Lee Construction Company of the: SCDOT bid record
Lee Construction Company of the submitted 25 bids on South Carolina DOT contracts in the data, from 08 MAR 2022 to 11 AUG 2026, and was the low bidder on 4 of them (16%). When it was not low, its total sat a median +53% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $22,909,710
- Latest bid
- 11 AUG 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 3 | 0 | 0% |
| 2023 | 10 | 0 | 0% |
| 2024 | 7 | 1 | 14% |
| 2025 | 4 | 3 | 75% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 12 | 1 | 8% |
| District 5 | 5 | 1 | 20% |
| District 1 | 2 | 1 | 50% |
| District 7 | 1 | 0 | 0% |
| District 3 | 1 | 0 | 0% |
| District 2 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquid asphalt binder PG64-22 | 4011004 | TON | 18 | 9 (50%) | $740.00 | $715.00 |
| Permanent yellow pavement markers BI-dir.- 4"X4" | 6301100 | EACH | 14 | 9 (64%) | $10.00 | $6.50 |
| Type B - flashing light | 608100B | EACH | 16 | 8 (50%) | $97.50 | $125.00 |
| Mowing | 8109901 | ACRE | 12 | 8 (67%) | $500.00 | $500.00 |
| Unclassified excavation | 2031000 | CY | 13 | 7 (54%) | $25.00 | $42.80 |
| Elastomeric bearing | 7243100 | EACH | 13 | 7 (54%) | $250.00 | $600.00 |
| 4" white solid lines (PVT. edge lines) thermo.- 90 mil. | 6271010 | LF | 11 | 7 (64%) | $1.00 | $0.54 |
| Removal & disposal of existing asphalt pavement | 2025000 | SY | 10 | 7 (70%) | $13.00 | $17.00 |
| Compost | 8101105 | CY | 9 | 7 (78%) | $20.00 | $37.00 |
| Rip-rap (class B) | 8041020 | TON | 15 | 6 (40%) | $115.00 | $118.00 |
| Barricade - type 3 | 6041200 | LF | 15 | 6 (40%) | $35.00 | $35.00 |
| Silt fence | 8153000 | LF | 14 | 6 (43%) | $4.38 | $4.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dane Construction, LLC | 19 | 12 of 19 |
| United Infrastructure Group, Inc. | 16 | 11 of 16 |
| Reeves Construction Company | 15 | 12 of 15 |
| Cekra, Inc. | 13 | 10 of 13 |
| Southern Road & Bridge, LLC | 11 | 1 of 11 |
| Dellinger, Inc. | 9 | 7 of 9 |
| Republic Contracting Corporation | 5 | 2 of 5 |
| Ipc Paving LLC | 5 | 4 of 5 |
| Saffo Contractors, Inc. | 4 | 2 of 4 |
| NHM Constructors, Inc. | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 AUG 2026 | 4672240 | District 4 | SC 274 NB over Big Allison Creek Bridge Repair - York County | 5 of 6 | $3,413,480 | +54% |
| 09 DEC 2025 | 3470990 | District 5 | S-87 (Shannon Rd.) Bridge Replacement over Smith Swamp | 1 of 4 | $3,758,060 | Low, 4.0% under the second |
| 09 DEC 2025 | 4466010 | District 4 | S-16 (Sardis Rd.) over Tyger River Bridge Replacement | 8 of 9 | $14,391,657 | +71% |
| 12 NOV 2025 | 2074200 | District 4 | SC 200 Bridge Replacement over Minton Creek - Asset ID 278 | 1 of 10 | $5,797,696 | Low, 2.0% under the second |
| 11 MAR 2025 | 2470940 | District 2 | S-24-39 over Saluda River in Greenwood County Bridge Repair | 1 of 6 | $1,450,498 | Low, 5.0% under the second |
| 13 NOV 2024 | 4569090 | District 5 | S-45-33 (New Zion Rd) over Kingstree Swamp, 2021 CL/LR Program, Rank: 2021-14 | 3 of 6 | $460,250 | +18% |
| 13 AUG 2024 | 3249691 | District 1 | Bridge Replacement-US 21 over Congaree Creek | 1 of 6 | $11,903,456 | Low, 13% under the second |
| 11 JUN 2024 | 2968580 | District 4 | S-195 (New Cut Church Rd) Bridge Replacement over Camp Creek | 5 of 7 | $2,396,519 | +15% |
| 14 MAY 2024 | 1164110 | District 4 | S-49 (River Drive) over Cherokee Creek Bridge Replacement | 3 of 4 | $1,622,607 | +26% |
| 12 MAR 2024 | 2863960 | District 1 | S-349 BRO Sandy Branch, Kershaw Co | 6 of 6 | $2,448,483 | +20% |
| 13 FEB 2024 | 2649280 | District 5 | Horry S-472 Bridge Replacement over Kingston Lake | 4 of 4 | $2,571,520 | +10% |
| 09 JAN 2024 | 2059640 | S-258 (Blink Bonnie Rd) Bridge Replacement over Thorntree Cr | 5 of 5 | $2,632,140 | +34% | |
| 12 DEC 2023 | 3559650 | District 5 | Rehabilitation - S-165 (Marlboro Co) | 2 of 3 | $2,841,436 | +20% |
| 12 DEC 2023 | 3764160 | District 3 | S-258 over Village Creek Bridge Replacement | 4 of 4 | $2,283,985 | +61% |
| 14 NOV 2023 | 3666720 | District 2, Package 5 Bridge Repairs | 7 of 8 | $1,891,143 | +90% | |
| 14 NOV 2023 | 8866650 | District 2, Package 4 Bridge Repairs | 7 of 9 | $4,877,762 | +53% | |
| 08 AUG 2023 | 1263381 | District 4 | Bridge Preservation - US 21 (Chester Co) | 3 of 5 | $2,276,634 | +37% |
| 09 MAY 2023 | 5463542 | District 4 | Bridge Rehabilitation - District 4 | 8 of 9 | $3,711,315 | +65% |
| 14 MAR 2023 | 5463930 | District 4 | Bridge Maintenance - District 4 | 4 of 7 | $3,728,268 | +53% |
| 14 MAR 2023 | 5463940 | District 4 | Bridge Maintenance - District 4 | 7 of 8 | $3,299,947 | +107% |
| 14 FEB 2023 | 1264200 | District 4 | Bridge Repair - SC 97 (Turkey Creek) | 4 of 9 | $497,900 | +16% |
| 14 FEB 2023 | 4464150 | District 4 | Bridge Repairs - S-18 (Padgetts Creek) | 8 of 9 | $1,442,869 | +67% |
| 13 DEC 2022 | 5763560 | District 7 | Bridge Rehabilitation - District 7 | 4 of 5 | $1,703,125 | +91% |
| 12 JUL 2022 | 3562640 | District 5 | Bridge Maintenance - US1/ SC 9 (Great Pee Dee River) | 4 of 5 | $8,309,261 | +53% |
| 08 MAR 2022 | 1252450 | District 4 | Bridge Replacement - SC 901 (Rocky Creek) | 4 of 7 | $4,296,103 | +10% |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.