SCDOT contract 3177790 bid tabulation

2027 Lee Pavement Improvement with CTC. Let by South Carolina DOT on September 9, 2026, Lee, District 1. 3 bids received; low bid $5,476,159 by C.R. Jackson, Inc..

Owner
South Carolina DOT
Letting
09 SEP 2026
Pay items
39
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.R. Jackson, Inc.$5,476,159Low
2Truerock Construction, LLC$5,881,642+7.0%
3Palmetto Corp. of Conway$6,101,906+11%
SCDOT contract 3177790: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.R. Jackson, Inc.2. Truerock Construction, LLC3. Palmetto Corp. of Conway
0010Mobilization (1031000)LS1$87,000$275,000$205,000
0020Bonds and insurance (1032010)LS1$108,000$100,000$120,000
0030Borrow excavation (2033000)CY2,858$40.00$33.00$50.50
0040Excavation for shoulder paving (2036000)STA704.30$63.00$60.00$36.15
0050Hauling of excavated shoulder material (2072000)STA704.30$28.50$50.00$67.50
0060Maintenance stone (3059900)TON41.25$64.00$20.00$160.00
0070HMA shoulder widening course (3104000)TON3,521.76$74.00$80.00$74.95
0080Liquid asphalt binder PG64-22 (4011004)TON2,027.01$765.00$715.00$770.00
0090Full depth asph. pav. patching 6" unif. (4012060)SY1,515$75.00$70.00$78.90
0100Full depth asph. pav. patching 8" unif (4012080)SY2,610$73.00$80.00$81.50
0110Milling existing asphalt pavement 2.0" (4013120)SY139,220$1.60$2.75$2.20
0120Milling existing asphalt pavement (variable) (4013990)SY3,050$2.40$6.00$13.05
0130Asphalt intermediate course type B (4030320)TON8,025.47$70.00$75.00$73.10
0140Asphalt surface course type B (4040320)TON8,235.47$70.00$75.00$80.35
0150Asphalt surface course type C (4040340)TON13,743.47$70.00$75.00$75.85
0160Driveway paving-surface type C (4047220)TON1,567.50$165.00$200.00$180.00
0170Traffic control (6011000)LS1$120,000$34,100$200,225
0180Permanent construction signs (ground mounted) (6051120)SF1,672$5.70$6.00$5.70
0190Pave. mark.(temp- paint)12INX18IN white triangle yield bar (609130M)LF60$10.00$5.00$10.00
02004" white broken lines -(gaps excluded)-fast dry paint (6240005)LF4,370$0.12$0.12$0.12
02104" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF425,200$0.11$0.12$0.11
022024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF2,380$1.00$1.00$1.00
0230White single arrow (left, straight, right)-fast dry paint (6240030)EACH8$30.00$10.00$30.00
0240White word message "only"- fast dry paint (6240035)EACH8$35.00$10.00$35.00
02504" yellow broken lines(gaps exc) - fast dry paint (6240105)LF33,200$0.12$0.12$0.12
02604"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF251,165$0.11$0.12$0.11
02706" yellow solid line on curb/median - fast dry paint (6240112)LF820$2.50$2.00$2.50
02804" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF1,305$0.46$1.00$0.46
02904" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF150,440$0.44$0.45$0.44
030012IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023)LF115$30.00$25.00$30.00
031024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF785$12.00$8.00$12.00
0320White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030)EACH3$125.00$100.00$125.00
0330White word message "only" - thermoplastic - 125 mil. (6271035)EACH3$135.00$100.00$135.00
03404" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064)LF12,280$0.46$0.45$0.46
03504" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF89,855$0.44$0.45$0.44
0360Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH5$4.00$6.50$4.00
0370Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH1,040$4.00$6.50$4.00
0380Milled-in rumble strip (6321000)MI11.95$500.00$815.00$500.00
0390Permanent grassing for non-permitted resurfacing projects (8100102)ACRE13.80$3,300.00$3,450.00$3,400.00
SCDOT contract 3177790: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of September 9, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy