| 0010 | Mobilization (1031000) | LS | 1 | $450,000 | $500,000 | $327,500 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $270,680 | $300,000 | $114,715 |
| 0030 | Selected clearing & grubbing (2014000) | LS | 1 | $64,500 | $200,000 | $126,650 |
| 0040 | Removal & disposal of existing pavement (2023000) | SY | 105 | $35.72 | $170.00 | $89.00 |
| 0050 | Removal & disposal of existing curb (2024100) | LF | 186 | $16.33 | $25.25 | $21.00 |
| 0060 | Removal of exist. guardrail (2027801) | LF | 15,306.25 | $1.43 | $2.30 | $2.60 |
| 0070 | Unclassified excavation (2031000) | CY | 860 | $55.30 | $125.00 | $34.00 |
| 0080 | Borrow excavation (2033000) | CY | 2,114 | $25.00 | $140.00 | $105.00 |
| 0090 | Station grading (2035000) | STA | 42.99 | $2,430.00 | $2,650.00 | $3,200.00 |
| 0100 | Maintenance stone (3059900) | TON | 202 | $81.75 | $165.00 | $100.00 |
| 0110 | Cement modified recycled base (10" unif)-curing method B (3063232) | SY | 26,107 | $8.85 | $11.05 | $10.25 |
| 0120 | Cement modified recycled base (12" unif)-curing method B (3063242) | SY | 112,970 | $8.15 | $10.45 | $9.00 |
| 0130 | Portland cement for cement modified recycled base course (3064000) | TON | 4,661.50 | $221.00 | $215.00 | $268.00 |
| 0140 | Liquid asphalt binder PG64-22 (4011004) | TON | 1,677.18 | $605.00 | $575.00 | $650.00 |
| 0150 | Full depth asph. pav. patching 10"unif (4012100) | SY | 310 | $184.00 | $230.00 | $320.00 |
| 0160 | Full depth asph. pav. patching 12"unif (4012120) | SY | 100 | $254.00 | $350.00 | $337.00 |
| 0170 | Full depth asph. pav. patching 14"unif (4012140) | SY | 700 | $174.00 | $165.00 | $149.00 |
| 0180 | Milling existing asphalt pavement 1.75" (4013117) | SY | 42,874 | $3.40 | $2.50 | $2.00 |
| 0190 | Milling existing asphalt pavement (variable) (4013990) | SY | 6,063 | $10.50 | $12.00 | $12.75 |
| 0191 | Asphalt base course - type B (4020320) | TON | 31.80 | $245.00 | $400.00 | $390.00 |
| 0200 | Asphalt intermediate course type C (4030330) | TON | 10,907.31 | $68.80 | $84.30 | $78.00 |
| 0210 | Asphalt surface course type B (4040320) | TON | 4,287.36 | $75.00 | $80.00 | $81.00 |
| 0220 | Asphalt surface course type C (4040340) | TON | 12,477.53 | $69.75 | $84.00 | $103.00 |
| 0230 | Driveway paving-surface type C (4047220) | TON | 1,556.75 | $178.11 | $190.00 | $255.00 |
| 0240 | Asphalt surface treat (single treatment) (4060010) | SY | 139,077 | $2.89 | $2.75 | $3.50 |
| 0250 | Traffic control (6011000) | LS | 1 | $440,000 | $544,001 | $1,070,000 |
| 0260 | Permanent construction signs (ground mounted) (6051120) | SF | 1,312 | $6.10 | $5.95 | $7.00 |
| 0270 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 7,256 | $0.14 | $0.15 | $0.16 |
| 0280 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 338,146 | $0.14 | $0.15 | $0.16 |
| 0290 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 390 | $0.10 | $0.10 | $0.12 |
| 0300 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 1,638 | $0.50 | $0.50 | $0.57 |
| 0310 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 28 | $5.00 | $5.05 | $5.85 |
| 0320 | White word message "only"- fast dry paint (6240035) | EACH | 28 | $5.00 | $5.05 | $5.85 |
| 0330 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 9,210 | $0.14 | $0.15 | $0.16 |
| 0340 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 335,997 | $0.14 | $0.15 | $0.16 |
| 0350 | 4" white broken lines -(gaps excluded) - epoxy paint slow cure (6261005) | LF | 80 | $5.00 | $5.05 | $5.85 |
| 0360 | 4" white solid lines (PVT. edge lines) epoxy paint slow cure (6261010) | LF | 280 | $4.00 | $4.05 | $4.70 |
| 0370 | 4" yellow broken lines(gaps exc) epoxy paint slow cure (6261105) | LF | 80 | $5.00 | $5.05 | $5.85 |
| 0380 | 4"yellow solid lines- PVT.edge&no passing zone - epoxy paint slow cure (6261110) | LF | 280 | $4.00 | $4.05 | $4.70 |
| 0390 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 3,690 | $0.75 | $0.75 | $0.85 |
| 0400 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 90,186 | $0.45 | $0.45 | $0.52 |
| 0410 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 195 | $2.85 | $2.90 | $3.25 |
| 0420 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 666 | $8.00 | $8.05 | $9.25 |
| 0430 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 14 | $100.00 | $100.50 | $117.00 |
| 0440 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 14 | $100.00 | $100.50 | $117.00 |
| 0450 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 6,770 | $0.45 | $0.45 | $0.52 |
| 0460 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 77,962 | $0.45 | $0.45 | $0.52 |
| 0470 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 200 | $6.00 | $6.05 | $7.00 |
| 0480 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 180 | $6.00 | $6.05 | $7.00 |
| 0490 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 887 | $6.00 | $6.05 | $7.00 |
| 0500 | Milled-in rumble strip (6321000) | MI | 19.92 | $500.00 | $1,425.00 | $1,275.00 |
| 0510 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 40 | $35.00 | $18.25 | $41.00 |
| 0520 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 520 | $5.00 | $1.20 | $5.75 |
| 0530 | Sawcut for loop detector (6780495) | LF | 200 | $18.00 | $9.95 | $21.00 |
| 0540 | Temporary adjustment of traffic signal equipment (6885993) | EACH | 1 | $25,000 | $10,825 | $29,000 |
| 0550 | 15" smooth wall pipe (7143615) | LF | 184 | $154.00 | $230.00 | $208.00 |
| 0560 | 18" smooth wall pipe (7143618) | LF | 64 | $139.00 | $310.00 | $266.00 |
| 0570 | 24" smooth wall pipe (7143624) | LF | 8 | $452.00 | $1,215.00 | $459.00 |
| 0580 | Cleaning existing pipe (7149999) | LF | 296 | $42.75 | $40.00 | $22.00 |
| 0590 | Concrete collar for UP to 24" pipe (7197052) | EACH | 1 | $2,400.00 | $5,875.00 | $3,250.00 |
| 0600 | Adjust catch basin (7197110) | EACH | 3 | $2,245.00 | $3,035.00 | $2,450.00 |
| 0610 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 181 | $32.65 | $105.00 | $58.75 |
| 0620 | Concrete sidewalk(4" uniform) (7204100) | SY | 22.50 | $81.64 | $330.00 | $111.00 |
| 0630 | Detectable warning material (7204900) | SF | 25 | $56.13 | $105.00 | $51.50 |
| 0640 | Pedestrian ramp construction (7209000) | SY | 50 | $112.25 | $330.00 | $223.00 |
| 0650 | Concrete class 4000 for partial depth deck patching (7260850) | SY | 112 | $3,182.00 | $915.00 | $2,450.00 |
| 0660 | Rehabilitate existing expansion joint - compression seal (7261121) | EACH | 2 | $12,728 | $360.00 | $41,000 |
| 0670 | Reseal deck expansion joint (7261127) | LF | 204 | $149.00 | $117.00 | $385.00 |
| 0680 | Rip-rap (class B) (8041020) | TON | 17 | $226.00 | $550.00 | $328.00 |
| 0690 | Geotextile for erosion control under riprap(class 2)type B (8048205) | SY | 20 | $117.00 | $75.00 | $68.00 |
| 0700 | Premash W-beam strong post system WSP3 (8051050) | LF | 1,525 | $22.81 | $20.25 | $23.50 |
| 0710 | MT3 leading end treatment TL3 (8051151) | EACH | 65 | $2,960.00 | $3,235.00 | $3,750.00 |
| 0720 | MB trailing end treatment (8051710) | EACH | 5 | $1,821.50 | $1,720.00 | $1,975.00 |
| 0730 | MGS3 GR standard shoulder (8052100) | LF | 3,750 | $24.34 | $20.25 | $23.50 |
| 0740 | MGS3CS GR compressed shoulder (8052150) | LF | 5,893.75 | $29.60 | $26.30 | $30.50 |
| 0750 | Premash trailing W-beam type B 12.5' (8052210) | EACH | 5 | $1,480.00 | $1,415.00 | $1,625.00 |
| 0760 | Premash W-beam compressed SHLDR 9' post (8053001) | LF | 687.50 | $30.11 | $26.26 | $30.50 |
| 0770 | Premash thriebeam bridge conn TBBC3 (8053250) | EACH | 8 | $2,960.00 | $2,930.00 | $3,400.00 |
| 0780 | Premash type T TL3 leading 50' (8057100) | EACH | 5 | $3,062.00 | $2,526.00 | $2,900.00 |
| 0790 | Reset fence (8071000) | LF | 528 | $20.41 | $20.20 | $47.00 |
| 0800 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 4.52 | $4,467.00 | $3,215.00 | $3,700.00 |