SCDOT contract 0251970 bid tabulation
S-22 over South Edisto River #1. Let by South Carolina DOT on October 14, 2025, Aiken, District 7. 4 bids received; low bid $5,066,812 by Eagle Construction Company.
- Owner
- South Carolina DOT
- Letting
- 14 OCT 2025
- Pay items
- 86
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Eagle Construction Company | $5,066,812 | Low |
| 2 | Dane Construction, LLC | $5,388,535 | +6.0% |
| 3 | Lowcountry Sitework, LLC | $5,588,000 | +10% |
| 4 | Reeves Construction Company | $6,227,914 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eagle Construction Company | 2. Dane Construction, LLC | 3. Lowcountry Sitework, LLC | 4. Reeves Construction Company |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $24,000 | $269,000 | $491,251 | $310,000 |
| 0020 | Mobilization - subcontractor (1031100) | LS | 1 | $230,000 | $269,000 | $50,000 | $310,000 |
| 0030 | Bridge construction access (1031200) | LS | 1 | $200,000 | $200,000 | $20,000 | $440,000 |
| 0040 | Bonds and insurance (1032010) | LS | 1 | $25,500 | $161,000 | $275,000 | $185,000 |
| 0050 | Construction stakes, lines & grades (1050800) | EACH | 1 | $51,000 | $42,500 | $80,000 | $35,000 |
| 0060 | CPM progress schedule (1080300) | LS | 1 | $6,000.00 | $24,000 | $15,000 | $2,500.00 |
| 0070 | Clearing & grubbing within roadway (2012000) | LS | 1 | $88,500 | $372,805 | $70,000 | $172,000 |
| 0075 | Selected clearing (no grubbing) (2016005) | ACRE | 1.70 | $41,000 | $5,000.00 | $25,000 | $15,000 |
| 0080 | Removal of structures & obstructions (2021000) | LS | 1 | $6,000.00 | $5,000.00 | $35,000 | $35,000 |
| 0090 | Removal & disposal of existing asphalt pavement (2025000) | SY | 1,880 | $10.00 | $25.00 | $12.00 | $11.85 |
| 0100 | Removal of exist. guardrail (2027801) | LF | 444 | $3.00 | $1.00 | $6.00 | $2.00 |
| 0110 | Removal & disposal of existing bridge (2028100) | LS | 1 | $250,000 | $300,000 | $330,000 | $225,000 |
| 0120 | Unclassified excavation (2031000) | CY | 362 | $75.00 | $30.00 | $275.00 | $27.45 |
| 0130 | Borrow excavation (2033000) | CY | 10,631 | $55.75 | $42.00 | $55.00 | $51.00 |
| 0140 | Muck excavation (2034000) | CY | 500 | $40.00 | $75.00 | $55.00 | $79.00 |
| 0150 | Geotextile, separation (2036020) | SY | 750 | $8.00 | $9.25 | $6.00 | $7.40 |
| 0160 | Geogrid stabilization (2037030) | SY | 750 | $12.00 | $10.50 | $6.00 | $16.50 |
| 0170 | Dry excavation for bridges (2042000) | CY | 339 | $40.00 | $50.00 | $55.00 | $130.00 |
| 0180 | Stone bridge lift material (2052010) | TON | 500 | $72.50 | $85.00 | $150.00 | $68.30 |
| 0190 | Granular bridge lift material (2052020) | CY | 500 | $90.75 | $95.00 | $110.00 | $60.00 |
| 0200 | Fine grading (2081001) | SY | 3,830 | $2.00 | $21.00 | $15.00 | $5.50 |
| 0210 | Maintenance stone (3059900) | TON | 20 | $65.00 | $95.00 | $100.00 | $175.00 |
| 0220 | Liquid asphalt binder PG64-22 (4011004) | TON | 83 | $825.00 | $715.00 | $630.00 | $690.00 |
| 0230 | Milling existing asphalt pavement (variable) (4013990) | SY | 260 | $60.00 | $50.00 | $20.00 | $8.65 |
| 0240 | Asphalt base course - type B (4020320) | TON | 862 | $152.00 | $140.00 | $100.00 | $128.00 |
| 0250 | Asphalt intermediate course type C (4030330) | TON | 389 | $145.00 | $130.00 | $105.00 | $157.00 |
| 0260 | Asphalt surface course type D (4040350) | TON | 375 | $148.00 | $132.00 | $135.00 | $170.00 |
| 0270 | Driveway paving-surface type D (4047230) | TON | 10 | $400.00 | $250.00 | $300.00 | $730.00 |
| 0280 | Traffic control (6011000) | LS | 1 | $42,000 | $10,000 | $30,000 | $30,000 |
| 0290 | Barricade - type III (6041200) | LF | 84 | $60.00 | $25.00 | $65.00 | $25.00 |
| 0300 | Permanent construction signs (ground mounted) (6051120) | SF | 128 | $12.00 | $7.15 | $35.00 | $7.15 |
| 0310 | Permanent construction signs (barricade mounted) (6051125) | SF | 70 | $16.00 | $8.95 | $35.00 | $8.95 |
| 0320 | Type B - flashing light (608100B) | EACH | 16 | $185.00 | $190.00 | $65.00 | $225.00 |
| 0330 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 3,460 | $1.25 | $1.00 | $4.00 | $1.00 |
| 0340 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 3,460 | $1.25 | $1.00 | $4.00 | $1.00 |
| 0350 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 22 | $9.50 | $7.50 | $65.00 | $7.50 |
| 0360 | Milled-in rumble strip (6321000) | MI | 0.65 | $12,000 | $3,500.00 | $1,250.00 | $3,500.00 |
| 0365 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 24 | $75.00 | $26.00 | $35.00 | $26.00 |
| 0370 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 1,448 | $35.00 | $20.00 | $12.50 | $20.00 |
| 0380 | Conc. for structures - class 4000 (7011400) | CY | 225.40 | $1,100.00 | $1,756.47 | $1,750.00 | $2,200.00 |
| 0390 | Reinf. steel for structures (bridge) (7031200) | LB | 67,655 | $2.25 | $3.00 | $1.25 | $1.85 |
| 0400 | 3'-0" X 2'-0" cored slabs (7046020) | LF | 698.80 | $330.00 | $325.00 | $250.00 | $410.00 |
| 0410 | 3'-0" X 2'-0" slabs (7046120) | LF | 2,305.90 | $330.00 | $325.00 | $290.00 | $410.00 |
| 0420 | 42" MASH concrete barrier parapet/railing wall (7051050) | LF | 719.80 | $155.00 | $115.00 | $250.00 | $115.00 |
| 0430 | Dynamic pile analyzer test set-UP dynamic pile analyzer test setup (7110001) | EACH | 6 | $4,500.00 | $400.00 | $2,000.00 | $2,500.00 |
| 0440 | Pile driving set-UP (7110010) | EACH | 30 | $5,500.00 | $5,500.00 | $20,000 | $10,500 |
| 0450 | Prest. conc. piling (24"SQ.) (7110240) | LF | 288 | $410.00 | $250.00 | $300.00 | $275.00 |
| 0460 | Pile build-UP preparation (24"SQ) (7110241) | EACH | 10 | $630.00 | $1,000.00 | $3,000.00 | $2,000.00 |
| 0470 | Predrilling for prest. conc. piling (24"SQ.) (7110244) | LF | 250 | $630.00 | $650.00 | $75.00 | $500.00 |
| 0480 | Prestressed index piling (24" square) (7110245) | LF | 72 | $410.00 | $400.00 | $300.00 | $400.00 |
| 0490 | Prestressed pile point (HP12X74) (7111130) | LF | 545 | $210.00 | $25.00 | $60.00 | $85.00 |
| 0510 | Steel H bearing piling (HP14 X 73) (7112220) | LF | 1,418 | $90.00 | $60.00 | $85.00 | $110.00 |
| 0520 | Steel H bearing index piling (HP 14 X 73) (7112222) | LF | 152 | $90.00 | $60.00 | $125.00 | $120.00 |
| 0530 | 4' slope flume (6" curb style with cutoffs) (7199200) | LF | 63 | $340.00 | $350.00 | $125.00 | $325.00 |
| 0540 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 299 | $70.00 | $95.00 | $45.00 | $75.00 |
| 0550 | Elastomeric bearing (7243100) | EACH | 86 | $380.00 | $249.19 | $150.00 | $235.00 |
| 0560 | Waterproofing (bridge deck) (7293000) | SY | 936.50 | $55.00 | $34.00 | $65.00 | $100.00 |
| 0565 | 12" temporary pipe slope drain (8034120) | LF | 280 | $60.00 | $50.00 | $30.00 | $22.00 |
| 0570 | Rip-rap (class B) (8041020) | TON | 574 | $96.75 | $75.00 | $110.00 | $130.00 |
| 0580 | Geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 732 | $4.00 | $6.75 | $5.00 | $7.50 |
| 0590 | MT3 leading end treatment TL3 (8051151) | EACH | 4 | $4,100.00 | $3,485.00 | $4,500.00 | $3,400.00 |
| 0595 | MGS3 GR standard shoulder (8052100) | LF | 1,050 | $28.50 | $24.00 | $30.00 | $24.00 |
| 0600 | MTBBC3 MASH thrie-beam barrier connector TL3 (8053253) | EACH | 8 | $2,700.00 | $2,300.00 | $3,000.00 | $2,850.00 |
| 0610 | Flume inlet at guardrail (handwork) (8053257) | EACH | 4 | $7,150.00 | $300.00 | $2,000.00 | $6,000.00 |
| 0620 | Non-mow strip under guardrail (8055250) | SY | 788 | $195.00 | $92.00 | $100.00 | $110.00 |
| 0630 | Temporary barrier fence (orange) (8068301) | LF | 1,600 | $3.50 | $4.00 | $6.00 | $4.00 |
| 0640 | Moving item no. 001 (8081000) | LS | 1 | $24,000 | $8,500.00 | $5,000.00 | $9,000.00 |
| 0650 | Moving item no. 002 (8081000) | LS | 1 | $1,000.00 | $4,000.00 | $5,000.00 | $5,000.00 |
| 0660 | Right of way marker(rebar and cap) (8091010) | EACH | 24 | $190.00 | $300.00 | $250.00 | $175.00 |
| 0670 | Right of way plat (8091050) | LS | 1 | $4,500.00 | $3,200.00 | $10,000 | $7,500.00 |
| 0680 | Permanent cover (8100100) | ACRE | 1.50 | $1,700.00 | $1,500.00 | $3,500.00 | $1,700.00 |
| 0690 | Temporary cover (8100200) | ACRE | 0.75 | $1,400.00 | $1,450.00 | $3,500.00 | $2,500.00 |
| 0700 | Compost (8101105) | CY | 40 | $60.00 | $90.00 | $100.00 | $80.00 |
| 0710 | Fertilizer (nitrogen) (8104005) | LB | 150 | $4.00 | $8.00 | $5.00 | $2.00 |
| 0720 | Fertilizer (phosphoric acid) (8104010) | LB | 150 | $4.00 | $8.00 | $5.00 | $2.00 |
| 0730 | Fertilizer (potash) (8104015) | LB | 150 | $4.00 | $8.00 | $5.00 | $2.00 |
| 0740 | Agricultural granular lime (8105005) | LB | 3,000 | $0.75 | $0.45 | $1.00 | $0.60 |
| 0750 | Selective watering (8109050) | GAL | 54,300 | $0.05 | $0.09 | $0.10 | $0.03 |
| 0760 | Mowing (8109901) | ACRE | 4.50 | $950.00 | $460.00 | $500.00 | $85.00 |
| 0770 | Temporary erosion control blanket (ecb) (8151110) | MSY | 4.90 | $2,000.00 | $1,998.37 | $2,500.00 | $2,903.55 |
| 0780 | Hydraulic erosion control product (hecp) - type 1 (8151201) | ACRE | 1.36 | $1,600.00 | $1,631.00 | $3,500.00 | $3,512.92 |
| 0790 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 1.36 | $3,500.00 | $3,188.19 | $3,500.00 | $4,516.61 |
| 0791 | Silt fence (8153000) | LF | 4,700 | $5.00 | $4.00 | $5.00 | $9.00 |
| 0792 | Replace/repair silt fence (8153090) | LF | 470 | $9.00 | $4.00 | $5.00 | $6.00 |
| 0793 | Floating turbidity barrier- light duty(6'depth) (8153106) | LF | 900 | $70.00 | $35.00 | $10.00 | $76.00 |
| 0794 | Removal of silt retained by silt fence (8154050) | LF | 940 | $6.00 | $20.00 | $4.00 | $7.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.