SCDOT contract 4257070 bid tabulation
Intersection Safety Improvement. Let by South Carolina DOT on October 14, 2025, Spartanburg, District 3. 4 bids received; low bid $2,296,925 by S and S Construction, Inc. of Anderson.
- Owner
- South Carolina DOT
- Letting
- 14 OCT 2025
- Pay items
- 92
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S and S Construction, Inc. of Anderson | $2,296,925 | Low |
| 2 | Civil Pros Inc | $2,457,330 | +7.0% |
| 3 | Universal Civil Construction, LLC | $2,683,552 | +17% |
| 4 | Reeves Construction Company | $3,244,846 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S and S Construction, Inc. of Anderson | 2. Civil Pros Inc | 3. Universal Civil Construction, LLC | 4. Reeves Construction Company |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $65,600 | $130,000 | $134,000 | $165,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $25,000 | $80,000 | $80,000 | $40,175 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $18,331 | $30,000 | $40,000 | $22,500 |
| 0040 | CPM progress schedule (1080300) | LS | 1 | $3,850.00 | $7,500.00 | $4,250.00 | $17,825 |
| 0050 | Clearing & grubbing within roadway (2012000) | LS | 1 | $32,650 | $15,000 | $50,000 | $26,000 |
| 0060 | Removal & disposal of existing asphalt pavement (2025000) | SY | 2,950 | $8.63 | $6.30 | $10.00 | $19.00 |
| 0070 | Site excavation (2031200) | LS | 1 | $186,500 | $230,000 | $213,000 | $275,000 |
| 0080 | Fine grading (2081001) | SY | 4,600 | $10.00 | $5.00 | $7.75 | $8.00 |
| 0090 | Flowable fill (2103000) | CY | 30 | $360.00 | $300.00 | $285.00 | $700.00 |
| 0100 | Maintenance stone (3059900) | TON | 500 | $42.50 | $55.00 | $58.00 | $105.00 |
| 0110 | Liquid asphalt binder PG64-22 (4011004) | TON | 187 | $770.00 | $775.00 | $655.00 | $725.00 |
| 0120 | Full depth asph. pav. patching 3" unif. (4012030) | SY | 46 | $200.00 | $70.00 | $48.25 | $375.00 |
| 0130 | Full depth asph. pav. patching 8" unif (4012080) | SY | 500 | $135.00 | $87.60 | $63.00 | $128.00 |
| 0140 | Milling existing asphalt pavement (variable) (4013990) | SY | 2,120 | $11.50 | $8.00 | $7.75 | $29.00 |
| 0150 | Asphalt base course - type A (4020310) | TON | 1,812 | $145.00 | $140.00 | $147.00 | $135.00 |
| 0160 | Asphalt intermediate course type B (4030320) | TON | 599 | $148.00 | $150.00 | $149.25 | $224.00 |
| 0170 | Asphalt surface course type B (4040320) | TON | 871 | $155.00 | $172.25 | $151.50 | $182.00 |
| 0180 | Asphalt surface course type E (4040360) | TON | 192 | $165.00 | $183.75 | $157.25 | $490.00 |
| 0190 | Portland cement conc. pav. 8" uniform (5011100) | SY | 215 | $155.00 | $160.00 | $163.25 | $250.00 |
| 0200 | Stained concrete pavement (8" uniform) (5019010) | SY | 750 | $209.00 | $175.00 | $214.00 | $240.00 |
| 0210 | Traffic control (6011000) | LS | 1 | $88,650 | $200,000 | $315,000 | $280,000 |
| 0220 | Barricade - type III (6041200) | LF | 93 | $38.00 | $29.70 | $28.00 | $31.00 |
| 0230 | Permanent construction signs (ground mounted) (6051120) | SF | 496 | $9.00 | $11.10 | $10.50 | $8.70 |
| 0240 | Permanent construction signs (barricade mounted) (6051125) | SF | 70 | $10.00 | $9.00 | $7.90 | $11.00 |
| 0250 | Type B - flashing light (608100B) | EACH | 16 | $160.00 | $94.20 | $88.75 | $170.00 |
| 0260 | Pavement markings(temporary-paint)-4" white solid lines (609115A) | LF | 12,210 | $0.22 | $0.22 | $0.16 | $0.19 |
| 0270 | Pavement markings(temporary-paint)-4" yellow solid lines (609115B) | LF | 20,140 | $0.18 | $0.18 | $0.16 | $0.19 |
| 0280 | Pavement markings(temporary-paint)-8" white solid lines (609125A) | LF | 500 | $1.20 | $1.20 | $0.53 | $0.19 |
| 0290 | Pavement markings(temporary-paint)- 24"white solid lines (609135A) | LF | 108 | $1.90 | $1.80 | $1.05 | $1.90 |
| 0300 | Pavement markings (temporary paint) 24"X36" white triangle yield bar (609138A) | LF | 128 | $3.00 | $3.00 | $2.10 | $6.35 |
| 0310 | Temporary yellow pavement markers BI-dir.- 4"X4" (6092155) | EACH | 62 | $8.50 | $8.40 | $10.45 | $9.50 |
| 0320 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 670 | $0.65 | $0.60 | $1.05 | $1.25 |
| 0330 | 8" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271008) | LF | 70 | $5.00 | $4.80 | $4.20 | $6.35 |
| 0340 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 2,415 | $1.00 | $1.02 | $0.80 | $0.95 |
| 0350 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 120 | $5.00 | $4.80 | $4.20 | $3.00 |
| 0360 | 24IN X 36IN white triang. yield bar (gaps exc)thermo-125MIL (6271024) | LF | 64 | $11.55 | $12.00 | $10.50 | $25.00 |
| 0370 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 6,380 | $1.00 | $1.02 | $0.80 | $0.95 |
| 0380 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 12 | $8.50 | $8.40 | $10.50 | $9.50 |
| 0390 | Removal of pavement markings (6319505) | LF | 6,000 | $1.59 | $1.20 | $1.05 | $1.25 |
| 0400 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 102 | $28.00 | $30.90 | $27.00 | $32.00 |
| 0410 | Reflective sign post panels (6531500) | LF | 112 | $8.50 | $13.19 | $11.50 | $9.50 |
| 0420 | Square tubing post 12 gauge - 2" X 2" X 8 (6551115) | LF | 224 | $11.00 | $19.50 | $21.50 | $12.00 |
| 0430 | Design & installation of rdwy. lighting electrical system 001 (6581000) | EACH | 1 | $85,000 | $85,600 | $100,000 | $100,000 |
| 0440 | SGL.light STD.35'HT.AL.pole- incl top tenon MT. (6581145) | EACH | 8 | $15,000 | $10,700 | $16,500 | $12,725 |
| 0450 | Aluminum pipe handrailing (7055020) | LF | 125 | $300.00 | $200.00 | $140.00 | $335.00 |
| 0460 | Mech. stab.earth retaining wall backfill(stone) (7137007) | CY | 25 | $75.00 | $107.17 | $215.00 | $130.00 |
| 0470 | Mech.stabilized earth retaining wall(block facing) roadway (7137120) | SF | 380 | $60.00 | $87.12 | $29.50 | $100.00 |
| 0480 | Coping for MSE retaining wall(roadway) (7137190) | LF | 125 | $15.00 | $12.00 | $13.50 | $43.00 |
| 0490 | Geomembrane (7137901) | SY | 847 | $3.00 | $6.00 | $4.10 | $20.00 |
| 0500 | 18" smooth wall pipe (7143618) | LF | 941 | $120.00 | $110.00 | $105.00 | $165.00 |
| 0510 | 24" smooth wall pipe (7143624) | LF | 175 | $131.00 | $130.00 | $137.00 | $230.00 |
| 0520 | 30" smooth wall pipe (7143630) | LF | 30 | $200.00 | $150.00 | $162.50 | $365.00 |
| 0530 | Catch basin -type 1 CB - type 1 (7191005) | EACH | 4 | $4,000.00 | $6,000.00 | $6,250.00 | $7,100.00 |
| 0540 | Catch basin -type 9 (7191205) | EACH | 2 | $4,000.00 | $6,000.00 | $5,425.00 | $7,100.00 |
| 0550 | Catch basin -type 16 (7191605) | EACH | 4 | $7,500.00 | $7,200.00 | $8,225.00 | $8,000.00 |
| 0560 | Drop inlet (24" X 24") (7192010) | EACH | 1 | $3,500.00 | $6,000.00 | $5,850.00 | $8,175.00 |
| 0570 | Drop inlet (24" X 36") (7192020) | EACH | 1 | $3,560.00 | $6,000.00 | $5,850.00 | $9,135.00 |
| 0580 | Manhole (7192105) | EACH | 4 | $4,000.00 | $6,000.00 | $5,475.00 | $5,300.00 |
| 0590 | 4' slope flume (6" curb style with cutoffs) (7199200) | LF | 200 | $250.00 | $160.00 | $288.00 | $295.00 |
| 0600 | Concrete curb (9" X 15") (7201000) | LF | 190 | $66.00 | $48.00 | $73.50 | $86.00 |
| 0610 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 1,750 | $39.00 | $40.00 | $45.50 | $56.00 |
| 0620 | Concrete median (7206000) | SY | 270 | $125.00 | $125.00 | $133.00 | $159.00 |
| 0630 | Bituminous curb (7211000) | LF | 125 | $120.00 | $20.00 | $53.00 | $68.00 |
| 0640 | Rip-rap (class B) (8041020) | TON | 370 | $89.50 | $110.00 | $110.00 | $185.00 |
| 0650 | Geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 252 | $4.29 | $6.00 | $7.50 | $14.50 |
| 0660 | MT2 leading end treatment TL2 (8051155) | EACH | 2 | $2,850.00 | $2,997.00 | $3,960.00 | $4,500.00 |
| 0670 | MGS3 GR standard shoulder (8052100) | LF | 337.50 | $28.50 | $30.24 | $21.00 | $23.50 |
| 0680 | Right of way marker(rebar and cap) (8091010) | EACH | 26 | $160.00 | $150.00 | $225.25 | $190.00 |
| 0690 | Right of way plat (8091050) | LS | 1 | $4,000.00 | $2,500.00 | $5,070.00 | $3,180.00 |
| 0700 | Permanent cover (8100100) | ACRE | 2 | $3,000.00 | $3,600.00 | $2,215.00 | $1,900.00 |
| 0710 | Temporary cover (8100200) | ACRE | 4 | $900.00 | $1,380.00 | $1,580.00 | $1,200.00 |
| 0720 | Seeding - eragrostis curvula - weeping lovegrass (8102520) | MSY | 0.28 | $5,000.00 | $2,700.00 | $2,775.00 | $8,000.00 |
| 0730 | Fertilizer (nitrogen) (8104005) | LB | 139 | $2.00 | $1.80 | $1.65 | $2.45 |
| 0740 | Fertilizer (phosphoric acid) (8104010) | LB | 139 | $2.00 | $1.80 | $1.65 | $2.45 |
| 0750 | Fertilizer (potash) (8104015) | LB | 139 | $2.00 | $1.80 | $1.65 | $2.45 |
| 0760 | Agricultural granular lime (8105005) | LB | 600 | $1.00 | $0.48 | $0.85 | $1.20 |
| 0770 | Selective watering (8109050) | GAL | 54,300 | $0.02 | $0.01 | $0.02 | $0.09 |
| 0780 | Mowing (8109901) | ACRE | 12 | $1.00 | $200.00 | $350.00 | $550.00 |
| 0790 | Double-shredded hardwood mulch (8110220) | SF | 315 | $10.00 | $4.00 | $2.05 | $6.25 |
| 0800 | Muhlenbergia capillaris (pink muhly grass) #1 cont. (8111445) | EACH | 35 | $100.00 | $18.00 | $26.00 | $50.00 |
| 0810 | Turf reinforcement matting (TRM) type 1 (8151101) | MSY | 0.84 | $2,500.00 | $4,200.00 | $4,015.00 | $6,900.00 |
| 0820 | Temporary erosion control blanket (ecb) (8151110) | MSY | 1.19 | $1,789.00 | $1,620.00 | $1,830.00 | $2,900.00 |
| 0830 | Inlet structure filter - type F (weighted) (8152004) | LF | 176 | $11.88 | $15.50 | $9.40 | $14.00 |
| 0840 | Inlet structure filter- type F (non-weighted) (8152006) | LF | 176 | $11.88 | $14.00 | $9.40 | $14.00 |
| 0850 | Sediment tubes for ditch checks (8152007) | LF | 189 | $11.88 | $17.00 | $9.00 | $14.00 |
| 0860 | Silt fence (8153000) | LF | 1,145 | $3.60 | $3.60 | $4.50 | $4.25 |
| 0870 | Cleaning silt basins (8154010) | CY | 952 | $1.00 | $10.00 | $2.50 | $35.00 |
| 0880 | Inlet filter cleaning (8154155) | EACH | 44 | $1.00 | $40.00 | $91.50 | $250.00 |
| 0890 | Inlet structure filter - type B (8156210) | EACH | 1 | $200.00 | $150.00 | $388.00 | $375.00 |
| 0900 | Inlet structure filter - type D2 (8156215) | EACH | 2 | $366.00 | $175.00 | $555.00 | $900.00 |
| 0910 | Filter material for inlet structure filter - type D2 (8156217) | EACH | 2 | $45.00 | $75.00 | $555.00 | $450.00 |
| 0920 | Stabilized construction entrance (8156490) | SY | 550 | $16.00 | $11.00 | $18.00 | $33.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.