Palmetto Sitework Services, LLC: SCDOT bid record
Palmetto Sitework Services, LLC submitted 33 bids on South Carolina DOT contracts in the data, from 08 MAR 2022 to 13 OCT 2026, and was the low bidder on 12 of them (36%). When it was not low, its total sat a median +35% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $42,469,632
- Latest bid
- 13 OCT 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 3 | 60% |
| 2023 | 3 | 1 | 33% |
| 2024 | 5 | 2 | 40% |
| 2025 | 11 | 3 | 27% |
| 2026 | 9 | 3 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 13 | 1 | 8% |
| District 7 | 10 | 6 | 60% |
| District 6 | 10 | 5 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Agricultural granular lime | 8105005 | LB | 23 | 14 (61%) | $0.40 | $0.60 |
| Silt fence | 8153000 | LF | 30 | 13 (43%) | $3.12 | $4.00 |
| Replace/repair silt fence | 8153090 | LF | 21 | 12 (57%) | $2.25 | $4.15 |
| Fine grading | 2081001 | SY | 21 | 12 (57%) | $8.00 | $8.00 |
| Stabilized construction entrance | 8156490 | SY | 27 | 9 (33%) | $15.50 | $23.00 |
| Selective watering | 8109050 | GAL | 21 | 9 (43%) | $0.05 | $0.07 |
| Unclassified excavation | 2031000 | CY | 27 | 8 (30%) | $39.00 | $42.80 |
| Milling existing asphalt pavement (variable) | 4013990 | SY | 17 | 8 (47%) | $11.00 | $11.30 |
| Concrete curb and gutter(2'-0") vertical face | 7203210 | LF | 16 | 8 (50%) | $44.00 | $48.00 |
| Inlet structure filter - type B | 8156210 | EACH | 11 | 8 (73%) | $185.00 | $315.00 |
| Borrow excavation | 2033000 | CY | 25 | 7 (28%) | $50.00 | $49.70 |
| Temporary cover | 8100200 | ACRE | 24 | 7 (29%) | $1,520.00 | $1,450.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Aos Specialty Contractors, Inc. | 14 | 7 of 14 |
| L-J, Inc. | 13 | 2 of 13 |
| Cherokee, Inc. | 12 | 5 of 12 |
| Site-Prep, Inc. of NC | 12 | 7 of 12 |
| Palmetto Corp. of Conway | 11 | 2 of 11 |
| Eagle Construction Company | 10 | 6 of 10 |
| Universal Civil Construction, LLC | 6 | 4 of 6 |
| Edisto Contracting, LLC | 4 | 1 of 4 |
| Banks Construction Company | 4 | 2 of 4 |
| Coogler Construction, Inc. | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 OCT 2026 | 1075380 | District 6 | US 17 at Buck Hall Landing Road (Right Turn Lane) | 6 of 7 | $632,702 | +73% |
| 09 SEP 2026 | 0965790 | District 7 | Safety Improvement - US 21/ SC 172/ SC 6 (Calhoun Co) | 1 of 8 | $2,584,739 | Low, 3.0% under the second |
| 11 AUG 2026 | 3276951 | District 1 | Replace the existing culvert along S-59 (Devils Backbone Rd | 7 of 11 | $1,798,308 | +40% |
| 12 MAY 2026 | 0274010 | District 7 | Emergency Culvert Replacement – Altees Corbett Rd. (S-2-111) in Aiken County | 6 of 9 | $989,249 | +26% |
| 12 MAY 2026 | 0876380 | District 6 | Sidewalk Improvements in Moncks Corner | 5 of 5 | $2,077,182 | +60% |
| 12 MAY 2026 | 4059900 | District 1 | Safety Improvement - SC 764 (Richland Co) | 6 of 7 | $453,903 | +54% |
| 14 APR 2026 | 3872110 | District 7 | Orangeburg SC 389 @ SC 394 Int. Improvement | 4 of 6 | $2,746,089 | +35% |
| 13 JAN 2026 | 0657500 | District 7 | Bike/Ped Enhancements along SC 3 (Marlboro Ave.) | 1 of 4 | $5,480,384 | Low, 4.0% under the second |
| 13 JAN 2026 | 1057262 | District 6 | RSA Pedestrian Focus S-107 (MP 0 - 1.42) - Bike/Ped Safety | 1 of 1 | $9,459,145 | Low |
| 09 DEC 2025 | 3265530 | District 1 | Roundabout at SC 6 and S-65 | 4 of 8 | $3,033,287 | +14% |
| 12 NOV 2025 | 4068500 | District 1 | Rosedale Arch Sidewalk Project | 4 of 9 | $397,020 | +45% |
| 12 NOV 2025 | 4372140 | District 1 | Intersection Improvement US 378 @ SC 527 | 1 of 3 | $3,680,965 | Low, 6.0% under the second |
| 12 NOV 2025 | 4373280 | District 1 | Intersection Improvement US-378 at N. St. Paul's Church Rd | 3 of 3 | $1,710,611 | +24% |
| 09 SEP 2025 | 3265540 | District 1 | Roundabout at S-279 and S-627 | 2 of 7 | $2,736,138 | +10% |
| 12 AUG 2025 | 3259590 | District 1 | Enhancement - Lexington Co | 2 of 6 | $1,187,219 | +13% |
| 12 AUG 2025 | 3266340 | District 1 | Center St. Sidewalk | 2 of 3 | $209,836 | +50% |
| 12 AUG 2025 | 3856130 | District 7 | Improve Corridor along SC 4 (Stonewall Jackson St) | 1 of 5 | $2,056,234 | Low, 7.0% under the second |
| 13 MAY 2025 | 0873130 | District 6 | US-176 (State Rd.) / S-467 (Black Tom Rd.) | 2 of 2 | $5,154,335 | +25% |
| 13 MAY 2025 | 1057102 | District 6 | Safety Improvement at S-169 / S-881 | 1 of 1 | $4,153,436 | Low |
| 14 JAN 2025 | 4071450 | District 1 | Install sidewalk and bike lane on Bluff Rd. | 5 of 6 | $1,745,984 | +7.0% |
| 10 SEP 2024 | 5662380 | District 6 | Safety Improvements - RSA S-75 (Ashley Phosphate Rd) | 2 of 2 | $14,845,858 | +47% |
| 13 AUG 2024 | 0852230 | District 6 | Safety/Intersection Improvements - Berkeley Co | 1 of 2 | $7,135,140 | Low, 15% under the second |
| 13 AUG 2024 | 0969590 | District 7 | S-9-38 (Cardinal Rd.) Emergency Culvert Replacement | 1 of 8 | $935,325 | Low, 5.0% under the second |
| 11 JUN 2024 | 3253001 | District 1 | Emergency Repair - S-944 (Lexington Co) | 5 of 6 | $2,813,922 | +89% |
| 13 FEB 2024 | 4036140 | District 1 | Enhancement/Safety Improvements - Richland Co | 4 of 4 | $3,498,639 | +50% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.