SCDOT contract 4275670 bid tabulation
Bridge Replacement - S-234 over Tributary to Enoree River. Let by South Carolina DOT on August 11, 2026, Spartanburg, District 3. 10 bids received; low bid $2,226,392 by United Infrastructure Group, Inc..
- Owner
- South Carolina DOT
- Letting
- 11 AUG 2026
- Pay items
- 84
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | United Infrastructure Group, Inc. | $2,226,392 | Low |
| 2 | Dane Construction, LLC | $2,401,123 | +8.0% |
| 3 | Reeves Construction Company | $2,532,975 | +14% |
| 4 | Eagle Construction Company | $2,668,352 | +20% |
| 5 | Dellinger, Inc. | $2,838,579 | +27% |
| 6 | Wright Brothers Construction Company, | $2,839,143 | +28% |
| 7 | Palmetto Infrastructure, Inc. | $2,849,102 | +28% |
| 8 | Ipc Paving LLC | $2,910,718 | +31% |
| 9 | Rakes Building and Maintenance | $3,186,315 | +43% |
| 10 | Crescent Industries, LLC | $3,852,800 | +73% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. United Infrastructure Group, Inc. | 2. Dane Construction, LLC | 3. Reeves Construction Company | 4. Eagle Construction Company | 5. Dellinger, Inc. | 6. Wright Brothers Construction Company, |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $111,320 | $120,055 | $126,000 | $160,000 | $140,000 | $140,000 |
| 0020 | Bridge construction access (1031200) | LS | 1 | $44,528 | $120,055 | $50,000 | $92,500 | $75,000 | $48,800 |
| 0030 | Bonds and insurance (1032010) | LS | 1 | $66,792 | $48,020 | $50,000 | $53,500 | $40,000 | $17,500 |
| 0040 | Construction stakes, lines & grades (1050800) | EACH | 1 | $50,000 | $20,501 | $40,000 | $38,000 | $35,000 | $31,600 |
| 0050 | CPM progress schedule (1080300) | LS | 1 | $10,000 | $21,000 | $500.00 | $4,500.00 | $12,000 | $15,500 |
| 0060 | Clearing & grubbing within right of way (2011000) | LS | 1 | $150,000 | $55,000 | $115,000 | $74,500 | $45,000 | $51,100 |
| 0070 | Removal & disposal of existing asphalt pavement (2025000) | SY | 191 | $13.50 | $15.00 | $24.00 | $14.00 | $13.50 | $32.20 |
| 0080 | Removal of exist. guardrail (2027801) | LF | 205 | $14.00 | $15.00 | $6.00 | $3.00 | $14.00 | $12.70 |
| 0090 | Removal & disposal of existing bridge (2028100) | LS | 1 | $200,000 | $76,605 | $115,000 | $50,000 | $250,000 | $116,500 |
| 0100 | Unclassified excavation (2031000) | CY | 2,392 | $19.50 | $20.00 | $50.00 | $23.32 | $19.50 | $56.25 |
| 0110 | Borrow excavation (2033000) | CY | 1,568 | $26.00 | $32.00 | $48.00 | $60.00 | $29.00 | $48.70 |
| 0120 | Geogrid reinforcement (uniaxial) (2037000) | SY | 1,256 | $14.00 | $12.50 | $18.22 | $12.00 | $14.00 | $12.30 |
| 0130 | Fine grading (2081001) | SY | 733 | $12.00 | $7.50 | $40.00 | $3.00 | $12.00 | $25.50 |
| 0140 | Maintenance stone (3059900) | TON | 100 | $48.00 | $65.00 | $35.00 | $48.00 | $48.00 | $59.75 |
| 0150 | Liquid asphalt binder PG64-22 (4011004) | TON | 26 | $717.12 | $913.56 | $1,032.61 | $940.00 | $950.00 | $970.00 |
| 0160 | Milling existing asphalt pavement (variable) (4013990) | SY | 1,140 | $12.29 | $14.25 | $20.11 | $14.00 | $18.50 | $13.55 |
| 0170 | Asphalt base course - type B (4020320) | TON | 102 | $174.16 | $188.36 | $393.59 | $295.00 | $362.10 | $305.00 |
| 0180 | Asphalt intermediate course type C (4030330) | TON | 120 | $174.16 | $186.00 | $348.70 | $275.00 | $320.80 | $285.00 |
| 0190 | Asphalt surface course type C (4040340) | TON | 232 | $174.16 | $185.58 | $293.64 | $200.00 | $270.15 | $203.00 |
| 0200 | Traffic control (6011000) | LS | 1 | $40,675 | $7,500.00 | $30,000 | $32,000 | $8,000.00 | $40,200 |
| 0210 | Barricade - type III (6041200) | LF | 84 | $22.47 | $35.00 | $28.00 | $35.00 | $35.00 | $31.60 |
| 0220 | Permanent construction signs (ground mounted) (6051120) | SF | 128 | $7.92 | $4.25 | $8.00 | $10.00 | $7.25 | $9.05 |
| 0230 | Permanent construction signs (barricade mounted) (6051125) | SF | 70 | $7.92 | $7.25 | $9.00 | $10.00 | $7.25 | $10.15 |
| 0240 | Type B - flashing light (608100B) | EACH | 16 | $133.75 | $177.01 | $250.00 | $160.00 | $135.00 | $141.00 |
| 0250 | Pavement markings(temporary-paint)-4" white solid lines (609115A) | LF | 2,100 | $0.25 | $0.25 | $0.25 | $0.30 | $0.25 | $0.30 |
| 0260 | Pavement markings(temporary-paint)-4" yellow solid lines (609115B) | LF | 2,100 | $0.25 | $0.25 | $0.25 | $0.30 | $0.25 | $0.30 |
| 0270 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 30 | $10.00 | $10.00 | $10.00 | $12.00 | $10.00 | $11.30 |
| 0280 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 1,700 | $2.00 | $2.00 | $2.00 | $2.50 | $2.00 | $2.25 |
| 0290 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 1,700 | $2.00 | $2.00 | $2.00 | $2.50 | $2.00 | $2.25 |
| 0300 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 30 | $10.00 | $10.00 | $10.00 | $12.00 | $10.00 | $11.30 |
| 0310 | Pref.flex.retro.PVMT.mark(T- 1)perm.(60MIL)4"WH.solid (6351150) | LF | 400 | $5.50 | $5.50 | $5.50 | $6.50 | $5.50 | $6.20 |
| 0320 | Pref.flex.retro.PVMT.mark(T- 1)perm.(60MIL)4"yel.sol. (6351450) | LF | 400 | $5.50 | $5.50 | $5.50 | $6.50 | $5.50 | $6.20 |
| 0330 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 12 | $35.31 | $25.00 | $15.00 | $40.00 | $25.00 | $16.95 |
| 0340 | Flat sheet, type III, size determined by MSG (6510106) | SF | 8 | $35.31 | $25.00 | $16.00 | $40.00 | $25.00 | $18.05 |
| 0350 | U-section post for sign supports - 2P (6531205) | LF | 20 | $19.26 | $15.00 | $8.00 | $21.00 | $15.00 | $9.05 |
| 0360 | U-section post for sign supports - 3P (6531210) | LF | 20 | $19.26 | $15.00 | $9.00 | $21.00 | $15.00 | $10.15 |
| 0370 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 744 | $9.88 | $15.00 | $28.19 | $20.00 | $37.32 | $51.00 |
| 0380 | Conc. for structures - class 4000 (7011400) | CY | 326.80 | $1,560.00 | $1,580.00 | $1,590.00 | $1,830.00 | $2,400.00 | $2,525.00 |
| 0390 | Grooved surface finish (7023200) | SY | 514 | $15.00 | $13.50 | $20.00 | $15.00 | $18.37 | $14.95 |
| 0400 | Reinf. steel for structures (bridge) (7031200) | LB | 89,163 | $1.35 | $2.00 | $1.50 | $2.25 | $1.13 | $2.25 |
| 0410 | Hoop reinforcing steel for structures (bridge) (7031220) | LB | 2,287 | $4.00 | $4.00 | $4.00 | $4.00 | $2.51 | $16.25 |
| 0420 | Prestressed conc. beam (type III) (7043000) | LF | 715 | $270.00 | $575.00 | $405.00 | $590.00 | $550.00 | $309.00 |
| 0430 | 42" MASH concrete barrier parapet/railing wall (7051050) | LF | 370 | $100.00 | $115.00 | $120.00 | $125.00 | $150.00 | $119.00 |
| 0440 | Pile driving set-UP (7110010) | EACH | 10 | $3,000.00 | $2,000.00 | $2,000.00 | $2,200.00 | $8,000.00 | $2,100.00 |
| 0450 | Reinf. pile tips (HP14 X 89) (7111565) | EACH | 10 | $190.00 | $415.00 | $250.00 | $450.00 | $176.55 | $236.00 |
| 0460 | Steel H bearing piling (HP14 X 89) (7112230) | LF | 236 | $93.00 | $100.00 | $155.00 | $110.00 | $101.20 | $323.00 |
| 0470 | Drilled shaft set-UP (7120006) | EACH | 2 | $25,000 | $3,250.00 | $35,000 | $3,500.00 | $40,000 | $1,100.00 |
| 0480 | Crosshole sonic logging setup (7120010) | EACH | 2 | $3,500.00 | $2,500.00 | $2,500.00 | $2,700.00 | $660.00 | $2,800.00 |
| 0490 | Drilled shaft with rock excavation - 42" diameter (7120152) | LF | 32 | $1,253.71 | $2,305.00 | $1,400.00 | $2,500.00 | $1,605.92 | $2,300.00 |
| 0500 | Drilled shaft with wet & dry excavation - 48" diameter (7120161) | LF | 54 | $1,257.47 | $2,100.00 | $1,400.00 | $2,250.00 | $1,527.62 | $2,010.00 |
| 0510 | Construction casing - 48" diameter (7120165) | LF | 48 | $424.10 | $400.00 | $360.40 | $425.00 | $426.40 | $407.00 |
| 0520 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 85 | $65.00 | $65.00 | $175.00 | $135.00 | $65.00 | $73.50 |
| 0530 | Elastomeric bearing (7243100) | EACH | 20 | $500.00 | $350.00 | $500.00 | $375.00 | $300.00 | $2,020.00 |
| 0540 | Waterproofing (7282000) | SY | 24.80 | $100.00 | $100.00 | $190.00 | $110.00 | $72.41 | $87.25 |
| 0550 | Aggregate underdrain(agg#789)with 4"perf.pipe for struc (8011210) | TON | 100 | $100.00 | $85.00 | $120.00 | $100.00 | $120.00 | $79.25 |
| 0560 | 12" temporary pipe slope drain (8034120) | LF | 230 | $12.00 | $15.00 | $25.00 | $51.00 | $12.00 | $13.25 |
| 0570 | Rip-rap (class A) (8041010) | TON | 347 | $81.00 | $90.00 | $82.00 | $75.00 | $81.00 | $95.25 |
| 0580 | Rip-rap (class B) (8041020) | TON | 413 | $81.00 | $85.00 | $86.00 | $75.00 | $81.00 | $98.00 |
| 0590 | Geotextile for erosion control under riprap(class 1)type C (8048110) | SY | 459 | $2.30 | $5.00 | $6.00 | $4.00 | $2.30 | $5.30 |
| 0600 | Geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 397 | $2.30 | $5.00 | $6.00 | $4.00 | $2.30 | $4.85 |
| 0610 | Non-mow strip under guardrail (8055250) | SY | 55 | $72.00 | $72.00 | $171.00 | $180.00 | $72.00 | $81.25 |
| 0620 | Temporary barrier fence (orange) (8068301) | LF | 2,025 | $4.00 | $4.00 | $3.75 | $3.50 | $4.00 | $3.20 |
| 0630 | Moving item no. 5X12 metal gate on two 8 inch diameter wood posts (8081000) | LS | 1 | $1,200.00 | $1,500.00 | $3,200.00 | $700.00 | $1,200.00 | $1,900.00 |
| 0640 | Right of way marker(rebar and cap) (8091010) | EACH | 15 | $150.00 | $200.00 | $250.00 | $340.00 | $340.00 | $113.00 |
| 0650 | Right of way plat (8091050) | LS | 1 | $3,000.00 | $3,000.00 | $5,000.00 | $2,700.00 | $4,500.00 | $2,800.00 |
| 0660 | Permanent cover (8100100) | ACRE | 1.24 | $3,300.00 | $1,800.00 | $1,522.54 | $2,000.00 | $3,300.00 | $2,100.00 |
| 0670 | Temporary cover (8100200) | ACRE | 0.62 | $2,500.00 | $1,400.00 | $1,722.22 | $1,300.00 | $2,500.00 | $1,400.00 |
| 0680 | Fertilizer (nitrogen) (8104005) | LB | 124 | $3.00 | $5.00 | $3.75 | $2.50 | $3.00 | $2.55 |
| 0690 | Fertilizer (phosphoric acid) (8104010) | LB | 124 | $3.00 | $5.00 | $3.75 | $2.50 | $3.00 | $2.55 |
| 0700 | Fertilizer (potash) (8104015) | LB | 124 | $3.00 | $5.00 | $3.75 | $2.50 | $3.00 | $2.55 |
| 0710 | Agricultural granular lime (8105005) | LB | 2,483 | $0.50 | $0.09 | $0.40 | $1.20 | $0.50 | $0.80 |
| 0720 | Selective watering (8109050) | GAL | 54,300 | $0.02 | $0.09 | $0.09 | $0.18 | $0.02 | $0.10 |
| 0730 | Mowing (8109901) | ACRE | 4 | $250.00 | $100.00 | $550.00 | $600.00 | $250.00 | $333.00 |
| 0740 | Turf reinforcement matting (TRM) type 1 (8151101) | MSY | 0.46 | $4,300.00 | $4,000.00 | $3,921.57 | $7,300.00 | $4,300.00 | $6,700.00 |
| 0750 | Temporary erosion control blanket (ecb) (8151110) | MSY | 1.71 | $3,000.00 | $1,700.00 | $1,650.00 | $3,350.00 | $3,000.00 | $1,600.00 |
| 0760 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 1.24 | $4,400.00 | $3,200.00 | $2,897.66 | $4,250.00 | $4,400.00 | $4,300.00 |
| 0770 | Silt fence (8153000) | LF | 1,881 | $5.00 | $3.00 | $5.00 | $4.25 | $5.00 | $3.90 |
| 0780 | Silt basins (8154000) | CY | 119 | $30.00 | $40.00 | $41.00 | $20.00 | $30.00 | $119.00 |
| 0790 | Cleaning silt basins (8154010) | CY | 186 | $27.04 | $100.00 | $48.00 | $20.00 | $64.52 | $101.00 |
| 0800 | Removal of silt retained by silt fence (8154050) | LF | 120 | $6.00 | $10.00 | $9.00 | $8.00 | $6.00 | $9.70 |
| 0810 | Inlet filter cleaning (8154155) | EACH | 60 | $20.00 | $250.00 | $90.00 | $225.00 | $20.00 | $141.00 |
| 0820 | Inlet structure filter - type B (8156210) | EACH | 12 | $300.00 | $350.00 | $300.00 | $525.00 | $300.00 | $407.00 |
| 0830 | Aggregate no.5 or 57 for erosion control (8156410) | TON | 210 | $44.00 | $70.00 | $95.00 | $65.50 | $44.00 | $70.75 |
| 0840 | Stabilized construction entrance (8156490) | SY | 550 | $10.00 | $25.00 | $18.00 | $30.00 | $10.00 | $20.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of August 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way