SCDOT contract 2973031 bid tabulation

Intersection Improvement - SC 5 at S-358 (Steel Hill Road). Let by South Carolina DOT on October 13, 2026, Lancaster, District 4. 9 bids received; low bid $1,484,396 by Truerock Construction, LLC.

Owner
South Carolina DOT
Letting
13 OCT 2026
Pay items
74
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Truerock Construction, LLC$1,484,396Low
2Eagle Construction Company$1,625,018+9.0%
3King Asphalt, Inc.$1,648,219+11%
4Blythe Development, LLC$1,764,187+19%
5Kershaw Builders, Inc.$1,790,185+21%
6Lci-Lineberger Construction, Inc.$1,944,884+31%
7Universal Civil Construction, LLC$2,317,599+56%
8Coogler Construction, Inc.$2,677,260+80%
9Aos Specialty Contractors, Inc.$2,697,170+82%
SCDOT contract 2973031: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Truerock Construction, LLC2. Eagle Construction Company3. King Asphalt, Inc.4. Blythe Development, LLC5. Kershaw Builders, Inc.6. Lci-Lineberger Construction, Inc.
0010Mobilization (1031000)LS1$68,113$70,000$81,800$87,000$75,000$64,500
0020Bonds and insurance (1032010)LS1$5,200.00$10,000$48,800$10,077$35,102$33,500
0030Construction stakes, lines & grades (1050800)EACH1$15,000$29,000$18,750$30,000$35,000$36,850
0040Utility staking (1052001)LS1$7,500.00$2,500.00$7,000.00$25,000$15,000$6,500.00
0050Clearing & grubbing within right of way (2011000)LS1$118,010$63,500$70,000$306,981$25,000$65,000
0060Removal & disposal of existing pavement (2023000)SY245$25.00$10.00$23.00$15.00$12.00$15.00
0070Removal of exist. guardrail (2027801)LF275$1.00$3.00$1.00$1.00$10.00$5.71
0080Unclassified excavation (2031000)CY13,384$12.95$13.50$23.00$11.00$6.50$28.95
0090Borrow excavation (2033000)CY100$100.00$25.00$45.00$27.00$28.50$40.00
0100Fine grading (2081001)SY2,973$6.35$1.50$12.00$5.00$10.00$7.50
0110Maintenance stone (3059900)TON20$98.00$56.50$60.00$53.00$75.00$140.00
0120Liquid asphalt binder PG64-22 (4011004)TON243$665.00$895.00$889.00$815.00$825.00$870.00
0130Full depth asph. pav. patching 15"unif (4012150)SY100$245.00$300.00$291.00$200.00$325.00$325.00
0140Milling existing asphalt pavement 1.75" (4013117)SY14,500$3.55$4.35$4.00$3.40$3.69$2.86
0150Milling existing asphalt pavement (variable) (4013990)SY1,373$9.05$10.00$9.00$3.40$6.44$11.00
0160Asphalt base course - type A (4020310)TON1,874$81.00$89.50$86.00$94.00$135.08$102.00
0170Asphalt base course - type B (4020320)TON62$160.00$165.00$156.00$94.00$165.00$210.00
0180Asphalt intermediate course type B (4030320)TON627$90.00$101.00$98.00$97.00$144.00$125.00
0190Asphalt surface course type B (4040320)TON1,908$81.00$84.25$81.00$82.50$121.00$98.00
0200Asphalt surface course type C (4040340)TON20$208.00$400.00$375.00$100.00$165.00$260.00
0210Asphalt surface course type E (4040360)TON194$85.00$117.00$112.00$100.00$165.00$150.00
0220Driveway paving-surface type C (4047220)TON104$158.00$235.00$220.00$150.00$357.50$150.00
0230Traffic control (6011000)LS1$130,000$217,000$50,000$150,000$150,000$190,000
0240Permanent construction signs (ground mounted) (6051120)SF276$6.85$10.00$5.80$8.64$11.00$8.08
0250Pavement markings(temp- paint) 4" white broken lines (609105A)LF310$0.15$0.18$0.15$0.15$0.20$0.14
0260Pavement markings(temporary-paint)-4" white solid lines (609115A)LF51,780$0.15$0.18$0.15$0.15$0.20$0.14
0270Pavement markings(temporary-paint)-4" yellow solid lines (609115B)LF51,780$0.15$0.18$0.15$0.15$0.20$0.14
0280Pavement markings(temporary-paint)- 24"white solid lines (609135A)LF200$1.50$1.70$1.50$1.50$1.25$1.15
0290Temporary yellow pavement markers BI-dir.- 4"X4" (6092155)EACH300$8.50$9.75$8.50$8.50$10.50$11.54
03004" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF540$0.75$0.85$0.75$0.75$0.95$0.58
03104" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF9,900$0.50$0.60$0.50$0.50$0.95$0.58
032024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF86$15.00$17.00$15.00$15.00$14.00$11.54
0330White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030)EACH2$150.00$170.00$150.00$150.00$125.00$86.53
0340White word message "only" - thermoplastic - 125 mil. (6271035)EACH2$150.00$170.00$150.00$150.00$125.00$86.53
03504" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF14,600$0.50$0.60$0.50$0.50$0.95$0.58
0360Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH5$8.50$9.75$8.50$8.50$9.50$6.92
0370Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH150$8.50$9.75$8.50$8.50$9.50$6.92
0380Milled-in rumble strip (6321000)MI2$3,700.00$2,800.00$3,292.00$3,000.00$4,500.00$2,768.99
0390Flat sheet, type III, fixed SZ. & MSG. sign (6510105)SF110$14.94$29.50$13.00$15.12$42.50$28.84
0400Flat sheet, type III, size determined by MSG (6510106)SF55$12.64$37.00$11.00$15.12$42.50$28.84
0410U-section post for sign supports - 3P (6531210)LF359$10.34$21.00$9.00$9.19$10.90$17.31
0420U-section post for sign bracing - 2P (6531215)LF28$9.19$21.00$8.00$8.64$10.50$17.31
043018" smooth wall pipe (7143618)LF224$298.00$78.00$196.89$180.00$84.50$265.00
0440Drop inlet type 112 (7192040)EACH1$6,229.70$12,000$6,856.00$11,000$7,250.00$10,150
0450Concrete collar for UP to 24" pipe (7197052)EACH1$3,458.50$6,500.00$5,693.00$1,600.00$4,400.00$5,800.00
0460Beveling of pipe end (7199100)EACH4$1,660.00$700.00$784.00$1,600.00$450.00$2,200.00
0470Concrete flume (7207001)LF35$118.00$425.00$240.00$55.00$300.00$70.00
0480Bituminous curb (7211000)LF275$59.55$45.00$39.00$73.00$64.00$48.58
0490Rip-rap (class A) (8041010)TON51$111.65$75.50$146.00$87.00$132.50$175.00
0500Rip-rap (class B) (8041020)TON52$107.90$75.50$139.00$93.00$115.50$175.00
0510Geotextile for erosion control under riprap(class 2)type B (8048205)SY201$8.00$4.50$5.00$4.00$3.75$10.00
0520Premash reset W-beam strong post system (8051900)LF12.50$25.00$26.00$25.00$18.00$35.00$28.84
0530Premash W-beam compressed SHLDR 9' post (8053001)LF225$36.00$46.00$36.00$36.00$59.00$56.53
0540Premash type T TL3 leading 50' (8057100)EACH1$3,200.00$4,000.00$3,200.00$3,200.00$5,250.00$5,191.85
0550Right of way marker(rebar and cap) (8091010)EACH5$80.00$350.00$700.00$288.00$1,500.00$331.24
0560Right of way plat (8091050)LS1$2,250.00$2,500.00$4,000.00$1,500.00$5,000.00$1,730.62
0570Permanent cover (8100100)ACRE2.90$1,325.00$1,525.00$1,995.00$1,800.00$2,750.00$2,134.42
0580Temporary cover (8100200)ACRE1.45$1,100.00$1,275.00$1,075.00$1,800.00$2,750.00$1,442.10
0590Compost (8101105)CY780$26.00$30.00$10.00$45.00$78.50$20.00
0600Fertilizer (nitrogen) (8104005)LB290$3.25$3.75$2.25$2.00$7.50$2.60
0610Fertilizer (phosphoric acid) (8104010)LB290$3.25$3.75$2.25$2.00$7.50$2.60
0620Fertilizer (potash) (8104015)LB290$3.25$3.75$2.25$2.00$7.50$2.60
0630Agricultural granular lime (8105005)LB5,800$0.35$0.50$0.35$0.90$5.00$0.81
0640Selective watering (8109050)GAL54,300$0.07$0.08$0.25$0.15$0.15$0.10
0650Mowing (8109901)ACRE8.70$450.00$500.00$450.00$600.00$750.00$340.35
0660Temporary erosion control blanket (ecb) (8151110)MSY4.58$1,600.00$1,850.00$1,648.00$1,655.00$3,600.00$1,619.24
0670Hydraulic erosion control product (hecp) - type 3 (8151203)ACRE8.70$2,850.00$3,275.00$3,350.00$3,200.00$3,500.00$4,384.23
0680Silt fence (8153000)LF500$4.00$4.50$3.00$5.25$4.25$7.00
0690Cleaning silt basins (8154010)CY150$16.50$20.00$53.00$26.00$50.00$50.00
0700Cleaning inlet structure filters (8156200)EACH2$247.00$175.00$900.00$150.00$1,250.00$525.00
0710Inlet structure filter - type D2 (8156215)EACH1$650.00$650.00$400.00$260.00$1,250.00$675.00
0720Filter material for inlet structure filter - type D2 (8156217)EACH1$450.00$400.00$650.00$30.00$1,250.00$675.00
0730Aggregate no.5 or 57 for erosion control (8156410)TON13$78.00$70.00$100.00$69.00$78.50$125.00
0740Stabilized construction entrance (8156490)SY550$22.00$26.00$25.00$27.00$18.50$20.00
SCDOT contract 2973031: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of October 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy