SCDOT contract 0873130 bid tabulation
US-176 (State Rd.) / S-467 (Black Tom Rd.). Let by South Carolina DOT on May 13, 2025, Berkeley, District 6. 2 bids received; low bid $4,122,783 by Banks Construction Company.
- Owner
- South Carolina DOT
- Letting
- 13 MAY 2025
- Pay items
- 94
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Banks Construction Company | $4,122,783 | Low |
| 2 | Palmetto Sitework Services, LLC | $5,154,335 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Banks Construction Company | 2. Palmetto Sitework Services, LLC |
|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $204,000 | $475,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $80,000 | $150,000 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $150,000 | $95,000 |
| 0040 | Law enforcement officer (DPS) (1071504) | HR | 768 | $50.00 | $50.00 |
| 0050 | CPM progress schedule (1080300) | LS | 1 | $25,000 | $80,000 |
| 0060 | Clearing & grubbing within right of way (2011000) | LS | 1 | $200,000 | $275,000 |
| 0070 | Removal & disposal of existing asphalt pavement (2025000) | SY | 116 | $100.00 | $55.00 |
| 0080 | Unclassified excavation (2031000) | CY | 1,392 | $50.00 | $50.00 |
| 0090 | Borrow excavation (2033000) | CY | 9,656 | $33.60 | $60.00 |
| 0100 | Muck excavation (2034000) | CY | 6,720 | $14.90 | $50.00 |
| 0110 | 30" diameter pipe additional foundation work (2034530) | LF | 108 | $50.00 | $95.00 |
| 0120 | Geotextile, separation (2036020) | SY | 6,560 | $2.00 | $3.50 |
| 0130 | Geogrid reinforcement (biaxial) (2037010) | SY | 8,565 | $2.00 | $3.50 |
| 0140 | Stone bridge lift material (2052010) | TON | 5,820 | $66.00 | $90.00 |
| 0150 | Granular bridge lift material (2052020) | CY | 100 | $80.00 | $150.00 |
| 0160 | Fine grading (2081001) | SY | 4,670 | $10.00 | $4.50 |
| 0170 | Maintenance stone (3059900) | TON | 90 | $180.00 | $100.00 |
| 0180 | Liquid asphalt binder PG64-22 (4011004) | TON | 369 | $725.00 | $750.00 |
| 0190 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 2,865 | $75.00 | $70.00 |
| 0200 | Milling existing asphalt pavement (variable) (4013990) | SY | 373 | $50.00 | $20.00 |
| 0210 | Asphalt base course - type A (4020310) | TON | 2,449 | $168.00 | $125.00 |
| 0220 | Asphalt intermediate course type B (4030320) | TON | 2,926 | $170.00 | $125.00 |
| 0230 | Asphalt surface course type B (4040320) | TON | 1,796 | $168.00 | $135.00 |
| 0240 | Traffic control (6011000) | LS | 1 | $279,300 | $560,000 |
| 0250 | Barricade - type III (6041200) | LF | 210 | $10.00 | $23.00 |
| 0260 | Permanent construction signs (ground mounted) (6051120) | SF | 460 | $7.00 | $8.00 |
| 0270 | Permanent construction signs (barricade mounted) (6051125) | SF | 285 | $10.00 | $9.00 |
| 0280 | Construction zone electric changeable message sign (trailer (6062000) | EACH | 4 | $6,000.00 | $7,000.00 |
| 0290 | Type B - flashing light (608100B) | EACH | 8 | $60.00 | $139.00 |
| 0300 | Pavement markings(temp- paint) 4" white broken lines (609105A) | LF | 307 | $1.00 | $0.17 |
| 0310 | Pavement markings(temp- paint) 4" yellow broken lines (609105B) | LF | 564 | $1.00 | $0.17 |
| 0320 | Pavement markings(temporary-paint)-4" white solid lines (609115A) | LF | 49,485 | $0.20 | $0.17 |
| 0330 | Pavement markings(temporary-paint)-4" yellow solid lines (609115B) | LF | 44,975 | $0.20 | $0.17 |
| 0340 | Pavement markings(temporary-paint)- 24"white solid lines (609135A) | LF | 165 | $4.00 | $1.67 |
| 0350 | Pavement markings(temporary-paint)- white single arrow (609160A) | EACH | 8 | $50.00 | $27.78 |
| 0360 | Pavement markings(temporary-paint)- white word 'only (609180A) | EACH | 8 | $100.00 | $27.78 |
| 0370 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 100 | $15.00 | $8.33 |
| 0380 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 600 | $0.75 | $0.83 |
| 0390 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 5,000 | $0.50 | $0.56 |
| 0400 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 125 | $8.50 | $9.44 |
| 0410 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 6 | $100.00 | $111.11 |
| 0420 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 6 | $100.00 | $111.11 |
| 0430 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 7,500 | $0.50 | $0.56 |
| 0440 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 30 | $7.50 | $8.33 |
| 0450 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 100 | $7.50 | $8.33 |
| 0460 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 38 | $38.60 | $42.89 |
| 0470 | Mounting assembly for F.S. sign erctd on span wire (6513015) | EACH | 1 | $484.18 | $537.98 |
| 0480 | U-section post for sign supports - 2P (6531205) | LF | 30 | $18.00 | $20.00 |
| 0490 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 80 | $13.89 | $15.43 |
| 0500 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 120 | $15.72 | $17.47 |
| 0510 | Furnish & install 3.0" schedule 80 PVC conduit (675027C) | LF | 40 | $35.20 | $39.11 |
| 0520 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 510 | $6.42 | $6.48 |
| 0530 | Furnish & install no. 14 copper wire, 8 conductor (black) (6770393) | LF | 1,225 | $7.61 | $8.46 |
| 0540 | Furnish & install electrical service for traffic signal (6800499) | EACH | 1 | $2,000.00 | $2,222.22 |
| 0550 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 3 | $1,681.77 | $1,868.63 |
| 0560 | F&I-17"X30"X24"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (680052C) | EACH | 1 | $2,478.60 | $2,754.00 |
| 0580 | Furnish & install 3/8" galvanized steel cable (6825092) | LF | 380 | $11.88 | $13.20 |
| 0600 | Furnish & install - 12" 5 (6865710) | EACH | 2 | $1,796.33 | $1,995.92 |
| 0610 | Furnish & install -12" 4 (6865720) | EACH | 1 | $1,599.56 | $1,777.29 |
| 0620 | Furnish & install - 12" 3 (6865723) | EACH | 5 | $1,295.70 | $1,439.67 |
| 0630 | F&I-ped push but.solid state W/ tone assem 9"X15"&sign (R- 10-3E or R10-4A) (6865797) | EACH | 2 | $1,018.53 | $1,131.70 |
| 0640 | Backplate W/ retrorefl.borders for traff. sig. (6865834) | EACH | 8 | $288.88 | $320.98 |
| 0650 | Temporary adjustment of traffic signal equipment (6885993) | EACH | 1 | $5,000.00 | $5,500.00 |
| 0660 | Temporary timing adjustments per site visit (6885996) | EACH | 5 | $1,500.00 | $1,700.00 |
| 0661 | Install foundation for steel strain pole (6887940) | EACH | 4 | $9,100.00 | $10,500 |
| 0670 | Furnish & install radar for stop bar detection, inc 150' cable & mounting hardware (6887971) | EACH | 2 | $9,149.00 | $10,500 |
| 0680 | Furnish & install cabinet interface components for radar detection (6887972) | EACH | 1 | $7,839.75 | $8,710.00 |
| 0690 | Furnish & install radar for setback detection, inc 150' cable & mounting hardware (6887973) | EACH | 2 | $11,356 | $12,620 |
| 0700 | Furnish & install cabinet interface components for setback detection (6887974) | EACH | 1 | $9,481.56 | $10,550 |
| 0701 | Install steel strain pole on existing foundation (6888155) | EACH | 4 | $2,750.00 | $3,100.00 |
| 0702 | Install controller and 332/336 cabinet assembly- base mounted-including foundation (6888225) | EACH | 1 | $7,125.00 | $8,000.00 |
| 0710 | 18" smooth wall pipe (7143618) | LF | 132 | $225.00 | $120.00 |
| 0720 | 30" smooth wall pipe (7143630) | LF | 108 | $250.00 | $180.00 |
| 0730 | Beveling of pipe end (7199100) | EACH | 2 | $1,200.00 | $1,200.00 |
| 0740 | Concrete driveway(6" uniform) (7205000) | SY | 28 | $110.00 | $300.00 |
| 0750 | Rip-rap (class B) (8041020) | TON | 178 | $200.00 | $115.00 |
| 0760 | Geotextile for erosion control under riprap(class 2)type B (8048205) | SY | 225 | $10.00 | $7.00 |
| 0770 | Right of way marker(rebar and cap) (8091010) | EACH | 11 | $125.00 | $110.00 |
| 0780 | Right of way plat (8091050) | LS | 1 | $10,000 | $8,000.00 |
| 0790 | Permanent cover (8100100) | ACRE | 2.29 | $1,400.00 | $1,730.00 |
| 0800 | Temporary cover (8100200) | ACRE | 3.43 | $1,280.00 | $1,421.05 |
| 0810 | Compost (8101105) | CY | 30 | $38.00 | $36.84 |
| 0820 | Fertilizer (nitrogen) (8104005) | LB | 229 | $4.50 | $3.20 |
| 0830 | Fertilizer (phosphoric acid) (8104010) | LB | 229 | $4.50 | $3.20 |
| 0840 | Fertilizer (potash) (8104015) | LB | 229 | $4.50 | $3.20 |
| 0850 | Agricultural granular lime (8105005) | LB | 4,568 | $0.45 | $3.20 |
| 0860 | Selective watering (8109050) | GAL | 54,300 | $0.09 | $0.10 |
| 0870 | Mowing (8109901) | ACRE | 11.42 | $395.00 | $740.00 |
| 0880 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 5.71 | $2,900.00 | $5,050.00 |
| 0890 | Sediment tubes for ditch checks (8152007) | LF | 930 | $14.00 | $12.00 |
| 0900 | Silt fence (8153000) | LF | 2,508 | $3.00 | $3.00 |
| 0910 | Replace/repair silt fence (8153090) | LF | 251 | $4.50 | $2.20 |
| 0920 | Removal of silt retained by silt fence (8154050) | LF | 627 | $3.95 | $12.00 |
| 0930 | Stabilized construction entrance (8156490) | SY | 550 | $40.00 | $35.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of May 13, 2025. Compiled by Mirage Metrics.