Eurovia Atlantic Coast LLC: SCDOT bid record
Eurovia Atlantic Coast LLC submitted 52 bids on South Carolina DOT contracts in the data, from 11 JAN 2022 to 14 NOV 2023, and was the low bidder on 15 of them (29%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $156,455,215
- Latest bid
- 14 NOV 2023
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 34 | 9 | 26% |
| 2023 | 18 | 6 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 21 | 5 | 24% |
| District 1 | 16 | 5 | 31% |
| District 6 | 9 | 5 | 56% |
| District 2 | 3 | 0 | 0% |
| District 4 | 2 | 0 | 0% |
| Statewide | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint | 6250110 | LF | 44 | 34 (77%) | $0.12 | $0.13 |
| 4" white solid lines (PVT. edge lines)-fast dry paint | 6250010 | LF | 44 | 34 (77%) | $0.12 | $0.13 |
| 4" yellow broken lines(gaps exc) - fast dry paint | 6250105 | LF | 42 | 33 (79%) | $0.14 | $0.13 |
| Maintenance stone | 3069900 | TON | 47 | 31 (66%) | $44.00 | $72.00 |
| 4" white broken lines -(gaps excluded)-fast dry paint | 6250005 | LF | 41 | 31 (76%) | $0.14 | $0.14 |
| 24" white solid lines (stop/diagonal lines)-fast dry paint | 6250025 | LF | 40 | 30 (75%) | $1.38 | $1.50 |
| Permanent construction signs (ground mounted) | 6021120 | SF | 45 | 29 (64%) | $5.35 | $6.25 |
| Permanent yellow pavement markers BI-dir.- 4"X4" | 6301100 | EACH | 42 | 27 (64%) | $6.50 | $6.50 |
| Permanent clear pavement markers- mono-dir.- 4"X4" | 6300005 | EACH | 32 | 23 (72%) | $6.50 | $6.00 |
| Liquid asphalt binder PG64-22 | 4011004 | TON | 49 | 21 (43%) | $682.50 | $715.00 |
| 8"white solid lines (crosswalk& channelization)fast dry paint | 6250015 | LF | 28 | 20 (71%) | $0.25 | $0.22 |
| Remove & dispose semi-rigid GR device | 8050010 | LF | 23 | 20 (87%) | $1.00 | $1.08 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Palmetto Corp. of Conway | 33 | 18 of 33 |
| C.R. Jackson, Inc. | 30 | 16 of 30 |
| Reeves Construction Company | 20 | 7 of 20 |
| Lynches River Contracting, Inc. | 16 | 7 of 16 |
| Satterfield Construction Company, Inc. | 7 | 7 of 7 |
| Apac-Atlantic Inc. | 6 | 3 of 6 |
| Atc Site Construction, Inc. | 3 | 3 of 3 |
| Sloan Construction, A Div. of Reeves | 1 | 0 of 1 |
| Sanders Brothers Construction Company, | 1 | 0 of 1 |
| Banks Construction Company | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 14 NOV 2023 | 2766350 | District 6 | Shld Wdn, STB, STC, mill, Intm | 2 of 2 | $7,770,359 | +6.0% |
| 14 NOV 2023 | 2767020 | District 6 | 2023 District 6 CTC Program Jasper County | 1 of 3 | $4,352,501 | Low, 6.0% under the second |
| 14 NOV 2023 | 3266760 | District 1 | 2024 Lexington County Rehabilitation | 1 of 4 | $12,216,118 | Low, 11% under the second |
| 14 NOV 2023 | 5266150 | District 2 | SW; FDP; Mill; Surf; Loops; GRail | 2 of 2 | $13,159,396 | +37% |
| 10 OCT 2023 | 2063861 | District 4 | Preservation - Longtown Road (Fairfield Co) | 3 of 4 | $6,805,015 | +12% |
| 12 SEP 2023 | 0666420 | District 7 | SurfCourse;FDP;ShldPav;MillFill - Dist 7 | 2 of 2 | $976,344 | +31% |
| 12 SEP 2023 | 1866520 | District 6 | I-95 Dorchester | 1 of 3 | $51,541,202 | Low, 4.0% under the second |
| 12 SEP 2023 | 5766310 | District 7 | SurfCourse;FDP;ShldPav;MillFill | 3 of 3 | $8,330,967 | +7.0% |
| 12 SEP 2023 | 5766500 | District 7 | SurfCourse;FDP;ShldPav;MillFill | 2 of 3 | $9,267,416 | +18% |
| 13 JUN 2023 | 1564910 | District 6 | SC 63 Safety Improvements in Colleton County | 1 of 2 | $16,528,304 | Low, 6.0% under the second |
| 13 JUN 2023 | 2565510 | District 7 | 2023 Primary Program -SurfCourse;FDP;ShldPav;MillFill | 1 of 2 | $1,604,856 | Low, 4.0% under the second |
| 13 JUN 2023 | 4065550 | District 1 | Richland CTC | 3 of 5 | $2,943,010 | +7.0% |
| 13 JUN 2023 | 5764011 | District 7 | Reconstruction/Rehabilitation - District 7 | 2 of 2 | $13,625,046 | +15% |
| 14 MAR 2023 | 3864770 | District 7 | Rehabilitation - Orangeburg Co | 3 of 3 | $3,142,106 | +13% |
| 14 MAR 2023 | 5164550 | District 1 | Rehabilitation - Richland/Lexington Co | 2 of 5 | $13,343,110 | +4.0% |
| 14 MAR 2023 | 5264460 | District 2 | Reconstruction/Rehabilitation - Newberry/Saluda Co | 2 of 2 | $7,783,621 | +11% |
| 14 FEB 2023 | 0264510 | District 7 | Rehabilitation - Aiken Co | 2 of 2 | $3,860,501 | +29% |
| 10 JAN 2023 | 3864210 | District 7 | Reconstruction/Rehabilitation - Orangeburg Co | 1 of 2 | $10,710,267 | Low, 1.0% under the second |
| 08 NOV 2022 | 1563270 | District 6 | Reconstruction/Rehabilitation - Colleton Co | 2 of 3 | $16,305,778 | +12% |
| 08 NOV 2022 | 4063620 | District 1 | Reconstruction/Rehabilitation - Richland Co | 5 of 5 | $16,839,190 | +25% |
| 08 NOV 2022 | 5663110 | District 6 | Reconstruction/Rehabilitation - District 6 | 1 of 2 | $13,576,661 | Low, 32% under the second |
| 08 NOV 2022 | 5763600 | District 7 | Reconstruction/Rehabilitation - District 7 | 3 of 3 | $12,156,189 | +2.0% |
| 08 NOV 2022 | 8864000 | Statewide | Preservation - I-26 (MM 125/MM 136) | 3 of 3 | $12,462,707 | +10% |
| 11 OCT 2022 | 0259611 | District 7 | Preservation - I-20 (Aiken County) | 2 of 3 | $10,553,511 | +22% |
| 11 OCT 2022 | 3259201 | District 1 | Interstate Preservation - I-20 (Lexington Co) | 3 of 4 | $8,448,633 | +16% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.