SCDOT contract 2470940 bid tabulation
S-24-39 over Saluda River in Greenwood County Bridge Repair. Let by South Carolina DOT on March 11, 2025, Greenwood, District 2. 6 bids received; low bid $1,450,498 by Lee Construction Company of the.
- Owner
- South Carolina DOT
- Letting
- 11 MAR 2025
- Pay items
- 15
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lee Construction Company of the | $1,450,498 | Low |
| 2 | Cekra, Inc. | $1,528,150 | +5.0% |
| 3 | United Infrastructure Group, Inc. | $1,965,117 | +35% |
| 4 | Ipc Paving LLC | $2,565,299 | +77% |
| 5 | Southern Road & Bridge, LLC | $2,839,830 | +96% |
| 6 | Reeves Construction Company | $3,861,431 | +166% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lee Construction Company of the | 2. Cekra, Inc. | 3. United Infrastructure Group, Inc. | 4. Ipc Paving LLC | 5. Southern Road & Bridge, LLC | 6. Reeves Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $70,000 | $75,000 | $98,266 | $128,200 | $265,000 | $190,000 |
| 0020 | Bridge construction access (1031200) | LS | 1 | $50,000 | $105,000 | $350,000 | $105,000 | $25,000 | $150,000 |
| 0030 | Bonds and insurance (1032010) | LS | 1 | $29,000 | $30,000 | $58,959 | $51,200 | $65,000 | $80,000 |
| 0040 | No. 57 stone for backfill (2052000) | TON | 4.20 | $250.00 | $250.00 | $300.00 | $295.00 | $1,500.00 | $334.58 |
| 0050 | Traffic control (6011000) | LS | 1 | $70,000 | $100,000 | $210,005 | $46,000 | $85,000 | $240,000 |
| 0060 | Reinf. steel for structures (bridge) (7031200) | LB | 720 | $10.00 | $1.50 | $2.00 | $5.00 | $6.00 | $2.15 |
| 0070 | Concrete class 4000 for full depth deck patching (7260800) | CY | 3 | $5,000.00 | $2,000.00 | $3,800.00 | $10,250 | $6,500.00 | $15,000 |
| 0080 | Concrete class 4000 for partial depth deck patching (7260850) | SY | 20 | $2,500.00 | $900.00 | $600.00 | $715.00 | $3,850.00 | $2,100.00 |
| 0090 | Rip-rap (class B) (8041020) | TON | 11.90 | $200.00 | $250.00 | $400.00 | $295.00 | $950.00 | $275.00 |
| 0100 | Geotextile for erosion control under riprap(class 2)type A (8048200) | SY | 21.80 | $10.00 | $25.00 | $25.00 | $27.50 | $150.00 | $50.00 |
| 0110 | Bridge pile wrap (8990017) | LF | 1,050 | $1,000.00 | $1,000.00 | $975.00 | $1,650.00 | $1,485.00 | $2,000.00 |
| 0120 | BR004 - reinforced concrete repair type 1 (8990018) | CF | 9.80 | $2,000.00 | $1,000.00 | $775.00 | $1,550.00 | $2,200.00 | $2,300.00 |
| 0130 | BR005 - reinforced concrete repair type 2 (8990019) | CF | 10 | $3,000.00 | $1,000.00 | $850.00 | $1,950.00 | $1,650.00 | $2,300.00 |
| 0140 | BR040 – corrosion inhibiting bonding agent (8990023) | SF | 325 | $10.00 | $20.00 | $15.50 | $22.00 | $125.00 | $75.00 |
| 0150 | Cleaning & painting existing steel piling (8990026) | EACH | 132 | $400.00 | $850.00 | $1,300.00 | $3,080.00 | $4,850.00 | $7,100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of March 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.