SCDOT contract 1272231 bid tabulation
SYSTEM UPGRADE: SC 901 (Edgeland Road). Let by South Carolina DOT on October 14, 2025, Chester, District 4. 7 bids received; low bid $4,369,932 by Eagle Construction Company.
- Owner
- South Carolina DOT
- Letting
- 14 OCT 2025
- Pay items
- 84
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Eagle Construction Company | $4,369,932 | Low |
| 2 | Lci-Lineberger Construction, Inc. | $4,515,662 | +3.0% |
| 3 | Cherokee, Inc. | $4,870,588 | +11% |
| 4 | King Asphalt, Inc. | $5,188,376 | +19% |
| 5 | Universal Civil Construction, LLC | $5,192,320 | +19% |
| 6 | Aos Specialty Contractors, Inc. | $5,462,558 | +25% |
| 7 | Palmetto Corp. of Conway | $7,457,259 | +71% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eagle Construction Company | 2. Lci-Lineberger Construction, Inc. | 3. Cherokee, Inc. | 4. King Asphalt, Inc. | 5. Universal Civil Construction, LLC | 6. Aos Specialty Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $200,000 | $75,000 | $244,000 | $257,000 | $259,000 | $356,250 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $53,000 | $45,750 | $97,500 | $154,000 | $155,000 | $82,820 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $59,000 | $64,750 | $50,000 | $60,000 | $55,000 | $36,260 |
| 0040 | Utility staking (1052001) | LS | 1 | $9,500.00 | $7,350.00 | $10,000 | $7,000.00 | $7,500.00 | $35,000 |
| 0050 | Small public water relocation no. ____ 001 (1052100) | EACH | 1 | $468,160 | $536,000 | $529,222 | $322,150 | $470,000 | $592,351 |
| 0060 | Small public sewer relocation no. ____ 01 (1052200) | EACH | 1 | $273,122 | $315,000 | $300,500 | $199,000 | $292,000 | $345,595 |
| 0070 | CPM progress schedule (1080300) | LS | 1 | $3,500.00 | $6,500.00 | $10,000 | $7,000.00 | $9,000.00 | $25,000 |
| 0080 | Clearing & grubbing within right of way (2011000) | LS | 1 | $70,300 | $65,000 | $250,000 | $45,650 | $80,000 | $129,500 |
| 0090 | Removal & disposal of existing asphalt pavement (2025000) | SY | 730 | $11.00 | $25.00 | $25.00 | $50.00 | $10.50 | $38.50 |
| 0100 | Unclassified excavation (2031000) | CY | 5,290 | $20.00 | $40.38 | $30.00 | $30.00 | $31.50 | $47.00 |
| 0110 | Borrow excavation (2033000) | CY | 2,655 | $36.25 | $32.00 | $30.00 | $45.00 | $43.00 | $39.00 |
| 0120 | Geogrid stabilization (2037030) | SY | 55 | $20.00 | $50.00 | $10.00 | $50.00 | $12.00 | $50.00 |
| 0130 | Fine grading (2081001) | SY | 6,466 | $1.00 | $4.00 | $6.00 | $31.00 | $7.00 | $9.00 |
| 0140 | Maintenance stone (3059900) | TON | 150 | $51.50 | $65.00 | $65.00 | $110.00 | $75.00 | $100.00 |
| 0150 | Liquid asphalt binder PG64-22 (4011004) | TON | 420 | $705.00 | $685.00 | $765.00 | $678.00 | $775.00 | $865.00 |
| 0160 | Full depth asph. pav. patching 8" unif (4012080) | SY | 1,000 | $85.00 | $95.00 | $90.00 | $76.00 | $89.00 | $100.00 |
| 0170 | Milling existing asphalt pavement (variable) (4013990) | SY | 121 | $80.00 | $28.50 | $83.00 | $68.00 | $81.25 | $90.00 |
| 0180 | Asphalt base course - type B (4020320) | TON | 3,691 | $91.00 | $94.21 | $96.00 | $85.00 | $97.00 | $108.00 |
| 0190 | Asphalt intermediate course type C (4030330) | TON | 3,226 | $109.00 | $107.36 | $116.00 | $105.00 | $125.00 | $130.00 |
| 0200 | Asphalt surface course type C (4040340) | TON | 1,325 | $95.00 | $96.31 | $100.00 | $87.00 | $101.25 | $115.00 |
| 0210 | Asphalt surface course type E (4040360) | TON | 131 | $150.00 | $132.32 | $157.00 | $134.00 | $158.00 | $175.00 |
| 0220 | Traffic control (6011000) | LS | 1 | $154,000 | $25,000 | $225,000 | $593,000 | $323,000 | $87,575 |
| 0230 | Barricade - type III (6041200) | LF | 168 | $35.00 | $23.80 | $23.10 | $24.00 | $27.00 | $26.00 |
| 0240 | Permanent construction signs (ground mounted) (6051120) | SF | 340 | $9.00 | $8.39 | $8.15 | $8.00 | $10.50 | $10.00 |
| 0250 | Permanent construction signs (barricade mounted) (6051125) | SF | 360 | $9.00 | $8.39 | $8.15 | $8.00 | $7.75 | $10.00 |
| 0260 | Construction zone electric changeable message sign (trailer (6062000) | EACH | 2 | $5,000.00 | $45,000 | $5,000.00 | $20,300 | $9,000.00 | $13,500 |
| 0270 | Type B - flashing light (608100B) | EACH | 16 | $160.00 | $141.69 | $138.00 | $140.00 | $86.50 | $155.00 |
| 0280 | Pavement markings(temporary-paint)-4" white solid lines (609115A) | LF | 12,700 | $0.15 | $0.11 | $0.11 | $0.10 | $0.10 | $0.15 |
| 0290 | Pavement markings(temporary-paint)-4" yellow solid lines (609115B) | LF | 12,700 | $0.15 | $0.11 | $0.11 | $0.10 | $0.10 | $0.15 |
| 0300 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 40 | $8.50 | $8.50 | $8.25 | $7.50 | $7.75 | $9.30 |
| 0310 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 865 | $1.75 | $1.70 | $1.65 | $1.50 | $1.55 | $2.00 |
| 0320 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 200 | $0.90 | $0.83 | $0.80 | $0.75 | $0.75 | $1.00 |
| 0330 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 6,800 | $0.60 | $0.54 | $0.52 | $0.50 | $0.50 | $0.65 |
| 0340 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 200 | $3.25 | $3.12 | $3.00 | $2.75 | $2.85 | $3.50 |
| 0350 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 75 | $10.00 | $9.63 | $10.00 | $10.00 | $8.75 | $11.00 |
| 0360 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 2 | $125.00 | $113.36 | $110.00 | $100.00 | $103.25 | $125.00 |
| 0370 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 2 | $125.00 | $113.36 | $110.00 | $100.00 | $103.25 | $125.00 |
| 0380 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 1,000 | $0.60 | $0.54 | $0.55 | $0.50 | $0.50 | $0.65 |
| 0390 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 9,000 | $0.60 | $0.54 | $0.52 | $0.50 | $0.50 | $0.65 |
| 0400 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 100 | $7.75 | $7.37 | $7.15 | $6.50 | $6.70 | $10.00 |
| 0410 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 160 | $7.75 | $7.37 | $7.15 | $6.50 | $6.70 | $10.00 |
| 0420 | 18" smooth wall pipe (7143618) | LF | 4,836 | $79.00 | $144.00 | $80.00 | $110.00 | $110.00 | $101.00 |
| 0430 | 24" smooth wall pipe (7143624) | LF | 232 | $108.00 | $170.00 | $110.00 | $205.00 | $142.00 | $150.00 |
| 0440 | 30" smooth wall pipe (7143630) | LF | 72 | $155.00 | $275.00 | $225.00 | $235.00 | $183.00 | $242.00 |
| 0450 | Catch basin -type 16 (7191605) | EACH | 7 | $7,000.00 | $6,250.00 | $7,000.00 | $10,500 | $7,800.00 | $10,450 |
| 0460 | Catch basin -type 17 (7191625) | EACH | 14 | $8,000.00 | $6,655.00 | $8,500.00 | $12,500 | $10,250 | $13,675 |
| 0470 | Catch basin -type 18 (7191650) | EACH | 4 | $9,500.00 | $7,600.00 | $10,000 | $14,000 | $12,225 | $18,800 |
| 0480 | Drop inlet (24" X 36") (7192020) | EACH | 10 | $4,300.00 | $5,050.00 | $3,000.00 | $7,650.00 | $4,925.00 | $7,255.00 |
| 0490 | Manhole (7192105) | EACH | 4 | $4,300.00 | $5,655.00 | $4,500.00 | $10,000 | $5,100.00 | $8,750.00 |
| 0500 | Junction box (special) 003 (719228Z) | EACH | 1 | $8,500.00 | $7,325.00 | $5,000.00 | $10,000 | $7,400.00 | $8,100.00 |
| 0510 | Beveling of pipe end (7199100) | EACH | 2 | $650.00 | $1,350.00 | $400.00 | $500.00 | $225.00 | $835.00 |
| 0520 | Concrete curb (9" X 15") (7201000) | LF | 865 | $50.00 | $28.06 | $45.40 | $41.00 | $50.50 | $30.00 |
| 0530 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 6,520 | $39.50 | $30.76 | $34.50 | $31.25 | $39.00 | $33.00 |
| 0540 | Concrete curb and gutter (2'-0") ogee (7203230) | LF | 225 | $42.00 | $30.00 | $52.00 | $47.00 | $57.25 | $33.50 |
| 0550 | Concrete sidewalk(4" uniform) (7204100) | SY | 2,267 | $96.00 | $66.89 | $76.60 | $70.00 | $92.50 | $81.00 |
| 0560 | Detectable warning material (7204900) | SF | 150 | $175.00 | $18.36 | $59.00 | $55.00 | $63.50 | $50.00 |
| 0570 | Concrete driveway(6" uniform) (7205000) | SY | 635 | $130.00 | $83.66 | $143.00 | $130.00 | $162.00 | $120.00 |
| 0580 | Pedestrian ramp construction (7209000) | SY | 300 | $325.00 | $85.63 | $196.00 | $178.00 | $205.50 | $142.00 |
| 0590 | Planted median subsurface drainage (8020100) | SY | 608 | $57.50 | $105.00 | $85.00 | $150.00 | $155.00 | $138.00 |
| 0600 | Rip-rap (class A) (8041010) | TON | 26.50 | $66.00 | $125.00 | $100.00 | $120.00 | $113.00 | $125.00 |
| 0610 | Rip-rap (class B) (8041020) | TON | 47 | $69.50 | $125.00 | $100.00 | $136.00 | $113.00 | $125.00 |
| 0620 | Geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 113 | $6.00 | $10.00 | $10.00 | $40.00 | $5.00 | $9.30 |
| 0630 | Moving item no. 002 (8081000) | LS | 1 | $1,300.00 | $3,000.00 | $800.00 | $6,500.00 | $1,750.00 | $375.00 |
| 0640 | Right of way marker(rebar and cap) (8091010) | EACH | 56 | $170.00 | $175.00 | $200.00 | $175.00 | $230.00 | $310.00 |
| 0650 | Right of way plat (8091050) | LS | 1 | $3,000.00 | $1,850.00 | $7,000.00 | $1,850.00 | $5,400.00 | $3,100.00 |
| 0660 | Permanent cover (8100100) | ACRE | 2.18 | $1,850.00 | $1,600.00 | $2,500.00 | $1,850.00 | $1,900.00 | $4,000.00 |
| 0670 | Temporary cover (8100200) | ACRE | 1.09 | $1,650.00 | $875.00 | $1,500.00 | $1,250.00 | $1,650.00 | $3,000.00 |
| 0680 | Fertilizer (nitrogen) (8104005) | LB | 218 | $9.50 | $2.06 | $2.20 | $2.00 | $2.75 | $2.00 |
| 0690 | Fertilizer (phosphoric acid) (8104010) | LB | 218 | $9.50 | $2.06 | $2.20 | $2.00 | $2.75 | $2.00 |
| 0700 | Fertilizer (potash) (8104015) | LB | 218 | $9.50 | $2.06 | $2.20 | $2.00 | $2.75 | $2.00 |
| 0710 | Agricultural granular lime (8105005) | LB | 4,360 | $0.70 | $0.28 | $1.10 | $1.00 | $0.40 | $0.50 |
| 0720 | Selective watering (8109050) | GAL | 54,300 | $0.10 | $0.10 | $0.10 | $0.01 | $0.03 | $0.10 |
| 0730 | Mowing (8109901) | ACRE | 6.54 | $570.00 | $338.00 | $450.00 | $500.00 | $450.00 | $7.50 |
| 0740 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 4.36 | $3,500.00 | $6,100.00 | $3,630.00 | $3,250.00 | $3,675.00 | $4,650.00 |
| 0750 | Inlet structure filter - type F (weighted) (8152004) | LF | 350 | $18.00 | $16.50 | $15.00 | $9.50 | $18.00 | $16.50 |
| 0760 | Inlet structure filter- type F (non-weighted) (8152006) | LF | 350 | $17.00 | $14.00 | $12.00 | $9.50 | $5.00 | $14.00 |
| 0770 | Silt fence (8153000) | LF | 5,636 | $4.00 | $5.89 | $5.00 | $3.00 | $4.00 | $5.00 |
| 0780 | Replace/repair silt fence (8153090) | LF | 563 | $6.00 | $3.43 | $5.00 | $3.00 | $4.50 | $5.00 |
| 0790 | Removal of silt retained by silt fence (8154050) | LF | 1,409 | $5.00 | $2.50 | $5.00 | $3.00 | $4.25 | $5.00 |
| 0800 | Inlet filter cleaning (8154155) | EACH | 35 | $125.00 | $175.00 | $150.00 | $125.00 | $215.00 | $300.00 |
| 0810 | Inlet structure filter - type B (8156210) | EACH | 4 | $525.00 | $350.00 | $350.00 | $450.00 | $250.00 | $625.00 |
| 0820 | Inlet structure filter - type A (8156219) | LF | 100 | $32.00 | $15.00 | $250.00 | $15.00 | $6.70 | $60.00 |
| 0830 | Aggregate no.5 or 57 for erosion control (8156410) | TON | 2.25 | $250.00 | $995.00 | $200.00 | $96.00 | $77.00 | $90.00 |
| 0840 | Stabilized construction entrance (8156490) | SY | 550 | $26.75 | $25.00 | $22.00 | $28.00 | $19.00 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of October 14, 2025. Compiled by Mirage Metrics.