Site-Prep, Inc. of NC: SCDOT bid record
Site-Prep, Inc. of NC submitted 17 bids on South Carolina DOT contracts in the data, from 11 FEB 2025 to 09 SEP 2026, and was the low bidder on 6 of them (35%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $5,343,494
- Latest bid
- 09 SEP 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 8 | 3 | 38% |
| 2026 | 9 | 3 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 8 | 4 | 50% |
| District 7 | 6 | 1 | 17% |
| District 6 | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction stakes, lines & grades | 1050800 | EACH | 16 | 10 (63%) | $10,670 | $30,000 |
| Permanent construction signs (ground mounted) | 6051120 | SF | 14 | 10 (71%) | $6.45 | $7.00 |
| Flowable fill | 2103000 | CY | 9 | 7 (78%) | $221.00 | $392.00 |
| Removal of silt retained by silt fence | 8154050 | LF | 11 | 6 (55%) | $2.10 | $4.75 |
| Silt fence | 8153000 | LF | 15 | 5 (33%) | $3.55 | $4.00 |
| Unclassified excavation | 2031000 | CY | 14 | 5 (36%) | $32.18 | $42.80 |
| Maintenance stone | 3059900 | TON | 13 | 5 (38%) | $76.79 | $92.63 |
| Inlet structure filter - type F (weighted) | 8152004 | LF | 11 | 5 (45%) | $13.56 | $15.00 |
| Liquid asphalt binder PG64-22 | 4011004 | TON | 13 | 4 (31%) | $803.00 | $715.00 |
| Sediment tubes for ditch checks | 8152007 | LF | 12 | 4 (33%) | $12.18 | $12.45 |
| Flat sheet, type III, fixed SZ. & MSG. sign | 6510105 | SF | 10 | 4 (40%) | $16.52 | $27.48 |
| 8" white solid lines thermoplastic - 125 mil. | 6271015 | LF | 9 | 4 (44%) | $3.30 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Aos Specialty Contractors, Inc. | 15 | 2 of 15 |
| Palmetto Sitework Services, LLC | 12 | 5 of 12 |
| Palmetto Corp. of Conway | 11 | 1 of 11 |
| Cherokee, Inc. | 7 | 1 of 7 |
| Eagle Construction Company | 6 | 2 of 6 |
| L-J, Inc. | 6 | 0 of 6 |
| Coogler Construction, Inc. | 4 | 2 of 4 |
| J.D. Gaskins Construction Inc. | 3 | 1 of 3 |
| Universal Civil Construction, LLC | 2 | 0 of 2 |
| McClam & Associates, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 09 SEP 2026 | 0772100 | District 6 | Intersection Improvement SC 116 @ S-597 | 2 of 3 | $3,321,317 | +6.0% |
| 09 SEP 2026 | 0965790 | District 7 | Safety Improvement - US 21/ SC 172/ SC 6 (Calhoun Co) | 4 of 8 | $2,898,472 | +12% |
| 11 AUG 2026 | 3276951 | District 1 | Replace the existing culvert along S-59 (Devils Backbone Rd | 1 of 11 | $1,288,582 | Low, 10% under the second |
| 12 MAY 2026 | 0274010 | District 7 | Emergency Culvert Replacement – Altees Corbett Rd. (S-2-111) in Aiken County | 1 of 9 | $785,968 | Low, 3.0% under the second |
| 12 MAY 2026 | 0876380 | District 6 | Sidewalk Improvements in Moncks Corner | 2 of 5 | $1,328,088 | +2.0% |
| 12 MAY 2026 | 4059900 | District 1 | Safety Improvement - SC 764 (Richland Co) | 1 of 7 | $294,336 | Low, 25% under the second |
| 12 MAY 2026 | 4373182 | District 1 | Intersection Improvement-US 378 and S-490 in Sumter County | 2 of 3 | $1,640,685 | +18% |
| 14 APR 2026 | 3872110 | District 7 | Orangeburg SC 389 @ SC 394 Int. Improvement | 2 of 6 | $2,065,366 | +1.0% |
| 13 JAN 2026 | 0657500 | District 7 | Bike/Ped Enhancements along SC 3 (Marlboro Ave.) | 2 of 4 | $5,699,771 | +4.0% |
| 09 DEC 2025 | 3265530 | District 1 | Roundabout at SC 6 and S-65 | 3 of 8 | $2,889,820 | +9.0% |
| 12 NOV 2025 | 4068500 | District 1 | Rosedale Arch Sidewalk Project | 5 of 9 | $411,628 | +50% |
| 09 SEP 2025 | 3265540 | District 1 | Roundabout at S-279 and S-627 | 1 of 7 | $2,494,412 | Low, 10% under the second |
| 09 SEP 2025 | 4068720 | District 1 | N. Main St Sidewalk | 1 of 6 | $167,797 | Low, 10% under the second |
| 12 AUG 2025 | 3259590 | District 1 | Enhancement - Lexington Co | 3 of 6 | $1,190,774 | +13% |
| 12 AUG 2025 | 3856130 | District 7 | Improve Corridor along SC 4 (Stonewall Jackson St) | 2 of 5 | $2,196,706 | +7.0% |
| 11 FEB 2025 | 0771420 | District 6 | Old Shell Road Sidewalk Improvements | 1 of 1 | $312,400 | Low |
| 11 FEB 2025 | 1470210 | District 7 | Improvements on S-14-23 Old Georgetown Rd. and S-14-516 | 3 of 4 | $1,056,865 | +22% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.