SCDOT contract 8871200 bid tabulation

US 17 Alt. Rural Roads Safety Project Berkeley County. Let by South Carolina DOT on June 10, 2025, Berkeley, District 6. 3 bids received; low bid $5,776,980 by Sanders Brothers Construction Company,.

Owner
South Carolina DOT
Letting
10 JUN 2025
Pay items
33
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sanders Brothers Construction Company,$5,776,980Low
2Banks Construction Company$6,346,001+10%
3Coastal Asphalt, LLC$6,992,407+21%
SCDOT contract 8871200: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sanders Brothers Construction Company,2. Banks Construction Company3. Coastal Asphalt, LLC
0010Mobilization (1031000)LS1$85,000$200,000$200,000
0020Bonds and insurance (1032010)LS1$25,000$30,000$41,000
0030Limb trimming (2016010)LS1$62,500$100,000$31,450
0040Removal & disposal of existing pavement (2023000)SY2,561$5.00$20.00$9.00
0050Unclassified excavation (2031000)CY591$33.00$45.00$45.00
0060Borrow excavation (2033000)CY3,390$55.00$48.00$48.00
0070Maintenance stone (3059900)TON223.74$145.00$150.00$36.00
0080Liquid asphalt binder PG64-22 (4011004)TON820.38$660.00$795.00$630.00
0090Full depth asph. pav. patching 10"unif (4012100)SY22,374$70.00$74.50$100.00
0100Milling existing asphalt pavement 2.0" (4013120)SY149,160$1.15$0.90$2.45
0110Milling existing asphalt pavement (variable) (4013990)SY666.67$10.50$20.00$15.00
0120Asphalt intermediate course type B (4030320)TON14,916$85.50$88.00$95.00
0130Asphalt surface course type B (4040320)TON14,916$83.50$88.00$95.00
0140Driveway paving-surface type D (4047230)TON738.75$180.00$230.00$160.00
0150Traffic control (6011000)LS1$190,000$248,000$179,000
0160Permanent construction signs (ground mounted) (6051120)SF496$6.85$5.45$5.45
01704" white broken lines -(gaps excluded)-fast dry paint (6240005)LF1,550$0.10$0.12$0.12
01804" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF130,250$0.10$0.11$0.11
019024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF800$0.50$1.00$1.00
02004" yellow broken lines(gaps exc) - fast dry paint (6240105)LF114,750$0.10$0.01$0.01
02104"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF16,400$0.10$0.18$0.18
02206" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007)LF1,525$1.00$0.90$0.90
02306" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012)LF43,450$0.74$0.88$0.88
024024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF550$8.00$12.00$12.00
02506" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271066)LF38,275$0.74$0.90$0.90
02606" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271076)LF57,790$0.74$0.88$0.88
0270Evaluation of pavement marking retroreflectivity (6290001)LS1$9,796.00$3,700.00$3,700.00
0280Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH600$6.50$4.00$4.00
0290Milled-in rumble strip (6321000)MI25.43$475.00$500.00$500.00
0300Reflective sign post panels (6531500)LF360$7.75$8.50$8.50
0310Guardrail delineator - white (6562305)EACH100$5.00$5.00$5.00
0320Premash type T TL3 leading 50' (8057100)EACH8$3,460.00$3,600.00$3,460.00
0330Permanent grassing for non-permitted resurfacing projects (8100102)ACRE8.22$3,325.00$3,325.00$4,250.00
SCDOT contract 8871200: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of June 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy