SCDOT contract 3865910 bid tabulation
SC 332 Bridge Replacement over Willow Swamp. Let by South Carolina DOT on September 9, 2025, Orangeburg, District 7. 6 bids received; low bid $2,386,575 by Dellinger, Inc..
- Owner
- South Carolina DOT
- Letting
- 09 SEP 2025
- Pay items
- 77
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dellinger, Inc. | $2,386,575 | Low |
| 2 | Dane Construction, LLC | $2,684,053 | +12% |
| 3 | Republic Contracting Corporation | $2,694,483 | +13% |
| 4 | Lowcountry Sitework, LLC | $3,252,000 | +36% |
| 5 | Aos Specialty Contractors, Inc. | $3,408,500 | +43% |
| 6 | Reeves Construction Company | $3,487,859 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dellinger, Inc. | 2. Dane Construction, LLC | 3. Republic Contracting Corporation | 4. Lowcountry Sitework, LLC | 5. Aos Specialty Contractors, Inc. | 6. Reeves Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $119,300 | $134,200 | $250,000 | $175,000 | $453,889 | $175,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $20,000 | $53,680 | $30,000 | $98,373 | $32,789 | $104,000 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $40,000 | $29,500 | $45,000 | $30,000 | $40,729 | $45,000 |
| 0040 | Small public sewer relocation no. ____ 01 (1052200) | EACH | 1 | $272,530 | $272,530 | $400,450 | $577,000 | $405,811 | $320,000 |
| 0050 | CPM progress schedule (1080300) | LS | 1 | $11,000 | $21,000 | $15,000 | $15,000 | $27,446 | $2,500.00 |
| 0060 | Clearing & grubbing within right of way (2011000) | LS | 1 | $100,000 | $145,000 | $130,000 | $65,000 | $72,268 | $200,000 |
| 0070 | Removal & disposal of existing pavement (2023000) | SY | 456 | $20.00 | $20.00 | $36.00 | $25.00 | $47.00 | $15.00 |
| 0080 | Removal & disposal of existing bridge (2028100) | LS | 1 | $130,000 | $175,000 | $125,000 | $200,000 | $248,163 | $200,000 |
| 0090 | Unclassified excavation (2031000) | CY | 2,499 | $30.00 | $30.00 | $33.00 | $25.00 | $72.00 | $31.00 |
| 0100 | Borrow excavation (2033000) | CY | 2,499 | $37.00 | $37.00 | $40.70 | $55.00 | $66.00 | $62.50 |
| 0110 | Muck excavation (2034000) | CY | 900 | $30.00 | $30.00 | $33.00 | $65.00 | $86.00 | $80.00 |
| 0120 | Geotextile, separation (2036020) | SY | 541 | $8.00 | $8.00 | $9.00 | $10.00 | $8.50 | $6.00 |
| 0130 | Geogrid stabilization (2037030) | SY | 1,196 | $8.00 | $8.00 | $9.00 | $10.00 | $14.00 | $12.50 |
| 0140 | Geotextile soil reinforcement (2037120) | SY | 1,067 | $8.00 | $8.00 | $9.00 | $10.00 | $15.00 | $6.00 |
| 0150 | Stone bridge lift material (2052010) | TON | 871 | $65.00 | $65.00 | $71.50 | $115.00 | $123.00 | $76.00 |
| 0160 | Granular bridge lift material (2052020) | CY | 100 | $75.00 | $75.00 | $82.50 | $80.00 | $147.00 | $90.75 |
| 0170 | Fine grading (2081001) | SY | 612 | $20.00 | $20.00 | $22.00 | $20.00 | $36.00 | $4.00 |
| 0180 | Flowable fill (2103000) | CY | 50 | $344.15 | $225.00 | $200.00 | $220.00 | $826.00 | $525.00 |
| 0190 | Maintenance stone (3059900) | TON | 10 | $100.00 | $100.00 | $120.00 | $150.00 | $200.00 | $175.00 |
| 0200 | HMA shoulder widening course (3104000) | TON | 75 | $303.00 | $264.40 | $333.00 | $500.00 | $151.00 | $360.00 |
| 0210 | Liquid asphalt binder PG64-22 (4011004) | TON | 45 | $755.00 | $752.30 | $825.00 | $500.00 | $1,020.00 | $875.00 |
| 0220 | Milling existing asphalt pavement (variable) (4013990) | SY | 444 | $33.78 | $20.99 | $73.00 | $6.50 | $29.00 | $40.00 |
| 0230 | Asphalt base course - type B (4020320) | TON | 85 | $475.00 | $236.80 | $515.00 | $150.00 | $151.00 | $575.00 |
| 0240 | Asphalt intermediate course type C (4030330) | TON | 548 | $198.00 | $138.81 | $213.00 | $150.00 | $151.00 | $215.00 |
| 0250 | Asphalt surface course type C (4040340) | TON | 206 | $178.00 | $165.05 | $193.00 | $325.00 | $151.00 | $200.00 |
| 0260 | Traffic control (6011000) | LS | 1 | $50,000 | $16,640 | $50,000 | $20,000 | $26,724 | $140,000 |
| 0270 | Barricade - type III (6041200) | LF | 96 | $25.00 | $19.00 | $55.00 | $50.00 | $25.00 | $60.00 |
| 0280 | Permanent construction signs (ground mounted) (6051120) | SF | 128 | $6.95 | $6.00 | $20.00 | $25.00 | $9.50 | $13.00 |
| 0290 | Permanent construction signs (barricade mounted) (6051125) | SF | 119 | $8.95 | $6.50 | $20.00 | $25.00 | $9.50 | $18.00 |
| 0300 | Construction zone electric changeable message sign (trailer (6062000) | EACH | 3 | $6,400.00 | $7,500.00 | $6,800.00 | $25,000 | $2,123.00 | $18,500 |
| 0310 | Type B - flashing light (608100B) | EACH | 16 | $165.00 | $105.00 | $265.00 | $200.00 | $145.00 | $280.00 |
| 0320 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 1,500 | $3.00 | $3.00 | $3.50 | $1.50 | $3.50 | $3.00 |
| 0330 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 1,500 | $3.00 | $3.00 | $3.50 | $1.50 | $3.50 | $3.00 |
| 0340 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 20 | $7.50 | $7.50 | $8.00 | $12.50 | $9.50 | $7.50 |
| 0350 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 12 | $28.00 | $30.00 | $45.00 | $60.00 | $32.00 | $50.00 |
| 0360 | U-section post for sign supports - 2P (6531205) | LF | 48 | $9.75 | $25.00 | $24.00 | $35.00 | $17.00 | $23.00 |
| 0370 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 444 | $17.83 | $18.00 | $18.00 | $20.00 | $33.00 | $30.00 |
| 0380 | Conc. for structures - class 4000 (7011400) | CY | 110 | $1,836.04 | $1,950.00 | $1,900.00 | $2,500.00 | $1,652.00 | $2,500.00 |
| 0390 | Reinf. steel for structures (bridge) (7031200) | LB | 32,354 | $1.25 | $2.50 | $1.46 | $1.50 | $2.95 | $2.00 |
| 0400 | 3'-0" X 2'-0" cored slabs (7046020) | LF | 978.30 | $350.00 | $550.00 | $300.00 | $300.00 | $329.00 | $600.00 |
| 0410 | 42" MASH concrete barrier parapet/railing wall (7051050) | LF | 220 | $165.57 | $175.00 | $2.15 | $330.00 | $244.00 | $165.00 |
| 0420 | Pile driving set-UP (7110010) | EACH | 14 | $5,512.59 | $4,250.00 | $1,400.00 | $12,000 | $7,456.00 | $2,500.00 |
| 0430 | Reinf. pile tips (HP14 X 73) (7111560) | EACH | 14 | $169.06 | $600.00 | $220.00 | $180.00 | $432.00 | $450.00 |
| 0440 | Steel H bearing piling (HP14 X 73) (7112220) | LF | 806 | $57.65 | $70.00 | $100.00 | $80.00 | $82.00 | $95.00 |
| 0450 | 18" smooth wall pipe (7143618) | LF | 24 | $120.00 | $120.00 | $132.00 | $400.00 | $542.00 | $125.00 |
| 0460 | 24" smooth wall pipe (7143624) | LF | 24 | $140.00 | $140.00 | $154.00 | $400.00 | $634.00 | $275.00 |
| 0470 | 4' slope flume (6" curb style with cutoffs) (7199200) | LF | 76 | $300.00 | $300.00 | $240.00 | $400.00 | $294.00 | $325.00 |
| 0480 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 488 | $52.00 | $52.00 | $40.00 | $75.00 | $58.00 | $53.00 |
| 0490 | Elastomeric bearing (7243100) | EACH | 28 | $150.00 | $425.00 | $290.00 | $220.00 | $370.00 | $300.00 |
| 0500 | Waterproofing (bridge deck) (7293000) | SY | 309.80 | $55.44 | $40.00 | $30.00 | $80.00 | $89.00 | $55.00 |
| 0510 | Rip-rap (class B) (8041020) | TON | 463 | $80.00 | $80.00 | $88.00 | $165.00 | $103.00 | $98.00 |
| 0520 | Geotextile for erosion control under riprap(class 2)type B (8048205) | SY | 500 | $8.00 | $8.00 | $9.00 | $5.00 | $3.07 | $5.00 |
| 0530 | Geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 100 | $8.00 | $8.00 | $9.00 | $5.00 | $8.21 | $16.00 |
| 0540 | MT2 leading end treatment TL2 (8051155) | EACH | 4 | $1,997.50 | $1,997.50 | $2,200.00 | $2,000.00 | $2,315.00 | $2,000.00 |
| 0550 | MGS2C GR behind curb (8052200) | LF | 400 | $23.25 | $23.25 | $26.40 | $25.00 | $29.00 | $23.25 |
| 0560 | MTBBC2 MASH thrie-beam barrier connector TL2 (8053255) | EACH | 4 | $1,400.00 | $1,400.00 | $1,540.00 | $1,500.00 | $1,736.00 | $1,400.00 |
| 0570 | Flume inlet at guardrail (handwork) (8053257) | EACH | 4 | $3,000.00 | $3,000.00 | $4,500.00 | $3,000.00 | $5,164.00 | $6,000.00 |
| 0580 | Non-mow strip under guardrail (8055250) | SY | 410 | $99.50 | $99.50 | $121.00 | $155.00 | $67.00 | $225.00 |
| 0590 | Temporary barrier fence (orange) (8068301) | LF | 500 | $4.00 | $3.25 | $5.00 | $5.00 | $3.49 | $4.00 |
| 0600 | Right of way marker(rebar and cap) (8091010) | EACH | 16 | $400.00 | $215.00 | $200.00 | $400.00 | $174.00 | $228.53 |
| 0610 | Right of way plat (8091050) | LS | 1 | $6,400.00 | $8,750.00 | $7,000.00 | $4,000.00 | $4,052.00 | $4,101.79 |
| 0620 | Permanent cover (8100100) | ACRE | 0.32 | $6,300.00 | $5,849.06 | $1,500.00 | $6,300.00 | $4,551.00 | $6,340.00 |
| 0630 | Temporary cover (8100200) | ACRE | 0.48 | $5,500.00 | $2,955.97 | $1,000.00 | $5,500.00 | $4,491.00 | $5,534.00 |
| 0640 | Compost (8101105) | CY | 38 | $42.00 | $75.15 | $100.00 | $50.00 | $91.00 | $42.00 |
| 0650 | Fertilizer (nitrogen) (8104005) | LB | 32 | $6.00 | $2.00 | $2.00 | $7.00 | $5.79 | $6.00 |
| 0660 | Fertilizer (phosphoric acid) (8104010) | LB | 32 | $6.00 | $2.00 | $2.00 | $7.00 | $5.79 | $6.00 |
| 0670 | Fertilizer (potash) (8104015) | LB | 32 | $6.00 | $2.00 | $2.00 | $7.00 | $5.79 | $6.00 |
| 0680 | Agricultural granular lime (8105005) | LB | 636 | $0.50 | $1.00 | $2.00 | $1.00 | $3.55 | $0.50 |
| 0690 | Mowing (8109901) | ACRE | 1.59 | $1,200.00 | $50.00 | $1,000.00 | $1,200.00 | $1,747.00 | $1,200.00 |
| 0700 | Temporary erosion control blanket (ecb) (8151110) | MSY | 0.11 | $8,200.00 | $9,247.79 | $3,000.00 | $10,000 | $10,248 | $8,707.96 |
| 0710 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 1.59 | $2,900.00 | $3,800.00 | $4,000.00 | $3,000.00 | $4,079.00 | $2,918.24 |
| 0720 | Sediment tubes for ditch checks (8152007) | LF | 180 | $15.00 | $15.00 | $16.00 | $15.00 | $92.00 | $15.00 |
| 0730 | Silt fence (8153000) | LF | 4,314 | $3.50 | $2.95 | $5.00 | $4.50 | $3.50 | $4.50 |
| 0740 | Replace/repair silt fence (8153090) | LF | 431 | $6.00 | $2.95 | $5.00 | $4.50 | $5.80 | $6.00 |
| 0750 | Floating turbidity barrier- heavy duty(5'depth) (8153305) | LF | 400 | $31.00 | $25.00 | $50.00 | $35.00 | $96.00 | $60.00 |
| 0760 | Removal of silt retained by silt fence (8154050) | LF | 1,079 | $5.03 | $20.00 | $3.00 | $4.00 | $13.00 | $25.00 |
| 0770 | Stabilized construction entrance (8156490) | SY | 550 | $25.00 | $25.00 | $30.00 | $35.00 | $15.00 | $32.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of September 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.