SCDOT contract 4070850 bid tabulation
S-40-64 Arcadia Lakes Drive over Coopers Pond. Let by South Carolina DOT on January 13, 2026, Richland, District 1. 7 bids received; low bid $2,603,441 by Coogler Construction, Inc..
- Owner
- South Carolina DOT
- Letting
- 13 JAN 2026
- Pay items
- 55
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Coogler Construction, Inc. | $2,603,441 | Low |
| 2 | Cherokee, Inc. | $2,657,015 | +2.0% |
| 3 | Aos Specialty Contractors, Inc. | $2,673,165 | +3.0% |
| 4 | McClam & Associates, Inc. | $2,773,021 | +7.0% |
| 5 | Corley Construction Company, LLC | $4,634,001 | +78% |
| 6 | Eagle Construction Company | $4,637,948 | +78% |
| 7 | Mastec Civil, LLC | $5,408,808 | +108% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Coogler Construction, Inc. | 2. Cherokee, Inc. | 3. Aos Specialty Contractors, Inc. | 4. McClam & Associates, Inc. | 5. Corley Construction Company, LLC | 6. Eagle Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $50,000 | $137,500 | $109,116 | $122,004 | $250,000 | $155,000 |
| 0020 | Mobilization - subcontractor (1031100) | LS | 1 | $45,963 | $20,000 | $20,980 | $90,016 | $25,000 | $185,000 |
| 0030 | Bonds and insurance (1032010) | LS | 1 | $29,058 | $55,000 | $28,000 | $71,160 | $83,000 | $37,000 |
| 0040 | Construction stakes, lines & grades (1050800) | EACH | 1 | $9,000.00 | $20,000 | $37,556 | $100,955 | $15,900 | $47,000 |
| 0050 | Large public water relocation no. ____ 01 (1052110) | EACH | 1 | $289,583 | $215,000 | $232,863 | $303,873 | $297,380 | $193,075 |
| 0060 | CPM progress schedule (1080300) | LS | 1 | $20,000 | $9,000.00 | $25,002 | $16,000 | $8,200.00 | $3,000.00 |
| 0070 | Clearing & grubbing within right of way (2011000) | LS | 1 | $45,000 | $150,000 | $67,604 | $129,196 | $25,000 | $103,000 |
| 0080 | Removal of structures & obstructions (2021000) | LS | 1 | $25,000 | $15,000 | $5,370.00 | $7,500.00 | $12,400 | $180,000 |
| 0090 | Removal & disposal of existing asphalt pavement (2025000) | SY | 1,104 | $20.00 | $15.00 | $9.00 | $15.00 | $14.00 | $11.00 |
| 0100 | Removal of exist. guardrail (2027801) | LF | 982 | $5.00 | $2.00 | $3.00 | $2.50 | $7.00 | $3.00 |
| 0110 | Unclassified excavation (2031000) | CY | 11,610 | $36.40 | $22.40 | $37.00 | $17.05 | $65.00 | $28.00 |
| 0120 | Borrow excavation (2033000) | CY | 12,160 | $25.00 | $35.00 | $42.50 | $30.33 | $90.00 | $67.20 |
| 0130 | Geotextile, separation (2036020) | SY | 2,995 | $8.50 | $5.00 | $5.00 | $6.42 | $14.00 | $10.00 |
| 0131 | Geogrid reinforcement (uniaxial) (2037000) | SY | 1,300 | $4.50 | $6.00 | $8.00 | $6.88 | $18.00 | $12.50 |
| 0140 | Cofferdam (2045000) | EACH | 1 | $130,000 | $50,000 | $119,624 | $35,000 | $83,000 | $540,000 |
| 0150 | Temporary shoring system (2047000) | LF | 300 | $200.00 | $700.00 | $590.00 | $1,079.00 | $520.00 | $1,600.00 |
| 0160 | Fine grading (2081001) | SY | 1,582 | $10.50 | $10.00 | $27.00 | $9.00 | $32.00 | $3.00 |
| 0170 | Dewatering system no. 01 (2991000) | LS | 1 | $180,000 | $225,000 | $49,958 | $106,068 | $330,600 | $350,000 |
| 0180 | Liquid asphalt binder PG64-22 (4011004) | TON | 33 | $803.00 | $605.00 | $885.00 | $730.00 | $787.00 | $830.00 |
| 0190 | Milling existing asphalt pavement (variable) (4013990) | SY | 250 | $20.00 | $30.00 | $34.00 | $62.00 | $33.00 | $80.00 |
| 0200 | Asphalt base course - type B (4020320) | TON | 367 | $154.00 | $182.00 | $108.00 | $140.00 | $236.00 | $160.00 |
| 0210 | Asphalt intermediate course type B (4030320) | TON | 103 | $264.00 | $182.00 | $108.00 | $240.00 | $236.00 | $290.00 |
| 0220 | Asphalt surface course type C (4040340) | TON | 165 | $209.00 | $182.00 | $108.00 | $190.00 | $238.00 | $225.00 |
| 0230 | Asphalt surface course type E (4040360) | TON | 6 | $2,750.00 | $275.00 | $108.00 | $2,500.00 | $728.00 | $4,000.00 |
| 0240 | Traffic control (6011000) | LS | 1 | $11,000 | $20,000 | $22,535 | $166,372 | $48,000 | $81,000 |
| 0250 | Permanent construction signs (ground mounted) (6051120) | SF | 17 | $10.00 | $10.00 | $194.00 | $15.00 | $80.00 | $35.00 |
| 0260 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 1,432 | $0.66 | $0.30 | $0.30 | $0.25 | $1.50 | $0.40 |
| 0270 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 1,432 | $0.66 | $0.30 | $0.30 | $0.25 | $1.50 | $0.40 |
| 0280 | U-section post for sign supports - 3P (6531210) | LF | 10 | $10.80 | $25.00 | $112.00 | $15.00 | $80.00 | $50.00 |
| 0290 | Removal of U-section post (6531410) | EACH | 2 | $5.00 | $60.00 | $300.00 | $150.00 | $400.00 | $50.00 |
| 0300 | Conc. for structures - class 4000 (7011400) | CY | 93.10 | $3,157.50 | $2,200.00 | $2,475.00 | $1,037.00 | $2,500.00 | $4,000.00 |
| 0310 | Reinf. steel for structures (roadway) (7031100) | LB | 15,710 | $0.64 | $2.00 | $3.40 | $2.15 | $20.00 | $4.00 |
| 0320 | 18" smooth wall pipe (7143618) | LF | 40 | $122.00 | $100.00 | $246.00 | $99.04 | $280.00 | $200.00 |
| 0330 | Rip-rap (class B) (8041020) | TON | 2,750 | $95.00 | $95.00 | $75.00 | $88.15 | $125.00 | $91.00 |
| 0340 | Geotextile for erosion control under riprap(class 2)type A (8048200) | SY | 1,600 | $4.50 | $5.00 | $5.50 | $5.72 | $8.50 | $3.50 |
| 0350 | MT2 leading end treatment TL2 (8051155) | EACH | 4 | $3,470.39 | $3,000.00 | $2,898.00 | $2,700.00 | $4,733.00 | $3,800.00 |
| 0360 | MGS3CS GR compressed shoulder (8052150) | LF | 887.50 | $36.10 | $35.20 | $34.00 | $32.00 | $48.00 | $38.00 |
| 0370 | Non-mow strip under guardrail (8055250) | SY | 207 | $80.00 | $105.00 | $124.00 | $105.00 | $180.00 | $150.00 |
| 0380 | 96" security chain link fence (8063620) | LF | 483 | $40.00 | $35.00 | $33.50 | $31.00 | $75.00 | $85.00 |
| 0390 | Right of way marker(rebar and cap) (8091010) | EACH | 8 | $250.00 | $220.00 | $161.00 | $425.00 | $253.00 | $200.00 |
| 0400 | Right of way plat (8091050) | LS | 1 | $5,500.00 | $3,500.00 | $8,048.00 | $8,500.00 | $4,800.00 | $4,000.00 |
| 0410 | Permanent cover (8100100) | ACRE | 0.98 | $3,500.00 | $2,000.00 | $3,756.00 | $1,723.77 | $4,300.00 | $2,000.00 |
| 0420 | Temporary cover (8100200) | ACRE | 0.49 | $3,500.00 | $2,650.00 | $3,193.00 | $1,088.18 | $5,000.00 | $3,500.00 |
| 0430 | Straw or hay mulch with tackifier (8101110) | ACRE | 1.12 | $2,000.00 | $1,750.00 | $2,676.00 | $2,438.32 | $4,030.00 | $3,200.00 |
| 0440 | Fertilizer (nitrogen) (8104005) | LB | 98 | $24.00 | $5.50 | $5.40 | $1.93 | $8.00 | $5.00 |
| 0450 | Fertilizer (phosphoric acid) (8104010) | LB | 98 | $24.00 | $5.50 | $5.40 | $1.93 | $8.00 | $5.00 |
| 0460 | Fertilizer (potash) (8104015) | LB | 98 | $24.00 | $5.50 | $5.40 | $1.93 | $8.00 | $5.00 |
| 0470 | Agricultural granular lime (8105005) | LB | 1,960 | $1.50 | $0.50 | $0.50 | $0.93 | $2.00 | $1.00 |
| 0480 | Selective watering (8109050) | GAL | 54,300 | $0.25 | $0.09 | $0.10 | $0.01 | $0.02 | $0.05 |
| 0490 | Mowing (8109901) | ACRE | 2.40 | $1,500.00 | $400.00 | $531.00 | $468.05 | $450.00 | $650.00 |
| 0500 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 0.30 | $4,500.00 | $5,000.00 | $4,024.00 | $4,203.54 | $5,000.00 | $5,500.00 |
| 0510 | Silt fence (8153000) | LF | 2,290 | $9.50 | $6.00 | $3.25 | $4.26 | $7.00 | $4.75 |
| 0520 | Replace/repair silt fence (8153090) | LF | 573 | $4.75 | $5.00 | $6.00 | $4.48 | $9.00 | $7.00 |
| 0530 | Removal of silt retained by silt fence (8154050) | LF | 229 | $4.00 | $5.00 | $7.50 | $6.00 | $24.00 | $10.00 |
| 0540 | Stabilized construction entrance (8156490) | SY | 550 | $20.00 | $22.00 | $8.00 | $21.63 | $20.00 | $30.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of January 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.