SCDOT contract 2375350 bid tabulation
Bridge Repair US 29 over Enoree River in Greenville County. Let by South Carolina DOT on April 14, 2026, Greenville, District 3. 4 bids received; low bid $5,321,074 by United Infrastructure Group, Inc..
- Owner
- South Carolina DOT
- Letting
- 14 APR 2026
- Pay items
- 37
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | United Infrastructure Group, Inc. | $5,321,074 | Low |
| 2 | Gemstone, LLC | $6,467,135 | +22% |
| 3 | Cekra, Inc. | $6,726,817 | +26% |
| 4 | Dane Construction, LLC | $8,830,108 | +66% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. United Infrastructure Group, Inc. | 2. Gemstone, LLC | 3. Cekra, Inc. | 4. Dane Construction, LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $266,041 | $205,000 | $335,000 | $441,505 |
| 0020 | Bridge construction access (1031200) | LS | 1 | $106,416 | $13,300 | $300,000 | $441,505 |
| 0030 | Bonds and insurance (1032010) | LS | 1 | $159,624 | $158,000 | $134,000 | $176,600 |
| 0040 | Selected clearing (2015010) | LS | 1 | $1.00 | $42,000 | $25,000 | $45,000 |
| 0050 | Removal of structures & obstructions (2021000) | LS | 1 | $40,000 | $18,000 | $40,000 | $7,500.00 |
| 0060 | Removal & disposal of designated portions of existing bridge (2028200) | LS | 1 | $40,000 | $35,000 | $25,000 | $75,000 |
| 0070 | Unclassified excavation (2031000) | CY | 623.80 | $15.00 | $90.00 | $180.00 | $45.00 |
| 0080 | Liquid asphalt binder PG64-22 (4011004) | TON | 37.50 | $725.00 | $800.00 | $725.00 | $725.00 |
| 0090 | Milling existing asphalt pavement 2.0" (4013120) | SY | 2,578 | $7.50 | $9.00 | $7.50 | $7.50 |
| 0100 | Asphalt surface course type B (4040320) | TON | 623.90 | $148.00 | $177.60 | $148.00 | $148.00 |
| 0110 | Traffic control (6011000) | LS | 1 | $200,000 | $145,000 | $175,000 | $315,000 |
| 0120 | Permanent construction signs (ground mounted) (6051120) | SF | 798 | $6.25 | $7.98 | $12.00 | $6.25 |
| 0130 | Permanent construction signs (barricade mounted) (6051125) | SF | 308 | $8.85 | $10.74 | $8.00 | $8.85 |
| 0140 | Pavement markings(temporary-paint)-4" white solid lines (609115A) | LF | 2,640 | $0.25 | $0.30 | $0.25 | $0.25 |
| 0150 | Pavement markings(temporary-paint)-4" yellow solid lines (609115B) | LF | 880 | $0.25 | $0.30 | $0.25 | $0.25 |
| 0160 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 1,760 | $1.00 | $1.20 | $1.00 | $1.00 |
| 0170 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 880 | $1.00 | $1.20 | $1.00 | $1.00 |
| 0180 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 480 | $1.00 | $1.20 | $1.00 | $1.00 |
| 0190 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 1,280 | $1.00 | $1.20 | $1.00 | $1.00 |
| 0200 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 52 | $10.00 | $12.00 | $10.00 | $10.00 |
| 0210 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 26 | $10.00 | $12.00 | $10.00 | $10.00 |
| 0220 | Spall repair (7013400) | SF | 49.20 | $200.00 | $360.00 | $350.00 | $210.00 |
| 0230 | Epoxy crack injection (7013446) | LF | 32 | $90.00 | $120.00 | $125.00 | $110.00 |
| 0240 | Structural steel (7091120) | LB | 273,898 | $7.00 | $8.66 | $11.00 | $12.50 |
| 0250 | Cleaning and painting existing structural steel (7101000) | LS | 1 | $65,000 | $324,000 | $45,000 | $175,000 |
| 0260 | Elastomeric bearing (7243100) | EACH | 112 | $900.00 | $2,800.00 | $1,100.00 | $1,100.00 |
| 0270 | Removal of epoxy, asphalt & foreign overlay (7260100) | SY | 3,094 | $15.00 | $29.00 | $25.00 | $25.00 |
| 0280 | Reseal deck expansion joint (7261127) | LF | 105 | $40.00 | $65.00 | $145.00 | $175.00 |
| 0290 | Polymer modified asphalt expansion joint (7261210) | LF | 994 | $180.00 | $290.00 | $350.00 | $285.00 |
| 0300 | Jacking bridge (7262000) | LS | 1 | $200,000 | $108,000 | $250,000 | $205,750 |
| 0310 | Composite fiber wrap (7262110) | SF | 6,924 | $35.00 | $68.00 | $40.00 | $42.00 |
| 0320 | Rip-rap (class B) (8041020) | TON | 1,774.10 | $95.00 | $145.00 | $175.00 | $100.00 |
| 0330 | Geotextile for erosion control under riprap(class 2)type A (8048200) | SY | 1,397.70 | $6.00 | $25.00 | $12.00 | $6.75 |
| 0340 | Demo existing pile encasement (8990010) | EACH | 72 | $3,000.00 | $2,200.00 | $1,400.00 | $475.00 |
| 0350 | BR006 - reinforced concrete tee-beam repair type A (8990011) | CF | 204 | $350.00 | $950.00 | $400.00 | $1,475.00 |
| 0360 | Bridge pile wrap (8990017) | LF | 940 | $650.00 | $650.00 | $470.00 | $1,300.00 |
| 0370 | Cleaning & painting existing steel piling (8990026) | EACH | 144 | $3,500.00 | $2,525.00 | $2,100.00 | $5,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of April 14, 2026. Compiled by Mirage Metrics.