Banks Construction Company: SCDOT bid record
Banks Construction Company submitted 47 bids on South Carolina DOT contracts in the data, from 08 FEB 2022 to 13 OCT 2026, and was the low bidder on 28 of them (60%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $548,924,624
- Latest bid
- 13 OCT 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 11 | 7 | 64% |
| 2023 | 5 | 2 | 40% |
| 2024 | 13 | 9 | 69% |
| 2025 | 11 | 6 | 55% |
| 2026 | 7 | 4 | 57% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 6 | 46 | 28 | 61% |
| District 7 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquid asphalt binder PG64-22 | 4011004 | TON | 46 | 38 (83%) | $650.00 | $715.00 |
| Permanent yellow pavement markers BI-dir.- 4"X4" | 6301100 | EACH | 37 | 32 (86%) | $6.00 | $6.50 |
| Milling existing asphalt pavement (variable) | 4013990 | SY | 39 | 26 (67%) | $8.00 | $11.30 |
| Borrow excavation | 2033000 | CY | 41 | 24 (59%) | $58.00 | $49.70 |
| Permanent clear pavement markers- mono-dir.- 4"X4" | 6300005 | EACH | 29 | 23 (79%) | $6.50 | $6.00 |
| Unclassified excavation | 2031000 | CY | 35 | 20 (57%) | $50.00 | $42.80 |
| Permanent grassing for non-permitted resurfacing projects | 8100102 | ACRE | 33 | 19 (58%) | $3,365.00 | $3,360.00 |
| Removal & disposal of existing pavement | 2023000 | SY | 31 | 19 (61%) | $30.00 | $35.00 |
| Furnish & install 1.0" schedule 80 PVC conduit | 6750275 | LF | 23 | 18 (78%) | $12.86 | $17.50 |
| 4" white solid lines (PVT. edge lines)-fast dry paint | 6250010 | LF | 22 | 18 (82%) | $0.15 | $0.13 |
| Sawcut for loop detector | 6780495 | LF | 22 | 18 (82%) | $8.05 | $9.04 |
| 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint | 6250110 | LF | 22 | 17 (77%) | $0.15 | $0.13 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Sanders Brothers Construction Company, | 35 | 15 of 35 |
| Blythe Construction, Inc. | 5 | 1 of 5 |
| Palmetto Sitework Services, LLC | 4 | 2 of 4 |
| C.R. Jackson, Inc. | 4 | 0 of 4 |
| Palmetto Corp. of Conway | 3 | 0 of 3 |
| Kiewit Infrastructure South Co. | 2 | 0 of 2 |
| Coastal Asphalt, LLC | 2 | 1 of 2 |
| Blythe Development, LLC | 2 | 1 of 2 |
| L. Dean Weaver Company LLC | 2 | 1 of 2 |
| Superior Construction Company | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 OCT 2026 | 1075380 | District 6 | US 17 at Buck Hall Landing Road (Right Turn Lane) | 7 of 7 | $694,604 | +90% |
| 09 SEP 2026 | 1877890 | District 6 | FDP, mill, STB, Intm B Spec, CMRB | 1 of 3 | $9,564,781 | Low, 0.0% under the second |
| 11 AUG 2026 | 8876600 | District 7 | SC (Old Number Six Hwy) Road Departure Mitigation | 3 of 5 | $2,420,941 | +8.0% |
| 12 MAY 2026 | 1876500 | District 6 | SC 165 Rural Road Safety Improvements | 1 of 2 | $6,529,456 | Low, 47% under the second |
| 10 MAR 2026 | 1076430 | District 6 | 2026 Charleston Pavement Improvement | 1 of 2 | $11,960,981 | Low, 13% under the second |
| 13 JAN 2026 | 0874120 | District 6 | S-250(Howe/Hall Road) MP 0.09 - 1.10 Berkeley County RDSM | 1 of 2 | $865,096 | Low, 4.0% under the second |
| 13 JAN 2026 | 0875310 | District 6 | 2026 Berkeley Pavement Improvement | 2 of 2 | $13,629,725 | +5.0% |
| 09 DEC 2025 | 0864370 | District 6 | Safety Improvements - SC 6 | 2 of 3 | $12,400,157 | +26% |
| 12 NOV 2025 | 1574620 | District 6 | 2026 Colleton Pavement Improvement | 1 of 3 | $13,069,560 | Low, 7.0% under the second |
| 09 SEP 2025 | 1874000 | District 6 | 2026 Dorchester Rehab-Recon - CTC | 2 of 3 | $10,416,278 | +5.0% |
| 12 AUG 2025 | 1572770 | District 6 | SC 303 Rural Road Safety Improvements | 1 of 4 | $7,344,562 | Low, 12% under the second |
| 10 JUN 2025 | 0872800 | District 6 | US 17A Rural Road Safety Improvements Berkeley County | 2 of 2 | $6,126,291 | +9.0% |
| 10 JUN 2025 | 1071190 | District 6 | US 17 Rural Roads Safety Project Charleston County | 1 of 2 | $5,920,747 | Low, 12% under the second |
| 10 JUN 2025 | 1872790 | District 6 | SC 61 Rural Road Safety Improvements Dorchester County | 1 of 2 | $5,038,595 | Low, 30% under the second |
| 10 JUN 2025 | 8871200 | District 6 | US 17 Alt. Rural Roads Safety Project Berkeley County | 2 of 3 | $6,346,001 | +10% |
| 13 MAY 2025 | 0873130 | District 6 | US-176 (State Rd.) / S-467 (Black Tom Rd.) | 1 of 2 | $4,122,783 | Low, 25% under the second |
| 11 MAR 2025 | 1070570 | District 6 | 2025 Charleston Reconstruction-Rehab | 1 of 2 | $17,592,575 | Low, 10% under the second |
| 14 JAN 2025 | 0869500 | District 6 | 2025 Primary Pavement Improvement Program - Non NHS | 2 of 2 | $15,553,931 | +11% |
| 10 DEC 2024 | 1570900 | District 6 | SC 61 Safety Improvements in Colleton County | 1 of 2 | $13,610,958 | Low, 96% under the second |
| 13 NOV 2024 | 1869900 | District 6 | 2025 Primary Pavement Improvement Program - NHS | 2 of 2 | $11,642,887 | +7.0% |
| 10 SEP 2024 | 1569780 | District 6 | 2025 Primary Pavement Improvement Program -NHS | 1 of 3 | $13,479,315 | Low, 17% under the second |
| 10 SEP 2024 | 5662380 | District 6 | Safety Improvements - RSA S-75 (Ashley Phosphate Rd) | 1 of 2 | $10,092,950 | Low, 47% under the second |
| 13 AUG 2024 | 0852230 | District 6 | Safety/Intersection Improvements - Berkeley Co | 2 of 2 | $8,190,397 | +15% |
| 13 AUG 2024 | 1566321 | District 6 | 2024 Colleton County Paving Program | 1 of 2 | $15,846,282 | Low, 7.0% under the second |
| 09 JUL 2024 | 0868960 | District 6 | Safety Improvements S-250 and S-413 | 1 of 2 | $1,019,629 | Low, 9.0% under the second |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.