Lowcountry Sitework, LLC: SCDOT bid record
Lowcountry Sitework, LLC submitted 11 bids on South Carolina DOT contracts in the data, from 12 AUG 2025 to 13 OCT 2026, and was the low bidder on 1 of them (9%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $2,685,000
- Latest bid
- 13 OCT 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 7 | 1 | 14% |
| 2026 | 4 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 6 | 1 | 17% |
| District 4 | 2 | 0 | 0% |
| District 6 | 2 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Geotextile for erosion control under riprap(class 2)type C | 8048210 | SY | 9 | 7 (78%) | $3.00 | $6.00 |
| Borrow excavation | 2033000 | CY | 11 | 5 (45%) | $32.50 | $49.70 |
| Geotextile for erosion control under riprap(class 2)type B | 8048205 | SY | 6 | 5 (83%) | $2.75 | $7.75 |
| Liquid asphalt binder PG64-22 | 4011004 | TON | 11 | 4 (36%) | $660.00 | $715.00 |
| 4" white solid lines (PVT. edge lines) thermo.- 90 mil. | 6271010 | LF | 10 | 4 (40%) | $1.10 | $0.54 |
| Reinf. steel for structures (bridge) | 7031200 | LB | 10 | 4 (40%) | $1.42 | $2.00 |
| Flowable fill | 2103000 | CY | 9 | 4 (44%) | $250.00 | $392.00 |
| Flume inlet at guardrail (handwork) | 8053257 | EACH | 8 | 4 (50%) | $3,125.00 | $4,200.00 |
| Unclassified excavation | 2031000 | CY | 11 | 3 (27%) | $45.00 | $42.80 |
| 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. | 6271074 | LF | 10 | 3 (30%) | $1.10 | $0.55 |
| Furnish & install 2.0" schedule 80 PVC conduit | 6750278 | LF | 10 | 3 (30%) | $15.75 | $17.00 |
| Hydraulic erosion control product (hecp) - type 3 | 8151203 | ACRE | 9 | 3 (33%) | $3,000.00 | $3,600.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, LLC | 10 | 5 of 10 |
| Aos Specialty Contractors, Inc. | 6 | 2 of 6 |
| Reeves Construction Company | 4 | 1 of 4 |
| Dellinger, Inc. | 4 | 2 of 4 |
| Republic Contracting Corporation | 4 | 2 of 4 |
| United Infrastructure Group, Inc. | 4 | 1 of 4 |
| Coogler Construction, Inc. | 4 | 2 of 4 |
| Eagle Construction Company | 2 | 2 of 2 |
| Mastec Civil, LLC | 2 | 0 of 2 |
| Rakes Building and Maintenance | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 OCT 2026 | 1075380 | District 6 | US 17 at Buck Hall Landing Road (Right Turn Lane) | 4 of 7 | $558,000 | +53% |
| 11 AUG 2026 | 1871410 | District 6 | Replacement of a 375 foot bridge on Horseford Road (S-56) ov | 2 of 4 | $8,175,000 | +29% |
| 11 AUG 2026 | 3873080 | District 7 | Replacement of a 60 foot bridge on S-92 | 6 of 7 | $3,858,000 | +41% |
| 12 MAY 2026 | 2575620 | District 7 | Bridge Replacement - Rock Spring Road (S-25-51) over Mill Creek | 7 of 8 | $2,375,000 | +21% |
| 09 DEC 2025 | 0962450 | District 7 | SC 172 (Bull Swamp Rd) Bridge Replacement over Caw Caw Swamp | 1 of 6 | $2,685,000 | Low, 3.0% under the second |
| 09 DEC 2025 | 3866050 | District 7 | Bridge Replacement of Closed FA/Non-NHS Secondary Bridge | 3 of 8 | $2,098,000 | +10% |
| 12 NOV 2025 | 2074200 | District 4 | SC 200 Bridge Replacement over Minton Creek - Asset ID 278 | 4 of 10 | $6,677,211 | +15% |
| 14 OCT 2025 | 0251970 | District 7 | S-22 over South Edisto River #1 | 3 of 4 | $5,588,000 | +10% |
| 09 SEP 2025 | 2970300 | District 4 | S-47 bridge replacement over Baskins Crk | 5 of 5 | $2,454,000 | +23% |
| 09 SEP 2025 | 3865910 | District 7 | SC 332 Bridge Replacement over Willow Swamp | 4 of 6 | $3,252,000 | +36% |
| 12 AUG 2025 | 3462420 | District 5 | US 76 Bridge Replacement over Catfish Branch | 2 of 3 | $8,858,000 | +17% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.