SCDOT contract 3470990 bid tabulation
S-87 (Shannon Rd.) Bridge Replacement over Smith Swamp. Let by South Carolina DOT on December 9, 2025, Marion, District 5. 4 bids received; low bid $3,758,060 by Lee Construction Company of the.
- Owner
- South Carolina DOT
- Letting
- 09 DEC 2025
- Pay items
- 96
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lee Construction Company of the | $3,758,060 | Low |
| 2 | Cape Romain Contractors, Inc. | $3,891,973 | +4.0% |
| 3 | R.E. Goodson Construction Co., Inc. | $4,277,836 | +14% |
| 4 | Dane Construction, LLC | $4,893,440 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lee Construction Company of the | 2. Cape Romain Contractors, Inc. | 3. R.E. Goodson Construction Co., Inc. | 4. Dane Construction, LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $185,000 | $194,782 | $178,204 | $244,000 |
| 0020 | Bridge construction access (1031200) | LS | 1 | $300,000 | $57,334 | $38,511 | $265,000 |
| 0030 | Bonds and insurance (1032010) | LS | 1 | $75,000 | $42,317 | $83,163 | $146,000 |
| 0040 | Construction stakes, lines & grades (1050800) | EACH | 1 | $30,000 | $51,244 | $155,000 | $11,000 |
| 0050 | Small public water relocation no. ____ 1 (1052100) | EACH | 1 | $136,000 | $165,393 | $127,326 | $136,000 |
| 0060 | Large public water relocation no. ____ 1 (1052110) | EACH | 1 | $175,000 | $212,822 | $198,353 | $175,000 |
| 0070 | Large public sewer relocation no. ____ 1 (1052210) | EACH | 1 | $215,000 | $261,467 | $157,275 | $215,000 |
| 0080 | CPM progress schedule (1080300) | LS | 1 | $24,000 | $41,132 | $8,000.00 | $10,000 |
| 0090 | Clearing & grubbing within right of way (2011000) | LS | 1 | $205,000 | $119,700 | $767,028 | $266,335 |
| 0100 | Removal & disposal of existing pavement (2023000) | SY | 235 | $10.00 | $12.16 | $45.00 | $10.00 |
| 0110 | Removal of exist. guardrail (2027801) | LF | 120 | $17.00 | $20.07 | $4.00 | $3.00 |
| 0120 | Removal & disposal of existing bridge (2028100) | LS | 1 | $200,000 | $85,776 | $153,901 | $240,000 |
| 0130 | Unclassified excavation (2031000) | CY | 1,077 | $28.50 | $34.66 | $25.00 | $17.00 |
| 0140 | Borrow excavation (2033000) | CY | 9,114 | $28.50 | $34.66 | $32.50 | $28.50 |
| 0150 | Muck excavation (2034000) | CY | 50 | $55.25 | $67.20 | $250.00 | $55.25 |
| 0160 | Geotextile, separation (2036020) | SY | 246 | $9.45 | $11.49 | $10.00 | $9.45 |
| 0170 | Geogrid reinforcement (uniaxial) (2037000) | SY | 1,865 | $8.50 | $10.34 | $15.00 | $8.50 |
| 0180 | Geogrid stabilization (2037030) | SY | 246 | $20.65 | $25.11 | $15.00 | $20.65 |
| 0190 | Stone bridge lift material (2052010) | TON | 200 | $150.00 | $182.42 | $125.00 | $150.00 |
| 0200 | Fine grading (2081001) | SY | 5,084 | $3.10 | $3.77 | $3.00 | $3.10 |
| 0210 | Flowable fill (2103000) | CY | 40 | $350.00 | $425.64 | $500.00 | $350.00 |
| 0220 | Maintenance stone (3059900) | TON | 63 | $132.00 | $160.53 | $125.00 | $132.00 |
| 0230 | Liquid asphalt binder PG64-22 (4011004) | TON | 91 | $685.00 | $833.05 | $685.00 | $685.00 |
| 0240 | Full depth asph. pav. patching 10"unif (4012100) | SY | 100 | $150.00 | $182.42 | $150.00 | $150.00 |
| 0250 | Milling existing asphalt pavement 1.5" (4013115) | SY | 222 | $45.00 | $54.73 | $45.00 | $45.00 |
| 0260 | Milling existing asphalt pavement (variable) (4013990) | SY | 400 | $25.00 | $30.41 | $25.00 | $25.00 |
| 0270 | Asphalt base course - type B (4020320) | TON | 911 | $105.00 | $127.69 | $105.00 | $105.00 |
| 0280 | Asphalt intermediate course type C (4030330) | TON | 461 | $78.00 | $94.85 | $78.00 | $78.00 |
| 0290 | Asphalt surface course type C (4040340) | TON | 426 | $78.00 | $94.85 | $78.00 | $78.00 |
| 0300 | Traffic control (6011000) | LS | 1 | $21,000 | $58,743 | $134,850 | $26,000 |
| 0310 | Barricade - type III (6041200) | LF | 84 | $89.00 | $108.23 | $30.00 | $89.00 |
| 0320 | Permanent construction signs (ground mounted) (6051120) | SF | 248 | $8.50 | $10.34 | $8.00 | $8.50 |
| 0330 | Permanent construction signs (barricade mounted) (6051125) | SF | 70 | $9.55 | $11.61 | $9.00 | $9.55 |
| 0340 | Construction zone electric changeable message sign (trailer (6062000) | EACH | 2 | $22,900 | $27,849 | $6,000.00 | $22,900 |
| 0350 | Type B - flashing light (608100B) | EACH | 16 | $135.00 | $164.18 | $125.00 | $188.52 |
| 0360 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 3,100 | $1.05 | $1.28 | $1.00 | $1.05 |
| 0370 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 75 | $15.90 | $19.34 | $15.00 | $15.90 |
| 0380 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 3,200 | $1.05 | $1.28 | $1.00 | $1.05 |
| 0390 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 30 | $7.95 | $9.67 | $7.50 | $7.95 |
| 0400 | Milled-in rumble strip (6321000) | MI | 0.51 | $1,100.00 | $1,337.74 | $4,000.00 | $1,100.00 |
| 0410 | Pref.flex.retro.PVMT.mark(T- 1)perm.(60MIL)4"WH.solid (6351150) | LF | 300 | $5.30 | $6.45 | $5.00 | $5.30 |
| 0420 | Pref.flex.retro.PVMT.mark(T- 1)perm.(60MIL)4"yel.sol. (6351450) | LF | 300 | $5.30 | $6.45 | $5.00 | $5.30 |
| 0430 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 18 | $15.90 | $19.34 | $15.00 | $15.90 |
| 0440 | U-section post for sign supports - 2P (6531205) | LF | 44 | $9.05 | $11.01 | $8.50 | $9.05 |
| 0450 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 644 | $12.00 | $22.54 | $9.00 | $37.68 |
| 0460 | Conc. for structures - class 4000 (7011400) | CY | 406.40 | $1,000.00 | $1,454.49 | $1,450.00 | $2,600.00 |
| 0470 | Grooved surface finish (7023200) | SY | 439 | $10.00 | $35.50 | $18.00 | $14.00 |
| 0480 | Reinf. steel for structures (bridge) (7031200) | LB | 101,444 | $2.00 | $1.82 | $1.50 | $4.00 |
| 0490 | 42" MASH concrete barrier parapet/railing wall (7051050) | LF | 320 | $175.00 | $196.70 | $110.00 | $133.00 |
| 0500 | Dynamic pile analyzer test set-UP dynamic pile analyzer test setup (7110001) | EACH | 8 | $2,500.00 | $3,288.57 | $3,000.00 | $500.00 |
| 0510 | Pile driving set-UP (7110010) | EACH | 20 | $2,000.00 | $2,494.77 | $7,500.00 | $10,000 |
| 0520 | Prest. conc. piling (20"SQ.) (7110200) | LF | 280 | $175.00 | $206.64 | $140.00 | $180.00 |
| 0530 | Pile build-UP preparation (20"SQ) (7110201) | EACH | 2 | $5,000.00 | $3,054.49 | $1,800.00 | $1,511.00 |
| 0540 | Predrilling for prest. conc. piling (20"SQ.) (7110204) | LF | 285 | $500.00 | $189.31 | $115.00 | $551.00 |
| 0550 | Prestressed index piling (20" square) (7110205) | LF | 70 | $250.00 | $460.42 | $325.00 | $180.00 |
| 0560 | Prestressed pile point (HP10X57) (7111115) | LF | 120 | $300.00 | $242.02 | $120.00 | $90.00 |
| 0570 | Steel H bearing piling (HP14 X 89) (7112230) | LF | 450 | $125.00 | $121.98 | $66.00 | $70.00 |
| 0580 | 18" smooth wall pipe (7143618) | LF | 432 | $125.00 | $152.02 | $125.00 | $125.00 |
| 0590 | 24" smooth wall pipe (7143624) | LF | 80 | $140.00 | $170.26 | $150.00 | $140.00 |
| 0600 | Drop inlet (24" X 36") (7192020) | EACH | 3 | $4,750.00 | $5,776.61 | $3,500.00 | $4,750.00 |
| 0610 | Beveling of pipe end (7199100) | EACH | 7 | $250.00 | $304.03 | $750.00 | $250.00 |
| 0620 | 4' slope flume (6" curb style with cutoffs) (7199200) | LF | 26 | $135.00 | $164.18 | $200.00 | $135.00 |
| 0630 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 148 | $48.00 | $58.38 | $40.00 | $48.00 |
| 0640 | Elastomeric bearing assembly (flat slab) (7243150) | EACH | 4 | $200.00 | $3,132.47 | $2,750.00 | $6,249.44 |
| 0650 | Rip-rap (class B) (8041020) | TON | 512 | $125.00 | $182.97 | $125.00 | $125.00 |
| 0660 | Geotextile for erosion control under riprap(class 1)type B (8048105) | SY | 1,059 | $1.95 | $2.85 | $6.00 | $1.95 |
| 0670 | MT3 leading end treatment TL3 (8051151) | EACH | 4 | $3,750.00 | $4,560.48 | $3,100.00 | $3,750.00 |
| 0680 | MGS3 GR standard shoulder (8052100) | LF | 1,200 | $29.55 | $35.94 | $23.00 | $29.55 |
| 0690 | MTBBC3 MASH thrie-beam barrier connector TL3 (8053253) | EACH | 4 | $4,100.00 | $4,986.12 | $3,100.00 | $4,100.00 |
| 0700 | Flume inlet at guardrail (handwork) (8053257) | EACH | 2 | $2,120.00 | $2,578.19 | $2,400.00 | $2,120.00 |
| 0710 | Non-mow strip under guardrail (8055250) | SY | 167 | $55.25 | $67.20 | $125.00 | $55.25 |
| 0715 | Temporary barrier fence (orange) (8068301) | LF | 2,000 | $5.00 | $4.86 | $3.50 | $5.00 |
| 0720 | Right of way marker(rebar and cap) (8091010) | EACH | 20 | $111.00 | $134.99 | $200.00 | $111.00 |
| 0730 | Right of way plat (8091050) | LS | 1 | $1,110.00 | $1,349.90 | $5,000.00 | $1,110.00 |
| 0740 | Permanent cover (8100100) | ACRE | 2.74 | $1,700.00 | $2,067.42 | $1,500.00 | $1,700.00 |
| 0750 | Temporary cover (8100200) | ACRE | 4.11 | $1,100.00 | $1,337.74 | $1,320.00 | $1,100.00 |
| 0760 | Compost (8101105) | CY | 74 | $5.30 | $6.45 | $37.00 | $5.30 |
| 0770 | Fertilizer (nitrogen) (8104005) | LB | 274 | $2.10 | $2.55 | $5.00 | $2.10 |
| 0780 | Fertilizer (phosphoric acid) (8104010) | LB | 274 | $2.10 | $2.55 | $5.00 | $2.10 |
| 0790 | Fertilizer (potash) (8104015) | LB | 274 | $2.10 | $2.55 | $5.00 | $2.10 |
| 0800 | Agricultural granular lime (8105005) | LB | 5,480 | $1.00 | $1.22 | $0.45 | $1.00 |
| 0810 | Selective watering (8109050) | GAL | 54,300 | $0.12 | $0.15 | $0.09 | $0.12 |
| 0820 | Mowing (8109901) | ACRE | 8.22 | $450.00 | $547.26 | $500.00 | $450.00 |
| 0830 | Turf reinforcement matting (TRM) type 1 (8151101) | MSY | 0.83 | $4,400.00 | $5,350.96 | $4,100.00 | $4,373.33 |
| 0840 | Temporary erosion control blanket (ecb) (8151110) | MSY | 2.24 | $2,500.00 | $3,040.32 | $1,800.00 | $2,495.54 |
| 0850 | Hydraulic erosion control product (hecp) - type 2 (8151202) | ACRE | 13.70 | $2,550.00 | $3,101.13 | $2,750.00 | $2,550.00 |
| 0860 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 13.70 | $3,650.00 | $4,438.87 | $2,980.00 | $3,650.00 |
| 0870 | Inlet structure filter- type F (non-weighted) (8152006) | LF | 42 | $11.15 | $13.56 | $20.00 | $11.15 |
| 0880 | Sediment tubes for ditch checks (8152007) | LF | 295 | $11.15 | $13.56 | $14.50 | $11.15 |
| 0890 | Silt fence (8153000) | LF | 3,000 | $4.85 | $5.90 | $3.75 | $4.85 |
| 0900 | Replace/repair silt fence (8153090) | LF | 300 | $4.00 | $4.86 | $6.00 | $4.00 |
| 0910 | Cleaning silt basins (8154010) | CY | 33 | $50.00 | $60.81 | $100.00 | $50.00 |
| 0920 | Removal of silt retained by silt fence (8154050) | LF | 750 | $1.75 | $2.13 | $5.00 | $1.75 |
| 0930 | Inlet filter cleaning (8154155) | EACH | 3 | $285.00 | $346.60 | $350.00 | $285.00 |
| 0940 | Inlet structure filter - type B (8156210) | EACH | 3 | $197.00 | $239.58 | $350.00 | $197.00 |
| 0950 | Stabilized construction entrance (8156490) | SY | 550 | $44.00 | $64.41 | $30.00 | $44.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of December 9, 2025. Compiled by Mirage Metrics.