SCDOT contract 1876500 bid tabulation

SC 165 Rural Road Safety Improvements. Let by South Carolina DOT on May 12, 2026, Dorchester, District 6. 2 bids received; low bid $6,529,456 by Banks Construction Company.

Owner
South Carolina DOT
Letting
12 MAY 2026
Pay items
76
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Banks Construction Company$6,529,456Low
2Sanders Brothers Construction Company,$9,606,850+47%
SCDOT contract 1876500: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Banks Construction Company2. Sanders Brothers Construction Company,
0010Mobilization (1031000)LS1$320,000$500,000
0020Bonds and insurance (1032010)LS1$120,000$150,000
0030Construction stakes, lines & grades (1050800)EACH1$275,000$200,000
0040CPM progress schedule (1080300)LS1$25,000$20,000
0050Clearing & grubbing within roadway (2012000)LS1$390,000$500,000
0060Removal & disposal item no. 01 (2022000)LS1$2,100.00$10,000
0070Removal & disposal item no. 02 (2022000)LS1$2,100.00$10,000
0080Removal & disposal of existing asphalt pavement (2025000)SY1,345$14.00$25.00
0090Unclassified excavation (2031000)CY12,600$16.00$51.00
0100Borrow excavation (2033000)CY26,100$25.00$72.00
0110Muck excavation (2034000)CY3,512$20.00$65.00
0120Excavation for shoulder paving (2036000)STA220$220.00$450.00
0130Hauling of excavated shoulder material (2072000)STA220$125.00$125.00
0140Flowable fill (2103000)CY207$280.00$450.00
0150Maintenance stone (3059900)TON30$110.00$325.00
0160HMA shoulder widening course (3104000)TON6,260$100.00$100.00
0170Liquid asphalt binder PG64-22 (4011004)TON839$780.00$890.00
0180Full depth asph. pav. patching 8" unif (4012080)SY1,570$80.00$90.00
0190Milling existing asphalt pavement (variable) (4013990)SY300$14.00$20.00
0200Asphalt base course - type B (4020320)TON580$230.00$300.00
0210Asphalt surface course type B (4040320)TON9,160$110.00$102.50
0220Driveway paving-surface type D (4047230)TON400$230.00$375.00
0230Traffic control (6011000)LS1$673,300$1,425,000
0240Permanent construction signs (ground mounted) (6051120)SF152$6.40$7.35
02504" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF95,400$0.12$0.11
026024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF142.20$2.22$2.00
02704" yellow broken lines(gaps exc) - fast dry paint (6240105)LF10,443$0.13$0.12
02804"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF41,694$0.12$0.11
02906" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012)LF51,400$1.00$0.89
030024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF47.40$27.80$25.00
03106" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271066)LF3,481$1.00$0.92
03206" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271076)LF19,550$0.99$0.89
0330Evaluation of pavement marking retroreflectivity (6290001)LS1$4,000.00$3,600.00
0340Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH1,840$4.70$4.25
0350Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH950$4.70$4.25
0360Milled-in rumble strip (6321000)MI20.56$555.50$925.00
0370Flat sheet, type III, fixed SZ. & MSG. sign (6510105)SF21.50$25.00$26.00
0380Flat sheet,type-XI, fluorescent, fixed size & MSG sign (6510109)SF13.44$28.30$28.00
0390U-section post for sign supports - 3P (6531210)LF180$13.30$8.25
0400Reflective sign post panels (6531500)LF67.19$25.00$7.55
0410Guardrail delineator - white (6562305)EACH260$5.55$3.00
042018" RC pipe cul.-class III (7141113)LF13$139.00$250.00
043030" RC pipe cul.-class III (7141115)LF72$200.00$266.00
044015" RC pipe cul.-class IV (7141122)LF1,381$154.50$146.00
045018" RC pipe cul.-class IV (7141123)LF423$160.00$152.00
046015" RC pipe cul.-class V (7141132)LF11.50$154.00$287.00
047024" RC pipe cul.-class V (7141134)LF105$290.00$240.00
048024"X 38" horizontal elliptical(HE) RC pipe cul.- class HE-III (7141144)LF58$336.00$290.00
0490Cleaning existing pipe (7149999)LF500$8.00$50.00
0510Concrete collar for UP to 24" pipe (7197052)EACH20$4,444.00$5,200.00
0520Beveling of pipe end (7199100)EACH117$100.00$500.00
0530Rip-rap (class B) (8041020)TON31$240.00$225.00
0540Geotextile for erosion control under riprap(class 2)type B (8048205)SY37$5.00$3.00
0550Premash W-beam strong post system WSP3 (8051050)LF613$26.65$25.25
0560Premash trailing W-beam type B 12.5' (8052210)EACH4$1,333.00$1,500.00
0570Premash W-beam compressed SHLDR 9' post (8053001)LF300$35.55$31.25
0580Premash W-beam tight curved system (8055800)LF100$37.80$33.00
0590Temporary barrier fence (orange) (8068301)LF13,865$3.90$3.50
0600Permanent cover (8100100)ACRE11.13$1,644.00$1,480.00
0610Temporary cover (8100200)ACRE33.40$1,439.00$1,295.00
0620Straw or hay mulch with tackifier (8101110)ACRE32.83$1,472.00$1,325.00
0630Fertilizer (nitrogen) (8104005)LB1,113.30$4.15$3.75
0640Fertilizer (phosphoric acid) (8104010)LB1,113.30$4.15$3.75
0650Fertilizer (potash) (8104015)LB1,113.30$4.15$3.75
0660Agricultural granular lime (8105005)LB22,266$0.45$0.40
0670Selective watering (8109050)GAL135,750$0.10$0.09
0680Mowing (8109901)ACRE44.53$444.00$400.00
0690Temporary erosion control blanket (ecb) (8151110)MSY0.54$2,222.00$2,000.00
0700Hydraulic erosion control product (hecp) - type 1 (8151201)ACRE0.57$2,444.00$2,200.00
0710Sediment tubes for ditch checks (8152007)LF1,224$15.00$13.50
0720Silt fence (8153000)LF16,216$5.00$3.00
0730Replace/repair silt fence (8153090)LF1,622$4.70$4.25
0740Removal of silt retained by silt fence (8154050)LF4,054$4.45$4.00
0750Cleaning inlet structure filters (8156200)EACH2$167.00$500.00
0760Inlet structure filter - type A (8156219)LF20$75.00$9.00
0770Stabilized construction entrance (8156490)SY500$32.00$30.00
SCDOT contract 1876500: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of May 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy