $70.00 | $75.00 |
| 0940 | Stabilized construction entrance (8156490) | SY | 550 | $20.00 | $26.50 | $19.00 | $20.00 | $30.00 | $65.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of October 13, 2026. Compiled by Mirage Metrics.