SCDOT contract 4372140 bid tabulation
Intersection Improvement US 378 @ SC 527. Let by South Carolina DOT on November 12, 2025, Sumter, District 1. 3 bids received; low bid $3,680,965 by Palmetto Sitework Services, LLC.
- Owner
- South Carolina DOT
- Letting
- 12 NOV 2025
- Pay items
- 94
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Palmetto Sitework Services, LLC | $3,680,965 | Low |
| 2 | Cherokee, Inc. | $3,911,989 | +6.0% |
| 3 | Universal Civil Construction, LLC | $4,169,624 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Palmetto Sitework Services, LLC | 2. Cherokee, Inc. | 3. Universal Civil Construction, LLC |
|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $180,000 | $195,600 | $208,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $75,000 | $78,300 | $125,000 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $45,000 | $45,000 | $55,001 |
| 0040 | Utility staking (1052001) | LS | 1 | $5,500.00 | $7,500.00 | $12,500 |
| 0050 | CPM progress schedule (1080300) | LS | 1 | $17,000 | $8,500.00 | $8,000.00 |
| 0060 | Clearing & grubbing within right of way (2011000) | LS | 1 | $30,000 | $176,600 | $105,000 |
| 0070 | Removal & disposal of existing asphalt pavement (2025000) | SY | 1,760 | $40.00 | $25.00 | $9.50 |
| 0080 | Unclassified excavation (2031000) | CY | 3,161 | $24.20 | $40.00 | $24.00 |
| 0090 | Borrow excavation (2033000) | CY | 1,587 | $45.00 | $35.00 | $38.00 |
| 0100 | Fine grading (2081001) | SY | 6,150 | $1.27 | $6.00 | $5.50 |
| 0110 | Flowable fill (2103000) | CY | 134 | $240.00 | $400.00 | $300.00 |
| 0120 | Liquid asphalt binder PG64-22 (4011004) | TON | 516.31 | $690.00 | $720.00 | $682.50 |
| 0130 | Milling existing asphalt pavement (variable) (4013990) | SY | 2,550 | $8.25 | $14.00 | $8.20 |
| 0140 | Asphalt base course - type A (4020310) | TON | 1,961.30 | $133.00 | $143.00 | $132.25 |
| 0150 | Asphalt intermediate course type B (4030320) | TON | 389.90 | $170.00 | $153.00 | $170.00 |
| 0160 | Asphalt surface course type B (4040320) | TON | 4,669.80 | $130.00 | $131.00 | $129.75 |
| 0170 | Asphalt surface course type C (4040340) | TON | 412.90 | $254.00 | $137.00 | $253.00 |
| 0180 | Asphalt surface course type E (4040360) | TON | 794 | $125.00 | $176.00 | $124.25 |
| 0190 | Traffic control (6011000) | LS | 1 | $255,000 | $268,000 | $500,000 |
| 0200 | Barricade - type III (6041200) | LF | 36 | $23.35 | $35.00 | $28.00 |
| 0210 | Permanent construction signs (ground mounted) (6051120) | SF | 552 | $8.25 | $10.00 | $8.50 |
| 0220 | Permanent construction signs (barricade mounted) (6051125) | SF | 123 | $8.25 | $10.00 | $9.00 |
| 0230 | Construction zone electric changeable message sign (trailer (6062000) | EACH | 2 | $5,000.00 | $10,000 | $10,000 |
| 0240 | Pavement markings (temporary paint) 24"X36" white triangle yield bar (609138A) | LF | 64 | $2.25 | $2.20 | $2.04 |
| 0250 | Temporary clear pavement markers mono-dir.- 4"X4" (6092100) | EACH | 180 | $8.35 | $9.00 | $7.65 |
| 0260 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 48 | $8.35 | $9.00 | $7.65 |
| 0270 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 3,800 | $0.15 | $0.15 | $0.12 |
| 0280 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 9,400 | $0.15 | $0.15 | $0.12 |
| 0290 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 3,200 | $0.06 | $0.55 | $0.05 |
| 0300 | 12" white solid lines - fast dry paint (6240020) | LF | 500 | $0.15 | $0.15 | $0.12 |
| 0310 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 600 | $0.30 | $0.31 | $0.26 |
| 0320 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 16 | $11.15 | $12.00 | $10.20 |
| 0330 | White word message "only"- fast dry paint (6240035) | EACH | 24 | $11.15 | $12.00 | $10.20 |
| 0340 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 2,000 | $0.15 | $0.15 | $0.12 |
| 0350 | 6"yel solid lines on 6"conc.curb(top&side)-fast dry PNT (6240113) | LF | 650 | $1.15 | $1.10 | $1.02 |
| 0360 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 1,900 | $0.85 | $0.95 | $0.77 |
| 0370 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 4,700 | $0.85 | $0.95 | $0.77 |
| 0380 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 1,600 | $2.80 | $2.75 | $2.55 |
| 0390 | 12" white solid lines - thermo. - 125 mil. (6271020) | LF | 250 | $3.90 | $4.00 | $3.57 |
| 0400 | 24IN X 36IN white triang. yield bar (gaps exc)thermo-125MIL (6271024) | LF | 32 | $16.70 | $17.50 | $15.30 |
| 0410 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 300 | $8.35 | $9.00 | $7.65 |
| 0420 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 8 | $111.15 | $110.00 | $102.00 |
| 0430 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 12 | $111.15 | $110.00 | $102.00 |
| 0440 | White U-turn arrow thermo- 125MIL (6271042) | EACH | 4 | $139.00 | $150.00 | $127.50 |
| 0450 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 1,000 | $0.85 | $1.00 | $0.77 |
| 0460 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 120 | $8.35 | $9.00 | $7.65 |
| 0470 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 32 | $8.35 | $9.00 | $7.65 |
| 0480 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 473.74 | $41.65 | $18.00 | $14.17 |
| 0490 | Flat sheet, type III, size determined by MSG (6510106) | SF | 232 | $54.00 | $18.00 | $14.17 |
| 0500 | U-section post for sign supports - 3P (6531210) | LF | 912 | $17.70 | $10.00 | $8.72 |
| 0510 | U-section post for sign bracing - 2P (6531215) | LF | 8.56 | $17.70 | $10.00 | $8.72 |
| 0520 | Reflective sign post panels (6531500) | LF | 140 | $22.80 | $8.00 | $6.54 |
| 0530 | 18" smooth wall pipe (7143618) | LF | 1,672 | $135.00 | $90.00 | $145.50 |
| 0540 | 24" smooth wall pipe (7143624) | LF | 504 | $128.12 | $120.00 | $164.50 |
| 0550 | 30" smooth wall pipe (7143630) | LF | 64 | $189.97 | $175.00 | $233.00 |
| 0560 | 36" smooth wall pipe (7143636) | LF | 344 | $212.41 | $190.00 | $196.00 |
| 0570 | Cleaning existing pipe (7149999) | LF | 400 | $25.00 | $20.00 | $21.00 |
| 0580 | Catch basin-type 1 special(modified for conc.median barrier) (7191060) | EACH | 3 | $6,200.00 | $6,000.00 | $6,811.00 |
| 0590 | Drop inlet type 125 triple 4'X6.5' box (719125E) | EACH | 2 | $9,700.00 | $10,000 | $13,300 |
| 0600 | Catch basin -type 16 (7191605) | EACH | 31 | $6,638.93 | $6,500.00 | $6,950.00 |
| 0610 | Drop inlet (24" X 24") with standard 4' X 4' box (7192011) | EACH | 2 | $6,500.00 | $5,500.00 | $6,525.00 |
| 0620 | Extra depth of box (7196000) | LF | 3 | $625.00 | $500.00 | $2,100.00 |
| 0630 | Beveling of pipe end (7199100) | EACH | 23 | $300.00 | $500.00 | $225.00 |
| 0640 | Concrete curb and gutter(2'-0") sloping face (7203220) | LF | 2,820 | $45.00 | $47.30 | $56.00 |
| 0650 | Concrete median (7206000) | SY | 1,510 | $92.00 | $98.00 | $109.00 |
| 0660 | Rip-rap (class A) (8041010) | TON | 140 | $100.00 | $95.00 | $136.50 |
| 0670 | Rip-rap (class B) (8041020) | TON | 630 | $100.00 | $95.00 | $119.50 |
| 0680 | Geotextile for erosion control under riprap(class 2)type B (8048205) | SY | 800 | $2.50 | $5.00 | $2.75 |
| 0690 | Temporary barrier fence (orange) (8068301) | LF | 260 | $3.35 | $6.00 | $6.00 |
| 0700 | Right of way marker(rebar and cap) (8091010) | EACH | 11 | $215.00 | $200.00 | $215.00 |
| 0710 | Right of way plat (8091050) | LS | 1 | $4,200.00 | $5,000.00 | $4,700.00 |
| 0720 | Permanent cover (8100100) | ACRE | 6 | $1,550.00 | $1,750.00 | $1,925.00 |
| 0730 | Temporary cover (8100200) | ACRE | 12 | $1,300.00 | $1,600.00 | $1,700.00 |
| 0740 | Fertilizer (nitrogen) (8104005) | LB | 600 | $2.32 | $4.40 | $2.75 |
| 0750 | Fertilizer (phosphoric acid) (8104010) | LB | 600 | $2.32 | $4.40 | $2.75 |
| 0760 | Fertilizer (potash) (8104015) | LB | 600 | $2.32 | $4.40 | $2.75 |
| 0770 | Agricultural granular lime (8105005) | LB | 12,000 | $0.21 | $0.50 | $0.40 |
| 0780 | Selective watering (8109050) | GAL | 135,750 | $0.04 | $0.09 | $0.03 |
| 0790 | Mowing (8109901) | ACRE | 36 | $570.00 | $450.00 | $450.00 |
| 0800 | Temporary erosion control blanket (ecb) (8151110) | MSY | 10.20 | $1,495.00 | $1,900.00 | $1,335.00 |
| 0810 | Hydraulic erosion control product (hecp) - type 1 (8151201) | ACRE | 16.80 | $1,650.00 | $1,550.00 | $1,700.00 |
| 0820 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 1.20 | $3,970.00 | $3,300.00 | $3,700.00 |
| 0830 | Inlet structure filter - type F (weighted) (8152004) | LF | 1,230 | $11.90 | $15.00 | $18.25 |
| 0840 | Inlet structure filter- type F (non-weighted) (8152006) | LF | 1,230 | $17.00 | $15.00 | $5.00 |
| 0850 | Sediment tubes for ditch checks (8152007) | LF | 950 | $13.40 | $12.00 | $11.00 |
| 0860 | Silt fence (8153000) | LF | 2,720 | $3.10 | $5.00 | $2.60 |
| 0870 | Replace/repair silt fence (8153090) | LF | 272 | $2.40 | $5.50 | $4.75 |
| 0880 | Cleaning silt basins (8154010) | CY | 10 | $38.00 | $10.00 | $28.00 |
| 0890 | Inlet filter cleaning (8154155) | EACH | 130 | $78.00 | $125.00 | $170.00 |
| 0900 | Inlet structure filter - type B (8156210) | EACH | 14 | $129.00 | $350.00 | $250.00 |
| 0910 | Inlet structure filter - type A (8156219) | LF | 1,640 | $4.15 | $15.00 | $6.75 |
| 0920 | Aggregate no.5 or 57 for erosion control (8156410) | TON | 50 | $85.00 | $85.00 | $150.00 |
| 0930 | Stabilized construction entrance (8156490) | SY | 550 | $15.00 | $23.00 | $22.00 |
| 0940 | Temporary flexible pipe slope drain - 12" (8157012) | LF | 220 | $40.00 | $35.00 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of November 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.