Coogler Construction, Inc. submitted 20 bids on South Carolina DOT contracts in the data, from 09 DEC 2025 to 13 OCT 2026, and was the low bidder on 5 of them (25%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $20,495,628
- Latest bid
- 13 OCT 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 5 | 3 | 60% |
| 2026 | 15 | 2 | 13% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 8 | 2 | 25% |
| District 7 | 6 | 1 | 17% |
| District 1 | 3 | 2 | 67% |
| District 2 | 2 | 0 | 0% |
| District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Concrete curb and gutter(2'-0") vertical face | 7203210 | LF | 13 | 10 (77%) | $40.00 | $48.00 |
| Right of way marker(rebar and cap) | 8091010 | EACH | 18 | 7 (39%) | $150.00 | $175.00 |
| Liquid asphalt binder PG64-22 | 4011004 | TON | 20 | 6 (30%) | $840.00 | $715.00 |
| Construction stakes, lines & grades | 1050800 | EACH | 19 | 6 (32%) | $35,000 | $30,000 |
| Stabilized construction entrance | 8156490 | SY | 19 | 5 (26%) | $20.00 | $23.00 |
| Milling existing asphalt pavement (variable) | 4013990 | SY | 15 | 5 (33%) | $20.00 | $11.30 |
| 4' slope flume (6" curb style with cutoffs) | 7199200 | LF | 10 | 5 (50%) | $222.50 | $250.00 |
| Flume inlet at guardrail (handwork) | 8053257 | EACH | 9 | 5 (56%) | $2,300.00 | $4,200.00 |
| Borrow excavation | 2033000 | CY | 19 | 4 (21%) | $29.00 | $49.70 |
| Asphalt base course - type B | 4020320 | TON | 15 | 4 (27%) | $135.00 | $150.00 |
| Removal & disposal of existing asphalt pavement | 2025000 | SY | 14 | 4 (29%) | $15.00 | $17.00 |
| Asphalt surface course type C | 4040340 | TON | 11 | 4 (36%) | $130.00 | $106.30 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Aos Specialty Contractors, Inc. | 15 | 4 of 15 |
| Dane Construction, LLC | 13 | 7 of 13 |
| Eagle Construction Company | 10 | 3 of 10 |
| United Infrastructure Group, Inc. | 6 | 5 of 6 |
| Blythe Development, LLC | 6 | 2 of 6 |
| Reeves Construction Company | 6 | 2 of 6 |
| Palmetto Infrastructure, Inc. | 6 | 5 of 6 |
| Lowcountry Sitework, LLC | 4 | 2 of 4 |
| Site-Prep, Inc. of NC | 4 | 2 of 4 |
| Palmetto Sitework Services, LLC | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 OCT 2026 | 2378290 | District 3 | S-978 Tugaloo Road Bridge Replacement in Greenville | 6 of 8 | $1,761,259 | +36% |
| 13 OCT 2026 | 2973031 | District 4 | Intersection Improvement - SC 5 at S-358 (Steel Hill Road) | 8 of 9 | $2,677,260 | +80% |
| 13 OCT 2026 | 4673600 | District 4 | Br Replacement S-46-832 over Branch of Catawba River | 4 of 8 | $2,442,345 | +18% |
| 09 SEP 2026 | 0965790 | District 7 | Safety Improvement - US 21/ SC 172/ SC 6 (Calhoun Co) | 2 of 8 | $2,651,398 | +3.0% |
| 09 SEP 2026 | 2069920 | District 4 | Three Bridge Replacements in Fairfield County | 7 of 9 | $9,433,247 | +26% |
| 09 SEP 2026 | 4672780 | District 4 | New Gray Rock Road Multipurpose Trail | 2 of 3 | $4,662,429 | +30% |
| 11 AUG 2026 | 2970980 | District 4 | S-55 (Van Wyck Rd) bridge Replacement over Twelve Mile Creek | 3 of 7 | $9,519,005 | +10% |
| 11 AUG 2026 | 3077260 | District 2 | 2026 Laurens CTC Resurfacing | 4 of 6 | $2,063,185 | +10% |
| 11 AUG 2026 | 3276951 | District 1 | Replace the existing culvert along S-59 (Devils Backbone Rd | 3 of 11 | $1,499,115 | +16% |
| 11 AUG 2026 | 3873080 | District 7 | Replacement of a 60 foot bridge on S-92 | 4 of 7 | $3,469,819 | +27% |
| 12 MAY 2026 | 0274010 | District 7 | Emergency Culvert Replacement – Altees Corbett Rd. (S-2-111) in Aiken County | 7 of 9 | $1,137,268 | +45% |
| 12 MAY 2026 | 2575620 | District 7 | Bridge Replacement - Rock Spring Road (S-25-51) over Mill Creek | 8 of 8 | $2,387,386 | +21% |
| 10 MAR 2026 | 2473910 | District 2 | S-24-102 over Ninety Six Creek Bridge Replacement Asset 2547 | 5 of 8 | $7,155,008 | +18% |
| 13 JAN 2026 | 2971000 | District 4 | S-294(Uriah Rd) Bridge Replacement over Camp Branch Rd | 1 of 6 | $1,556,668 | Low, 28% under the second |
| 13 JAN 2026 | 4070850 | District 1 | S-40-64 Arcadia Lakes Drive over Coopers Pond | 1 of 7 | $2,603,441 | Low, 2.0% under the second |
| 09 DEC 2025 | 0962450 | District 7 | SC 172 (Bull Swamp Rd) Bridge Replacement over Caw Caw Swamp | 6 of 6 | $2,829,917 | +5.0% |
| 09 DEC 2025 | 2974910 | District 4 | SC 9 Bridge Replacement Over Wildcat Creek | 1 of 4 | $11,765,912 | Low, 12% under the second |
| 09 DEC 2025 | 3265530 | District 1 | Roundabout at SC 6 and S-65 | 1 of 8 | $2,660,049 | Low, 2.0% under the second |
| 09 DEC 2025 | 3866050 | District 7 | Bridge Replacement of Closed FA/Non-NHS Secondary Bridge | 1 of 8 | $1,909,557 | Low, 9.0% under the second |
| 09 DEC 2025 | 4466010 | District 4 | S-16 (Sardis Rd.) over Tyger River Bridge Replacement | 3 of 9 | $9,973,326 | +19% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.