Cherokee, Inc.: SCDOT bid record
Cherokee, Inc. submitted 25 bids on South Carolina DOT contracts in the data, from 11 JAN 2022 to 11 AUG 2026, and was the low bidder on 5 of them (20%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $8,044,623
- Latest bid
- 11 AUG 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 4 | 2 | 50% |
| 2024 | 2 | 0 | 0% |
| 2025 | 8 | 1 | 13% |
| 2026 | 11 | 2 | 18% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 9 | 2 | 22% |
| District 5 | 8 | 3 | 38% |
| District 1 | 5 | 0 | 0% |
| District 4 | 2 | 0 | 0% |
| District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Borrow excavation | 2033000 | CY | 21 | 10 (48%) | $35.00 | $49.70 |
| Mowing | 8109901 | ACRE | 20 | 9 (45%) | $450.00 | $500.00 |
| Maintenance stone | 3059900 | TON | 14 | 9 (64%) | $60.00 | $92.63 |
| 18" smooth wall pipe | 7143618 | LF | 16 | 7 (44%) | $97.50 | $140.00 |
| Stabilized construction entrance | 8156490 | SY | 23 | 6 (26%) | $20.00 | $23.00 |
| Agricultural granular lime | 8105005 | LB | 20 | 6 (30%) | $0.57 | $0.60 |
| Rip-rap (class B) | 8041020 | TON | 16 | 6 (38%) | $116.62 | $118.00 |
| Hydraulic erosion control product (hecp) - type 3 | 8151203 | ACRE | 15 | 6 (40%) | $3,500.00 | $3,600.00 |
| Cleaning silt basins | 8154010 | CY | 8 | 6 (75%) | $10.00 | $45.00 |
| Concrete sidewalk(4" uniform) | 7204100 | SY | 11 | 5 (45%) | $76.60 | $78.00 |
| 24" smooth wall pipe | 7143624 | LF | 11 | 5 (45%) | $118.53 | $158.37 |
| Liquid asphalt binder PG64-22 | 4011004 | TON | 21 | 4 (19%) | $737.00 | $715.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Palmetto Corp. of Conway | 12 | 4 of 12 |
| Palmetto Sitework Services, LLC | 12 | 7 of 12 |
| Aos Specialty Contractors, Inc. | 12 | 6 of 12 |
| L-J, Inc. | 7 | 1 of 7 |
| Site-Prep, Inc. of NC | 7 | 6 of 7 |
| Eagle Construction Company | 5 | 2 of 5 |
| Universal Civil Construction, LLC | 4 | 2 of 4 |
| Edisto Contracting, LLC | 3 | 2 of 3 |
| R.E. Goodson Construction Co., Inc. | 3 | 1 of 3 |
| King Asphalt, Inc. | 3 | 0 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 AUG 2026 | 3276951 | District 1 | Replace the existing culvert along S-59 (Devils Backbone Rd | 4 of 11 | $1,521,843 | +18% |
| 09 JUN 2026 | 2163100 | District 5 | SC 403 (N Bethel Rd) at SC 341 (Olanta Hwy) Intersection Imp | 1 of 5 | $2,755,496 | Low, 2.0% under the second |
| 09 JUN 2026 | 2176510 | District 5 | Johnsonville (Stuckey Rd., East Marion St., South Jackson Av | 4 of 4 | $508,361 | +34% |
| 12 MAY 2026 | 0274010 | District 7 | Emergency Culvert Replacement – Altees Corbett Rd. (S-2-111) in Aiken County | 4 of 9 | $909,501 | +16% |
| 12 MAY 2026 | 4059900 | District 1 | Safety Improvement - SC 764 (Richland Co) | 3 of 7 | $411,002 | +40% |
| 14 APR 2026 | 3872110 | District 7 | Orangeburg SC 389 @ SC 394 Int. Improvement | 5 of 6 | $2,820,486 | +38% |
| 10 MAR 2026 | 1362870 | District 4 | Intersection Improvements Chesterfield County | 2 of 2 | $1,699,463 | +8.0% |
| 10 MAR 2026 | 1663790 | District 5 | Intersection Improvement - S-16-102 (14th Street) & S-16-155 | 1 of 1 | $3,434,372 | Low |
| 10 MAR 2026 | 3964560 | District 3 | Town of Central Pedestrian/Bike Connector | 3 of 3 | $908,792 | +54% |
| 13 JAN 2026 | 0657500 | District 7 | Bike/Ped Enhancements along SC 3 (Marlboro Ave.) | 3 of 4 | $6,268,505 | +14% |
| 13 JAN 2026 | 4070850 | District 1 | S-40-64 Arcadia Lakes Drive over Coopers Pond | 2 of 7 | $2,657,015 | +2.0% |
| 12 NOV 2025 | 2160650 | District 5 | Intersection Improvement E Nat. Cemetery Rd and Papermill Rd | 2 of 6 | $2,129,955 | +2.0% |
| 12 NOV 2025 | 4372140 | District 1 | Intersection Improvement US 378 @ SC 527 | 2 of 3 | $3,911,989 | +6.0% |
| 12 NOV 2025 | 4562140 | District 5 | US 52 & S-186 (Eastland Ave.) Intersection Improvement | 3 of 3 | $815,665 | +50% |
| 14 OCT 2025 | 1272231 | District 4 | SYSTEM UPGRADE: SC 901 (Edgeland Road) | 3 of 7 | $4,870,588 | +11% |
| 12 AUG 2025 | 3856130 | District 7 | Improve Corridor along SC 4 (Stonewall Jackson St) | 5 of 5 | $2,541,315 | +24% |
| 12 AUG 2025 | 4562130 | District 5 | Easler Hwy. & Holliman Rd. & OGR Intersection Improvement | 2 of 2 | $1,207,953 | +2.0% |
| 11 FEB 2025 | 1470210 | District 7 | Improvements on S-14-23 Old Georgetown Rd. and S-14-516 | 1 of 4 | $866,234 | Low, 19% under the second |
| 14 JAN 2025 | 4071450 | District 1 | Install sidewalk and bike lane on Bluff Rd. | 4 of 6 | $1,714,160 | +5.0% |
| 10 DEC 2024 | 2162290 | District 5 | Intersection Improvement - S-829 (Holly Circle) at US 76 (West Palmetto St) & SC 51 (Second Loop Rd) | 4 of 5 | $2,960,684 | +16% |
| 13 AUG 2024 | 0969590 | District 7 | S-9-38 (Cardinal Rd.) Emergency Culvert Replacement | 5 of 8 | $1,164,629 | +25% |
| 11 OCT 2022 | 3855150 | District 7 | Enhancement - US 601/S-2032/S-1603 | 1 of 3 | $730,113 | Low, 33% under the second |
| 12 MAY 2022 | 3862091 | District 7 | Culvert Repair - S-562 | 3 of 5 | $944,171 | +71% |
| 12 MAY 2022 | 3862101 | District 7 | Culvert Repair - S-105 | 3 of 4 | $811,593 | +60% |
| 11 JAN 2022 | 1755080 | District 5 | Safety Improvements - S-55 (Dillon Co) | 1 of 3 | $258,408 | Low, 14% under the second |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.