SCDOT contract 1063020 bid tabulation
S-390 (Toogodoo Rd) Bridge Replacement over Swinton Creek. Let by South Carolina DOT on March 10, 2026, Charleston, District 6. 4 bids received; low bid $4,742,584 by Cape Romain Contractors, Inc..
- Owner
- South Carolina DOT
- Letting
- 10 MAR 2026
- Pay items
- 76
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Cape Romain Contractors, Inc. | $4,742,584 | Low |
| 2 | United Infrastructure Group, Inc. | $6,146,418 | +30% |
| 3 | Crowder Construction Company | $6,543,562 | +38% |
| 4 | Dane Construction, LLC | $7,079,512 | +49% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Cape Romain Contractors, Inc. | 2. United Infrastructure Group, Inc. | 3. Crowder Construction Company | 4. Dane Construction, LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $236,800 | $307,321 | $327,178 | $353,975 |
| 0015 | Bridge construction access (1031200) | LS | 1 | $65,846 | $92,196 | $136,732 | $141,590 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $25,552 | $184,393 | $130,871 | $141,590 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $64,236 | $50,000 | $37,769 | $27,000 |
| 0040 | CPM progress schedule (1080300) | LS | 1 | $45,432 | $10,000 | $15,965 | $25,000 |
| 0050 | Clearing & grubbing within right of way (2011000) | LS | 1 | $50,260 | $200,000 | $53,406 | $79,000 |
| 0060 | Removal & disposal of existing asphalt pavement (2025000) | SY | 1,461 | $16.10 | $20.00 | $34.64 | $15.73 |
| 0070 | Removal & disposal of existing bridge (2028100) | LS | 1 | $100,400 | $231,711 | $91,464 | $165,000 |
| 0080 | Unclassified excavation (2031000) | CY | 1,318 | $25.31 | $45.00 | $101.99 | $93.25 |
| 0090 | Borrow excavation (2033000) | CY | 6,717 | $48.31 | $56.00 | $52.96 | $47.50 |
| 0100 | Muck excavation (2034000) | CY | 2,419 | $50.62 | $26.00 | $27.61 | $25.30 |
| 0110 | Geotextile, separation (2036020) | SY | 2,097 | $5.17 | $4.00 | $5.07 | $4.40 |
| 0120 | Geogrid reinforcement (uniaxial) (2037000) | SY | 6,900 | $13.80 | $8.00 | $12.96 | $12.00 |
| 0130 | Geogrid stabilization (2037030) | SY | 3,063 | $13.80 | $4.00 | $6.20 | $6.00 |
| 0140 | Stone bridge lift material (2052010) | TON | 1,997 | $86.27 | $120.50 | $121.14 | $110.00 |
| 0150 | Fine grading (2081001) | SY | 619 | $11.50 | $25.00 | $11.83 | $12.00 |
| 0160 | Flowable fill (2103000) | CY | 50 | $345.08 | $300.00 | $671.53 | $225.00 |
| 0170 | Maintenance stone (3059900) | TON | 100 | $86.27 | $200.00 | $135.54 | $80.00 |
| 0180 | HMA shoulder widening course (3104000) | TON | 68 | $208.20 | $300.00 | $331.63 | $278.32 |
| 0190 | Liquid asphalt binder PG64-22 (4011004) | TON | 51 | $805.19 | $770.00 | $790.82 | $726.75 |
| 0200 | Milling existing asphalt pavement (variable) (4013990) | SY | 333 | $28.76 | $45.00 | $51.02 | $24.14 |
| 0210 | Asphalt base course - type B (4020320) | TON | 343 | $208.20 | $325.00 | $331.63 | $156.58 |
| 0220 | Asphalt intermediate course type C (4030330) | TON | 448 | $201.30 | $250.00 | $265.31 | $158.47 |
| 0230 | Asphalt surface course type C (4040340) | TON | 215 | $204.75 | $240.00 | $244.90 | $175.79 |
| 0240 | Traffic control (6011000) | LS | 1 | $50,572 | $50,000 | $7,622.00 | $25,015 |
| 0250 | Barricade - type III (6041200) | LF | 96 | $28.76 | $21.00 | $21.63 | $26.88 |
| 0260 | Permanent construction signs (ground mounted) (6051120) | SF | 128 | $8.80 | $7.40 | $7.62 | $8.23 |
| 0270 | Permanent construction signs (barricade mounted) (6051125) | SF | 84 | $10.29 | $7.40 | $7.62 | $9.62 |
| 0280 | Type B - flashing light (608100B) | EACH | 16 | $189.80 | $125.00 | $128.75 | $215.00 |
| 0290 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 2,200 | $2.70 | $1.00 | $1.03 | $1.00 |
| 0300 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 2,200 | $2.70 | $1.00 | $1.03 | $1.00 |
| 0310 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 20 | $92.02 | $7.50 | $7.73 | $7.50 |
| 0320 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 1,044 | $10.83 | $10.00 | $11.70 | $31.60 |
| 0330 | Conc. for structures - class 4000 (7011400) | CY | 854.70 | $1,241.00 | $1,700.00 | $2,370.27 | $3,140.00 |
| 0340 | Reinf. steel for structures (bridge) (7031200) | LB | 25,148 | $1.38 | $2.00 | $1.77 | $2.15 |
| 0350 | Galvanized reinf. steel for structures (bridge) (7031400) | LB | 173,667 | $2.45 | $2.00 | $2.68 | $2.75 |
| 0360 | 42" MASH concrete barrier parapet/railing wall (7051050) | LF | 520 | $119.58 | $90.00 | $81.78 | $83.25 |
| 0370 | Dynamic pile analyzer test set-UP dynamic pile analyzer test setup (7110001) | EACH | 10 | $613.24 | $5,000.00 | $3,517.48 | $250.00 |
| 0380 | Pile driving set-UP (7110010) | EACH | 72 | $1,107.84 | $8,000.00 | $7,125.00 | $8,250.00 |
| 0390 | Prest. conc. piling (24"SQ.) (7110240) | LF | 1,967 | $218.99 | $210.00 | $249.13 | $220.00 |
| 0400 | Pile build-UP preparation (24"SQ) (7110241) | EACH | 5 | $3,135.53 | $2,500.00 | $2,570.55 | $2,000.00 |
| 0410 | Prestressed index piling (24" square) (7110245) | LF | 166 | $281.68 | $250.00 | $249.13 | $220.00 |
| 0420 | Prestressed pile point (HP12X53) (7111120) | LF | 340 | $115.03 | $175.00 | $136.00 | $135.00 |
| 0430 | Steel H bearing piling (HP14 X 117) (7112250) | LF | 2,400 | $142.47 | $108.00 | $103.00 | $100.00 |
| 0440 | Steel H bearing index piling (HP14X 117) (7112252) | LF | 160 | $204.05 | $175.00 | $103.00 | $100.00 |
| 0450 | 18" RC pipe cul.-class III (7141113) | LF | 20 | $249.61 | $325.00 | $141.78 | $136.00 |
| 0460 | 18" RC pipe cul.-class IV (7141123) | LF | 70 | $255.36 | $375.00 | $152.22 | $145.00 |
| 0470 | 4' slope flume (6" curb style with cutoffs) (7199200) | LF | 36 | $431.35 | $227.01 | $225.00 | $225.00 |
| 0480 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 237 | $74.77 | $68.61 | $68.00 | $68.00 |
| 0490 | Compression seal joint (7232320) | LF | 41 | $379.05 | $250.00 | $495.96 | $145.00 |
| 0500 | Elastomeric bearing assembly (flat slab) (7243150) | EACH | 8 | $3,163.85 | $5,000.00 | $6,505.99 | $3,500.00 |
| 0510 | Rip-rap (class B) (8041020) | TON | 477 | $184.04 | $225.00 | $173.54 | $160.00 |
| 0520 | Geotextile for erosion control under riprap(class 2)type D (8048215) | SY | 591 | $4.60 | $7.00 | $6.76 | $7.50 |
| 0530 | MT3 leading end treatment TL3 (8051151) | EACH | 4 | $3,680.89 | $3,200.00 | $3,296.00 | $3,200.00 |
| 0540 | MGS3 GR standard shoulder (8052100) | LF | 262.50 | $29.91 | $26.00 | $26.78 | $26.00 |
| 0550 | MTBBC3 MASH thrie-beam barrier connector TL3 (8053253) | EACH | 4 | $3,335.80 | $2,900.00 | $2,987.00 | $2,900.00 |
| 0560 | Flume inlet at guardrail (handwork) (8053257) | EACH | 2 | $1,420.59 | $2,522.29 | $2,500.00 | $2,500.00 |
| 0570 | Non-mow strip under guardrail (8055250) | SY | 538 | $66.80 | $136.20 | $70.00 | $75.00 |
| 0580 | Right of way marker(rebar and cap) (8091010) | EACH | 18 | $115.03 | $150.00 | $257.50 | $160.00 |
| 0590 | Right of way plat (8091050) | LS | 1 | $8,680.89 | $7,500.00 | $2,060.00 | $3,695.00 |
| 0600 | Permanent cover (8100100) | ACRE | 0.76 | $4,025.97 | $1,500.00 | $1,416.43 | $1,800.00 |
| 0610 | Temporary cover (8100200) | ACRE | 1.15 | $1,150.28 | $1,120.00 | $894.17 | $1,400.00 |
| 0620 | Compost (8101105) | CY | 206 | $31.06 | $28.00 | $5.15 | $30.00 |
| 0630 | Fertilizer (nitrogen) (8104005) | LB | 76.40 | $2.30 | $3.25 | $2.02 | $4.00 |
| 0640 | Fertilizer (phosphoric acid) (8104010) | LB | 76.40 | $2.30 | $3.25 | $2.02 | $4.00 |
| 0650 | Fertilizer (potash) (8104015) | LB | 76.40 | $1.73 | $3.25 | $2.02 | $4.00 |
| 0660 | Agricultural granular lime (8105005) | LB | 1,528 | $0.01 | $0.40 | $2.02 | $0.12 |
| 0670 | Selective watering (8109050) | GAL | 54,300 | $0.03 | $0.08 | $0.12 | $0.12 |
| 0680 | Mowing (8109901) | ACRE | 3.82 | $920.22 | $400.00 | $416.21 | $300.00 |
| 0690 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 3.82 | $5,176.25 | $2,850.00 | $3,454.05 | $3,400.00 |
| 0700 | Sediment tubes for ditch checks (8152007) | LF | 200 | $12.65 | $13.00 | $10.78 | $15.00 |
| 0710 | Silt fence (8153000) | LF | 4,368 | $5.75 | $3.00 | $3.71 | $3.00 |
| 0720 | Replace/repair silt fence (8153090) | LF | 437 | $4.60 | $4.10 | $6.78 | $3.00 |
| 0730 | Floating turbidity barrier- heavy duty(5'depth) (8153305) | LF | 400 | $20.70 | $28.55 | $25.01 | $35.00 |
| 0740 | Removal of silt retained by silt fence (8154050) | LF | 1,092 | $1.44 | $6.17 | $1.57 | $15.00 |
| 0750 | Stabilized construction entrance (8156490) | SY | 550 | $33.36 | $33.03 | $21.24 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of March 10, 2026. Compiled by Mirage Metrics.