SCDOT contract 1374080 bid tabulation

2026 Chesterfield Pavement Improvement. Let by South Carolina DOT on March 10, 2026, Chesterfield, District 4. 3 bids received; low bid $5,659,514 by C.R. Jackson, Inc..

Owner
South Carolina DOT
Letting
10 MAR 2026
Pay items
40
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.R. Jackson, Inc.$5,659,514Low
2Truerock Construction, LLC$5,665,5360.0%
3Lci-Lineberger Construction, Inc.$6,372,063+13%
SCDOT contract 1374080: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.R. Jackson, Inc.2. Truerock Construction, LLC3. Lci-Lineberger Construction, Inc.
0010Mobilization (1031000)LS1$140,500$225,000$25,000
0020Bonds and insurance (1032010)LS1$31,500$80,000$45,000
0030Removal of exist. guardrail (2027801)LF7,877$1.00$1.00$1.68
0040Borrow excavation (2033000)CY1,262$63.00$35.00$53.36
0050Maintenance stone (3059900)TON50$122.00$70.00$98.79
0060Liquid asphalt binder PG64-22 (4011004)TON2,148.30$610.50$550.00$610.00
0070Full depth asph. pav. patching 12"unif (4012120)SY5,000$98.75$90.00$110.00
0080Milling existing asphalt pavement 1.75" (4013117)SY193,669$1.75$2.25$2.91
0090Milling existing asphalt pavement (variable) (4013990)SY1,000$11.25$23.00$10.09
0100Asphalt intermediate course type B (4030320)TON19,367.04$66.00$65.00$79.38
0110Asphalt surface course type B (4040320)TON19,367.04$67.00$65.00$75.63
0120Asphalt surface course type C (4040340)TON90$197.50$130.00$176.70
0130Driveway paving-surface type C (4047220)TON502$162.00$175.00$176.70
0140Traffic control (6011000)LS1$160,000$195,500$156,159
0150Permanent construction signs (ground mounted) (6051120)SF584$6.00$7.62$8.49
01604" white broken lines -(gaps excluded)-fast dry paint (6240005)LF414,200$0.01$0.01$0.10
01704" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF493,376$0.10$0.10$0.10
01806" white solid lines (PVT. edge lines)-fast dry paint (6240012)LF902$0.25$0.25$0.26
019024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF1,095$1.25$1.25$1.30
0200White single arrow (left, straight, right)-fast dry paint (6240030)EACH22$10.00$10.00$10.43
0210White word message "only"- fast dry paint (6240035)EACH14$10.00$10.00$10.43
02206" yellow solid line on curb/median - fast dry paint (6240112)LF330$1.00$1.00$1.04
02304" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF13,810$1.25$1.25$1.30
02404" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF106,444$0.42$0.42$0.44
02506" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012)LF902$1.25$1.25$1.30
026024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF1,095$8.50$8.50$8.86
0270White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030)EACH22$100.00$100.00$104.26
0280White word message "only" - thermoplastic - 125 mil. (6271035)EACH14$100.00$100.00$104.26
0290Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH700$7.50$7.50$7.82
0300Milled-in rumble strip (6321000)MI20.16$620.00$620.00$1,352.92
0310Reseal deck expansion joint (7261127)LF180$115.00$100.00$145.97
0320Premash W-beam strong post system WSP3 (8051050)LF2,537.50$19.50$19.50$24.58
0330MT3 leading end treatment TL3 (8051151)EACH11$3,200.00$3,200.00$3,352.40
0340MB trailing end treatment (8051710)EACH11$1,750.00$1,750.00$1,899.69
0350MGS3 GR standard shoulder (8052100)LF3,600$20.50$20.50$25.98
0360Premash trailing W-beam type B 12.5' (8052210)EACH2$1,250.00$1,250.00$1,620.33
0370Premash thriebeam bridge conn TBBC3 (8053250)EACH8$2,100.00$2,100.00$3,240.65
0380Premash impact attenuator IA class D3 (8056501)EACH1$7,500.00$7,500.00$10,728
0390Premash type T TL3 leading 50' (8057100)EACH4$2,500.00$2,500.00$3,352.40
0400Permanent grassing for non-permitted resurfacing projects (8100102)ACRE4.89$3,150.00$3,150.00$3,284.25
SCDOT contract 1374080: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of March 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy