SCDOT contract 0276160 bid tabulation

2026 Aiken Rehab/PM. Let by South Carolina DOT on March 10, 2026, Aiken, District 7. 2 bids received; low bid $8,182,423 by Satterfield Construction Company, Inc..

Owner
South Carolina DOT
Letting
10 MAR 2026
Pay items
79
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Satterfield Construction Company, Inc.$8,182,423Low
2Blythe Construction, Inc.$8,389,398+3.0%
SCDOT contract 0276160: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Satterfield Construction Company, Inc.2. Blythe Construction, Inc.
0010Mobilization (1031000)LS1$450,000$355,000
0020Bonds and insurance (1032010)LS1$145,000$40,000
0030Removal & disposal of existing pavement (2023000)SY85$67.20$60.00
0040Removal & disposal of existing curb (2024100)LF40$33.60$30.00
0050Removal of exist. guardrail (2027801)LF4,285$1.00$1.00
0060Borrow excavation (2033000)CY2,612$58.00$106.10
0070Excavation for shoulder paving (2036000)STA350.59$52.00$66.50
0080Hauling of excavated shoulder material (2072000)STA350.59$80.00$74.65
0090Maintenance stone (3059900)TON44.33$68.00$52.50
0100HMA shoulder widening course (3104000)TON2,072.11$84.75$94.50
0110Liquid asphalt binder PG64-22 (4011004)TON1,919.99$675.00$589.00
0120Aramid fiber (4011500)LB7,515$71.00$59.20
0130Full depth asph. pav. patching 4" unif. (4012040)SY540$60.00$110.00
0140Full depth asph. pav. patching 6" unif. (4012060)SY1,620$63.00$73.30
0150Full depth asph. pav. patching 8" unif (4012080)SY3,290$69.95$86.10
0160Milling existing asphalt pavement 1.5" (4013115)SY9,080$4.00$6.40
0170Milling existing asphalt pavement 2.0" (4013120)SY168,880$2.90$4.70
0180Milling existing asphalt pavement (variable) (4013990)SY23,500$5.35$8.90
0190Asphalt surface course type B (4040320)TON27,057.47$88.00$89.50
0200Asphalt surface course type D (4040350)TON3,622.82$96.00$114.40
0210Driveway paving-surface type C (4047220)TON348$225.00$285.00
0220Driveway paving-surface type D (4047230)TON1,089.38$225.00$281.00
0230Traffic control (6011000)LS1$615,000$545,000
0240Permanent construction signs (ground mounted) (6051120)SF2,348$6.45$5.85
02504" white broken lines -(gaps excluded)-fast dry paint (6240005)LF20,860$0.12$0.11
02604" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF206,800$0.12$0.11
02706" white solid lines (PVT. edge lines)-fast dry paint (6240012)LF120$0.12$0.11
02808"white solid lines (crosswalk& channelization)fast dry paint (6240015)LF1,220$0.12$0.11
029024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF3,290$0.55$0.50
0300White single arrow (left, straight, right)-fast dry paint (6240030)EACH92$11.00$10.00
0310White single bike lane arrow (LT, straight, RT)-fast dry paint (6240031)EACH42$11.00$10.00
0320White word message "only"- fast dry paint (6240035)EACH28$11.00$10.00
0330White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040)EACH8$11.00$10.00
0340Bike lane symbol - fast dry paint (6240055)EACH26$11.00$10.00
03504" yellow broken lines(gaps exc) - fast dry paint (6240105)LF16,900$0.12$0.11
03604"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF243,420$0.12$0.11
03706" yellow solid line on curb/median - fast dry paint (6240112)LF1,425$1.10$1.00
038024" yellow diagonal lines - fast dry paint (6240115)LF1,000$0.55$0.50
03904" white broken lines(gaps excl.)perm.PVMT.marking (6251005)LF1,400$0.50$0.45
04006" white broken lines(gaps excl.)perm.PVMT.marking (6251007)LF600$0.88$0.80
04104" white solid lines (PVT. edge lines) perm.PVMT.marking (6251010)LF47,130$0.50$0.45
04206" white solid lines (PVT. edge lines) perm.PVMT.marking (6251012)LF23,930$1.00$0.90
04308" white solid lines perm.PVMT.markings (6251015)LF610$3.30$3.00
044024" white solid lines (stop/diag lines)- perm.PVMT.marking (6251025)LF1,550$9.90$9.00
0450White single arrows (LT, STRGHT, RT) perm.PVMT.marking (6251030)EACH44$71.50$65.00
0460White word message "only" - perm.PVMT.marking (6251035)EACH13$71.50$65.00
0470White word message "stop" - perm.PVMT.marking (6251039)EACH2$247.50$225.00
0480White combination arrows(STR&RT.or STR& LT)perm.PVMT.marking (6251040)EACH4$82.50$75.00
04904" yellow broken lines(gaps exc)perm.PVMT.marking (6251064)LF1,350$0.50$0.45
05004" yellow solid lines(PVT.edge lines) perm.PVMT.marking (6251074)LF85,850$0.50$0.45
051024" yellow solid lines - perm.PVMT.marking (6251080)LF500$11.00$10.00
05206" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007)LF8,430$1.00$0.90
05304" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF550$0.50$0.45
05406" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012)LF31,850$1.00$0.90
055024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF190$9.90$9.00
0560White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030)EACH2$71.50$65.00
0570White word message "only" - thermoplastic - 125 mil. (6271035)EACH1$71.50$65.00
05806" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271066)LF7,100$1.00$0.90
05904" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF710$0.46$0.42
06006" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271076)LF35,150$1.00$0.90
0610Evaluation of pavement marking retroreflectivity (6290001)LS1$6,050.00$5,500.00
0620Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH600$5.50$5.00
0630Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005)EACH730$5.50$5.00
0640Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH1,792$5.50$5.00
0650Milled-in rumble strip (6321000)MI16.17$764.50$1,055.38
0660Furnish & install 1.0" schedule 80 PVC conduit (6750275)LF140$33.00$17.75
0670Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413)LF10,200$3.30$1.35
0680Sawcut for loop detector (6780495)LF3,400$13.20$10.00
069013"X24"X12"D.elec.flush undgrd.enclosure- (STR.poly.conc.)HD (6800515)EACH5$3,850.00$880.00
0700Concrete curb and gutter(2'-0") sloping face (7203220)LF40$84.00$75.00
0710Concrete sidewalk(6" uniform) (7204600)SY10$145.60$130.00
0720Detectable warning material (7204900)SF37.50$84.00$75.00
0730Pedestrian ramp construction (7209000)SY75$224.00$200.00
0740MT3 leading end treatment TL3 (8051151)EACH12$3,301.10$3,000.00
0750MB trailing end treatment (8051710)EACH4$1,965.00$1,500.00
0760MGS3 GR standard shoulder (8052100)LF350$32.75$23.75
0770MGS3CS GR compressed shoulder (8052150)LF3,350$37.15$31.00
0780MTBBC3 MASH thrie-beam barrier connector TL3 (8053253)EACH4$3,632.86$2,000.00
0790Permanent grassing for non-permitted resurfacing projects (8100102)ACRE11.89$3,410.00$3,300.00
SCDOT contract 0276160: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of March 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy