SCDOT contract 3966480 bid tabulation
Bridge replacement on S-250 ( Hester Store Road) o. Let by South Carolina DOT on November 12, 2025, Pickens, District 3. 7 bids received; low bid $2,998,907 by Kemp Sigmon Construction Co., Inc..
- Owner
- South Carolina DOT
- Letting
- 12 NOV 2025
- Pay items
- 94
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kemp Sigmon Construction Co., Inc. | $2,998,907 | Low |
| 2 | NHM Constructors, Inc. | $3,151,675 | +5.0% |
| 3 | Ipc Paving LLC | $3,574,017 | +19% |
| 4 | United Infrastructure Group, Inc. | $3,604,671 | +20% |
| 5 | Palmetto Infrastructure, Inc. | $3,620,709 | +21% |
| 6 | Reeves Construction Company | $3,872,297 | +29% |
| 7 | Dane Construction, LLC | $4,080,922 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kemp Sigmon Construction Co., Inc. | 2. NHM Constructors, Inc. | 3. Ipc Paving LLC | 4. United Infrastructure Group, Inc. | 5. Palmetto Infrastructure, Inc. | 6. Reeves Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization mobilization (1031000) | LS | 1 | $140,000 | $281,700 | $178,500 | $180,233 | $225,000 | $193,000 |
| 0020 | Bonds and insurance bonds and insurance (1032010) | LS | 1 | $56,000 | $58,374 | $71,500 | $108,140 | $70,000 | $116,000 |
| 0030 | Construction stakes, lines & grades construction stakes, lines & grades (1050801) | EACH | 1 | $20,000 | $67,620 | $63,800 | $85,000 | $40,000 | $35,000 |
| 0040 | CPM progress schedule CPM progress schedule (1080300) | LS | 1 | $20,000 | $15,605 | $15,000 | $20,000 | $12,000 | $5,000.00 |
| 0050 | Clearing & grubbing within right of way clearing & grubbing within right of way (2011001) | ACRE | 2.50 | $50,000 | $26,008 | $28,600 | $26,000 | $20,000 | $35,000 |
| 0051 | Removal & disposal item no. 0001 (2022000) | LS | 1 | $5,000.00 | $6,761.95 | $8,500.00 | $20,000 | $3,500.00 | $75,000 |
| 0052 | Removal & disposal item no. 02 (2022000) | LS | 1 | $2,500.00 | $1,560.45 | $4,000.00 | $1,000.00 | $2,500.00 | $13,000 |
| 0053 | Removal & disposal item no. 03 (2022000) | LS | 1 | $2,500.00 | $1,560.45 | $4,000.00 | $1,000.00 | $3,000.00 | $7,000.00 |
| 0054 | Removal & disposal item no. 04 (2022000) | LS | 1 | $1,000.00 | $312.09 | $4,000.00 | $100.00 | $1,500.00 | $2,500.00 |
| 0060 | Removal & disposal of existing asphalt pavement removal & disposal of existing asphalt pavement (2025000) | SY | 290 | $15.00 | $15.60 | $25.00 | $19.00 | $22.00 | $45.00 |
| 0070 | Removal of exist. guardrail removal of exist. guardrail (2027801) | LF | 300 | $2.00 | $1.04 | $3.00 | $1.00 | $5.00 | $2.00 |
| 0080 | Removal & disposal of existing bridge removal & disposal of existing bridge (2028100) | LS | 1 | $625,000 | $311,500 | $245,000 | $500,000 | $385,000 | $303,045 |
| 0090 | Unclassified excavation unclassified excavation (2031000) | CY | 2,433 | $20.00 | $17.16 | $28.70 | $35.00 | $40.00 | $30.00 |
| 0100 | Borrow excavation borrow excavation (2033000) | CY | 4,551 | $15.00 | $36.41 | $104.35 | $40.00 | $45.00 | $60.00 |
| 0110 | Geogrid reinforcement (uniaxial) geogrid reinforcement (uniaxial) (2037000) | SY | 687 | $5.00 | $8.32 | $9.30 | $20.00 | $12.00 | $20.00 |
| 0120 | Fine grading fine grading (2081001) | SY | 920 | $15.00 | $62.42 | $2.50 | $50.00 | $11.00 | $32.00 |
| 0130 | Graded aggregate base course (6" uniform) graded aggregate base course (6" uniform) (3050106) | SY | 194 | $20.00 | $26.01 | $18.20 | $50.00 | $65.00 | $40.00 |
| 0140 | Maintenance stone (3059900) | TON | 100 | $25.00 | $52.02 | $52.40 | $100.00 | $75.00 | $70.00 |
| 0150 | Prime coat prime coat (4010005) | GAL | 53 | $25.00 | $26.01 | $3.50 | $10.00 | $175.00 | $35.00 |
| 0160 | Liquid asphalt binder PG64-22 liquid asphalt binder PG64-22 (4011004) | TON | 43 | $680.00 | $707.40 | $680.00 | $686.78 | $680.00 | $800.00 |
| 0170 | Full depth asph. pav. patching 10"unif full depth asph. pav. patching 10"unif (4012100) | SY | 92 | $340.00 | $353.70 | $340.00 | $343.39 | $340.00 | $350.00 |
| 0180 | Milling existing asphalt pavement (variable) milling existing asphalt pavement (variable) (4013990) | SY | 178 | $62.00 | $64.50 | $62.00 | $62.62 | $62.00 | $50.00 |
| 0190 | Asphalt base course - type B asphalt base course - type B (4020320) | TON | 454 | $145.00 | $150.84 | $145.00 | $146.45 | $145.00 | $235.00 |
| 0200 | Asphalt intermediate course type B asphalt intermediate course type B (4030320) | TON | 39 | $300.00 | $312.09 | $300.00 | $302.99 | $300.00 | $350.00 |
| 0210 | Asphalt intermediate course type C asphalt intermediate course type C (4030330) | TON | 117 | $235.00 | $244.47 | $235.00 | $237.34 | $235.00 | $280.00 |
| 0220 | Asphalt surface course type C (4040340) | TON | 186 | $185.00 | $192.46 | $185.00 | $186.85 | $185.00 | $240.00 |
| 0230 | Asphalt surface course type E (4040360) | TON | 34 | $275.00 | $286.08 | $275.00 | $277.74 | $275.00 | $385.00 |
| 0240 | Traffic control (6011000) | LS | 1 | $55,000 | $2,808.81 | $18,000 | $122,000 | $7,500.00 | $100,000 |
| 0250 | Barricade - type III barricade - type III (6041200) | LF | 96 | $15.00 | $28.61 | $25.00 | $25.00 | $25.00 | $21.00 |
| 0260 | Permanent construction signs (ground mounted) (6051120) | SF | 430 | $7.75 | $16.12 | $8.50 | $7.00 | $6.85 | $7.40 |
| 0270 | Permanent construction signs (barricade mounted) (6051125) | SF | 119 | $7.75 | $8.06 | $8.50 | $9.00 | $8.85 | $7.40 |
| 0280 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. 4" white solid lines (PVT. edge lines) thermo. -90 mil. (6271010) | LF | 1,400 | $0.75 | $0.78 | $0.75 | $0.75 | $2.00 | $0.75 |
| 0290 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 1,400 | $0.75 | $0.78 | $0.75 | $0.75 | $2.00 | $0.75 |
| 0300 | Permanent yellow pavement markers BI-dir.- 4"X4" permanent yellow pavement markers BI-dir. -4"X4" (6301100) | EACH | 9 | $10.00 | $10.40 | $10.00 | $10.00 | $25.00 | $10.00 |
| 0310 | Flat sheet, type III, fixed SZ. & MSG. sign flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 15 | $26.15 | $27.57 | $14.00 | $28.00 | $28.00 | $50.00 |
| 0320 | U-section post for sign bracing - 2P U-section post for sign bracing - 2P (6531215) | LF | 60 | $16.95 | $12.48 | $9.00 | $8.00 | $7.95 | $23.00 |
| 0330 | Furnish & install 2.0" schedule 80 PVC conduit furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 684 | $18.00 | $20.36 | $21.75 | $7.00 | $15.00 | $36.64 |
| 0340 | Conc. for structures - class 4000 concrete for structures - class 4000 (7011400) | CY | 402 | $1,200.00 | $1,434.00 | $1,750.00 | $2,000.00 | $2,200.00 | $1,750.00 |
| 0345 | Conc. for structures - class 4000DS (7011510) | CY | 4 | $5,000.00 | $1,060.84 | $1,000.00 | $5,000.00 | $4,500.00 | $3,000.00 |
| 0360 | Grooved surface finish grooved surface finish (7023200) | SY | 578 | $11.00 | $16.09 | $83.85 | $10.00 | $75.00 | $25.00 |
| 0370 | Reinf. steel for structures (bridge) reinf. steel for structures (bridge) (7031200) | LB | 84,513 | $1.75 | $1.05 | $1.95 | $1.00 | $1.50 | $2.00 |
| 0380 | Prestressed concrete bulb tee beam(72"mod.) (7044572) | LF | 774 | $525.00 | $615.38 | $625.00 | $450.00 | $650.00 | $700.00 |
| 0390 | 42" MASH concrete barrier parapet/railing wall 42" MASH concrete barrier parapet / railing wall (7051050) | LF | 340 | $120.00 | $121.30 | $153.61 | $100.00 | $115.00 | $120.00 |
| 0400 | Pile driving set-UP pile driving set-UP (7110010) | EACH | 6 | $2,000.00 | $2,400.00 | $4,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0410 | Reinf. pile tips (HP14 X 89) reinf. pile tips (HP14X89) (7111565) | EACH | 6 | $175.00 | $210.00 | $250.00 | $180.00 | $250.00 | $350.00 |
| 0420 | Steel H bearing piling (HP14 X 89) steel H bearing piling (HP14X89) (7112230) | LF | 168 | $100.00 | $122.62 | $168.10 | $200.00 | $79.00 | $220.00 |
| 0430 | 15" smooth wall pipe 15" smooth wall pipe (7143615) | LF | 200 | $75.00 | $104.03 | $102.25 | $115.00 | $115.00 | $140.00 |
| 0440 | 18" smooth wall pipe 18" smooth wall pipe (7143618) | LF | 16 | $125.00 | $156.05 | $125.90 | $150.00 | $245.00 | $240.00 |
| 0450 | 24" smooth wall pipe 24" smooth wall pipe (7143624) | LF | 36 | $175.00 | $166.45 | $105.00 | $300.00 | $250.00 | $325.00 |
| 0460 | Drilled pile set-UP drilled pile set-UP (7160008) | EACH | 6 | $4,000.00 | $3,100.00 | $4,000.00 | $10,000 | $10,000 | $18,000 |
| 0461 | Soil excavation for drilled pile foundations - 30" diameter (7160023) | LF | 120 | $500.00 | $547.54 | $500.00 | $175.00 | $750.00 | $180.00 |
| 0462 | Rock excavation for drilled pile foundations - 24" diameter (7160062) | LF | 30 | $500.00 | $629.69 | $500.00 | $1,300.00 | $750.00 | $1,350.00 |
| 0470 | Catch basin -type 9 catch basin -type 9 (7191205) | EACH | 1 | $5,000.00 | $3,641.05 | $4,903.00 | $8,000.00 | $4,500.00 | $10,000 |
| 0480 | 24" X 24" junction box 24" X 24" junction box (7192205) | EACH | 1 | $3,500.00 | $2,600.75 | $5,260.00 | $8,000.00 | $6,500.00 | $10,000 |
| 0490 | 4' slope flume (6" curb style with cutoffs) 4" slope flume (6" curb style with cutoffs) (7199200) | LF | 123 | $200.00 | $389.38 | $269.00 | $218.00 | $450.00 | $300.00 |
| 0500 | Concrete curb and gutter(2'-0") vertical face concrete curb and gutter(2'-0") vertical face (7203210) | LF | 72 | $56.00 | $107.02 | $59.00 | $61.00 | $80.00 | $100.00 |
| 0510 | Elastomeric bearing elastomeric bearing (7243100) | EACH | 12 | $350.00 | $244.45 | $285.00 | $500.00 | $300.00 | $500.00 |
| 0520 | Waterproofing waterproofing (7282000) | SY | 33 | $50.00 | $121.09 | $300.00 | $50.00 | $85.00 | $225.00 |
| 0530 | Aggregate underdrain(agg#789)with 4"perf.pipe for struc aggregate underdrain (aggr 789) with 4" perf pipe for struc (8011210) | TON | 203 | $100.00 | $183.00 | $185.00 | $85.00 | $155.00 | $130.00 |
| 0540 | Rip-rap (class A) rip-rap (class A) (8041010) | TON | 73 | $80.00 | $93.63 | $102.90 | $100.00 | $80.00 | $140.00 |
| 0550 | Rip-rap (class B) rip-rap (class B) (8041020) | TON | 40 | $80.00 | $104.03 | $101.25 | $110.00 | $80.00 | $130.00 |
| 0560 | Rip-rap (class C) rip-rap (class C) (8041030) | TON | 940 | $85.00 | $114.43 | $137.90 | $150.00 | $80.00 | $140.00 |
| 0570 | Geotextile for erosion control under riprap(class 1)type C geotextile for erosion control under riprap(class 1)type C (8048110) | SY | 1,261 | $3.00 | $6.24 | $5.00 | $5.00 | $8.00 | $6.00 |
| 0580 | Geotextile for erosion control under riprap(class 2)type A geotextile for erosion control under riprap(class 2)type A (8048200) | SY | 201 | $3.00 | $6.24 | $5.00 | $8.00 | $8.00 | $6.00 |
| 0590 | Geotextile for erosion control under riprap(class 2)type C geotextile for erosion control under riprap(class 2)type C (8048210) | SY | 145 | $3.00 | $6.24 | $5.00 | $7.00 | $8.00 | $6.00 |
| 0600 | Premash W-beam strong post system WSP3 premash W-beam strong post system WSP3 (8051050) | LF | 12.50 | $25.00 | $35.91 | $25.00 | $34.50 | $26.00 | $25.00 |
| 0610 | MT2 leading end treatment TL2 MT2 leading end treatment TL2 (8051155) | EACH | 3 | $3,400.00 | $3,499.65 | $3,400.00 | $3,364.00 | $3,000.00 | $3,400.00 |
| 0620 | MGS3 GR standard shoulder MGS3 GR standard shoulder (8052100) | LF | 375 | $25.00 | $30.31 | $25.00 | $29.00 | $27.00 | $25.00 |
| 0630 | Premash trailing W-beam type B 12.5' premash trailing W-beam type B T1.5 (8052210) | EACH | 1 | $1,200.00 | $1,635.35 | $1,200.00 | $1,572.00 | $1,600.00 | $1,200.00 |
| 0640 | Premash thriebeam bridge conn TBBC3 premash thriebeam bridge conn TBBC3 (8053250) | EACH | 1 | $2,650.00 | $2,683.01 | $2,650.00 | $2,579.00 | $3,300.00 | $2,650.00 |
| 0650 | MTBBC2 MASH thrie-beam barrier connector TL2 MTBCC2 MASH thrie-beam barrier connector TL2 (8053255) | EACH | 3 | $3,000.00 | $2,154.75 | $3,000.00 | $2,072.00 | $3,000.00 | $3,000.00 |
| 0660 | Flume inlet at guardrail (handwork) flume inlet at guardrail (handwork) (8053257) | EACH | 4 | $5,000.00 | $4,681.35 | $4,500.00 | $5,450.00 | $4,000.00 | $5,000.00 |
| 0670 | Non-mow strip under guardrail non-mow strip under guardrail (8055250) | SY | 340 | $40.00 | $72.08 | $116.00 | $130.00 | $75.00 | $145.00 |
| 0680 | Right of way marker(rebar and cap) right of way marker(rebar and cap) (8091010) | EACH | 26 | $275.00 | $260.08 | $125.00 | $150.00 | $150.00 | $125.00 |
| 0690 | Right of way plat right of way plat (8091050) | LS | 1 | $3,700.00 | $5,201.50 | $4,500.00 | $5,000.00 | $4,000.00 | $2,300.00 |
| 0700 | Permanent cover permanent cover (8100100) | ACRE | 1.09 | $2,200.00 | $1,716.50 | $2,175.82 | $1,699.50 | $1,650.00 | $1,662.09 |
| 0710 | Temporary cover temporary cover (8100200) | ACRE | 0.55 | $2,650.00 | $1,300.38 | $3,543.04 | $1,287.50 | $1,250.00 | $1,259.16 |
| 0720 | Fertilizer (nitrogen) fertilizer (nitrogen) (8104005) | LB | 110 | $6.00 | $114.43 | $6.00 | $2.06 | $2.00 | $2.00 |
| 0730 | Fertilizer (phosphoric acid) fertilizer (phosphoric acid) (8104010) | LB | 110 | $6.00 | $114.43 | $6.00 | $2.06 | $2.00 | $2.00 |
| 0740 | Fertilizer (potash) fertilizer (potash) (8104015) | LB | 110 | $6.00 | $114.43 | $6.00 | $2.06 | $2.00 | $2.00 |
| 0750 | Agricultural granular lime agricultural granular lime (8105005) | LB | 2,190 | $0.45 | $0.52 | $0.45 | $0.52 | $0.50 | $0.50 |
| 0760 | Selective watering selective watering (8109050) | GAL | 54,300 | $0.09 | $0.01 | $0.09 | $0.01 | $0.01 | $0.01 |
| 0770 | Mowing mowing (8109901) | ACRE | 3.28 | $600.00 | $546.16 | $597.07 | $540.75 | $525.00 | $525.64 |
| 0780 | Turf reinforcement matting (TRM) type 1 turf reinforcement matting (TRM) type 1 (8151101) | MSY | 0.30 | $6,500.00 | $6,085.76 | $6,346.80 | $6,025.50 | $5,850.00 | $5,909.09 |
| 0790 | Temporary erosion control blanket (ecb) temporary erosion control blanket (ecb) (8151110) | MSY | 6.29 | $1,800.00 | $1,716.50 | $1,842.34 | $1,699.50 | $1,650.00 | $1,652.10 |
| 0800 | Hydraulic erosion control product (hecp) - type 1 hydraulic erosion control product (hecp) - type 1 (8151201) | ACRE | 0.14 | $8,600.00 | $2,548.74 | $8,600.00 | $2,523.50 | $2,450.00 | $2,450.00 |
| 0810 | Hydraulic erosion control product (hecp) - type 3 hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 0.43 | $4,450.00 | $3,797.10 | $4,450.00 | $3,759.50 | $3,650.00 | $3,650.00 |
| 0820 | Hydraulic erosion control product (hecp) - type 4 hydraulic erosion control product (hecp) - type 4 (8151204) | ACRE | 0.47 | $5,700.00 | $5,045.46 | $5,724.36 | $4,995.50 | $4,850.00 | $4,870.73 |
| 0830 | Inlet structure filter- type F (non-weighted) inlet structure filter - type F (non-weighted) (8152006) | LF | 16 | $25.00 | $9.88 | $490.00 | $9.79 | $9.50 | $9.50 |
| 0840 | Sediment tubes for ditch checks sediment tubes for ditch checks (8152007) | LF | 1,400 | $15.50 | $9.88 | $15.50 | $9.79 | $9.50 | $9.50 |
| 0850 | Cleaning silt basins cleaning silt basins (8154010) | CY | 60 | $35.00 | $104.03 | $125.00 | $40.00 | $55.00 | $60.00 |
| 0860 | Inlet filter cleaning inlet filter cleaning (8154155) | EACH | 1 | $500.00 | $312.09 | $179.00 | $250.00 | $2,000.00 | $1,085.00 |
| 0870 | Aggregate no.5 or 57 for erosion control aggregate no.5 or 57 for erosion control (8156410) | TON | 23 | $100.00 | $104.03 | $170.00 | $150.00 | $150.00 | $175.00 |
| 0880 | Stabilized construction entrance stabilized construction entrance (8156490) | SY | 550 | $15.00 | $41.61 | $34.00 | $20.00 | $30.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of November 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.