Sanders Brothers Construction Company,: SCDOT bid record
Sanders Brothers Construction Company, submitted 37 bids on South Carolina DOT contracts in the data, from 08 FEB 2022 to 09 SEP 2026, and was the low bidder on 13 of them (35%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $97,628,541
- Latest bid
- 09 SEP 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 10 | 3 | 30% |
| 2023 | 3 | 2 | 67% |
| 2024 | 8 | 3 | 38% |
| 2025 | 10 | 4 | 40% |
| 2026 | 6 | 1 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 6 | 35 | 13 | 37% |
| District 7 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Permanent grassing for non-permitted resurfacing projects | 8100102 | ACRE | 31 | 25 (81%) | $3,330.00 | $3,360.00 |
| Permanent yellow pavement markers BI-dir.- 4"X4" | 6301100 | EACH | 33 | 21 (64%) | $6.25 | $6.50 |
| Construction stakes, lines & grades | 1050800 | EACH | 25 | 21 (84%) | $6,750.00 | $30,000 |
| Permanent clear pavement markers- mono-dir.- 4"X4" | 6300005 | EACH | 23 | 18 (78%) | $6.25 | $6.00 |
| Permanent construction signs (ground mounted) | 6021120 | SF | 19 | 18 (95%) | $6.00 | $6.25 |
| Sawcut for loop detector | 6780495 | LF | 19 | 18 (95%) | $7.85 | $9.04 |
| Furnish & instl no. 14 copper wire,1-conductor for loop wire | 6770413 | LF | 19 | 17 (89%) | $0.95 | $1.00 |
| 4" yellow broken lines(gaps exc) - fast dry paint | 6250105 | LF | 18 | 17 (94%) | $0.15 | $0.13 |
| Silt fence | 8153000 | LF | 19 | 16 (84%) | $3.00 | $4.00 |
| Furnish & install 1.0" schedule 80 PVC conduit | 6750275 | LF | 19 | 16 (84%) | $13.00 | $17.50 |
| 4" white broken lines -(gaps excluded)-fast dry paint | 6250005 | LF | 18 | 16 (89%) | $0.15 | $0.14 |
| F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD | 6800518 | EACH | 17 | 16 (94%) | $896.30 | $755.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Banks Construction Company | 35 | 20 of 35 |
| C.R. Jackson, Inc. | 3 | 2 of 3 |
| Blythe Construction, Inc. | 3 | 3 of 3 |
| Palmetto Corp. of Conway | 3 | 1 of 3 |
| Coastal Asphalt, LLC | 2 | 1 of 2 |
| L. Dean Weaver Company LLC | 2 | 1 of 2 |
| Eurovia Atlantic Coast LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 09 SEP 2026 | 1877890 | District 6 | FDP, mill, STB, Intm B Spec, CMRB | 2 of 3 | $9,577,167 | 0.0% |
| 11 AUG 2026 | 8876600 | District 7 | SC (Old Number Six Hwy) Road Departure Mitigation | 2 of 5 | $2,369,096 | +5.0% |
| 12 MAY 2026 | 1876500 | District 6 | SC 165 Rural Road Safety Improvements | 2 of 2 | $9,606,850 | +47% |
| 10 MAR 2026 | 1076430 | District 6 | 2026 Charleston Pavement Improvement | 2 of 2 | $13,518,297 | +13% |
| 13 JAN 2026 | 0874120 | District 6 | S-250(Howe/Hall Road) MP 0.09 - 1.10 Berkeley County RDSM | 2 of 2 | $896,528 | +4.0% |
| 13 JAN 2026 | 0875310 | District 6 | 2026 Berkeley Pavement Improvement | 1 of 2 | $12,970,377 | Low, 5.0% under the second |
| 09 DEC 2025 | 0864370 | District 6 | Safety Improvements - SC 6 | 3 of 3 | $13,286,824 | +35% |
| 12 NOV 2025 | 3874920 | District 7 | 2026 Orangeburg Pavement Improvement | 3 of 3 | $6,517,736 | +14% |
| 09 SEP 2025 | 1874000 | District 6 | 2026 Dorchester Rehab-Recon - CTC | 1 of 3 | $9,891,449 | Low, 5.0% under the second |
| 12 AUG 2025 | 1572770 | District 6 | SC 303 Rural Road Safety Improvements | 4 of 4 | $11,295,602 | +54% |
| 10 JUN 2025 | 0872800 | District 6 | US 17A Rural Road Safety Improvements Berkeley County | 1 of 2 | $5,601,004 | Low, 9.0% under the second |
| 10 JUN 2025 | 1071190 | District 6 | US 17 Rural Roads Safety Project Charleston County | 2 of 2 | $6,628,678 | +12% |
| 10 JUN 2025 | 1872790 | District 6 | SC 61 Rural Road Safety Improvements Dorchester County | 2 of 2 | $6,551,440 | +30% |
| 10 JUN 2025 | 8871200 | District 6 | US 17 Alt. Rural Roads Safety Project Berkeley County | 1 of 3 | $5,776,980 | Low, 10% under the second |
| 11 MAR 2025 | 1070570 | District 6 | 2025 Charleston Reconstruction-Rehab | 2 of 2 | $19,377,113 | +10% |
| 14 JAN 2025 | 0869500 | District 6 | 2025 Primary Pavement Improvement Program - Non NHS | 1 of 2 | $13,990,776 | Low, 11% under the second |
| 13 NOV 2024 | 1869900 | District 6 | 2025 Primary Pavement Improvement Program - NHS | 1 of 2 | $10,843,765 | Low, 7.0% under the second |
| 09 JUL 2024 | 0868960 | District 6 | Safety Improvements S-250 and S-413 | 2 of 2 | $1,113,207 | +9.0% |
| 11 JUN 2024 | 1068990 | District 6 | 2024 Primary Program Mill, Spec B, STB | 2 of 2 | $4,567,732 | +11% |
| 12 MAR 2024 | 5668460 | District 6 | 2022/2023 District 6 Pavement Improvement Program | 2 of 2 | $37,923,364 | +7.0% |
| 13 FEB 2024 | 1066940 | District 6 | STB, FDP, mill, Intm B Spec | 1 of 2 | $9,899,058 | Low, 2.0% under the second |
| 13 FEB 2024 | 1068160 | District 6 | S-881 (Lincolnville Road) MP 0.00 - 3.64 Charleston County | 1 of 2 | $2,181,587 | Low, 1.0% under the second |
| 09 JAN 2024 | 1866300 | District 6 | STB, STC, mill, Intm B Spec | 2 of 2 | $12,905,889 | +12% |
| 09 JAN 2024 | 5664390 | District 6 | Reconstruction/Rehabilitation - District 6 | 2 of 2 | $6,934,930 | +11% |
| 14 NOV 2023 | 5666390 | District 6 | STB, STC, mill Intm B Spec, wdn | 1 of 2 | $8,358,840 | Low, 8.0% under the second |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.