SCDOT contract 3173780 bid tabulation

2026 Lee County Rehab- Lee CTC. Let by South Carolina DOT on September 9, 2025, Lee, District 1. 3 bids received; low bid $6,125,700 by Palmetto Corp. of Conway.

Owner
South Carolina DOT
Letting
09 SEP 2025
Pay items
38
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Palmetto Corp. of Conway$6,125,700Low
2C.R. Jackson, Inc.$6,773,384+11%
3Truerock Construction, LLC$6,867,157+12%
SCDOT contract 3173780: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Palmetto Corp. of Conway2. C.R. Jackson, Inc.3. Truerock Construction, LLC
0010Mobilization (1031000)LS1$225,000$338,500$340,000
0020Bonds and insurance (1032010)LS1$120,000$135,000$136,000
0030Removal & disposal of existing pavement (2023000)SY85$26.50$31.75$35.00
0040Removal of exist. guardrail (2027801)LF600$1.00$1.00$1.00
0050Unclassified excavation (2031000)CY28$100.00$113.00$110.00
0060Borrow excavation (2033000)CY2,996$44.90$76.00$50.00
0070Excavation for shoulder paving (2036000)STA896.60$28.30$67.00$70.00
0080Hauling of excavated shoulder material (2072000)STA896.60$55.80$33.00$70.00
0090Maintenance stone (3059900)TON69$145.00$110.00$160.00
0100HMA shoulder widening course (3104000)TON4,891.92$70.75$76.00$90.00
0110Liquid asphalt binder PG64-22 (4011004)TON2,240.62$635.00$656.00$600.00
0120Full depth asph. pav. patching 6" unif. (4012060)SY6,200$55.25$64.25$70.00
0130Full depth asph. pav. patching 8" unif (4012080)SY700$76.55$94.25$90.00
0140Milling existing asphalt pavement 2.0" (4013120)SY83,775$1.80$1.90$3.00
0150Milling existing asphalt pavement (variable) (4013990)SY6,500$8.00$4.00$15.00
0160Asphalt intermediate course type B (4030320)TON8,377.60$70.10$78.00$75.00
0170Asphalt surface course type B (4040320)TON8,547.60$76.20$84.00$85.00
0180Asphalt surface course type C (4040340)TON15,410.93$76.45$84.00$85.00
0190Driveway paving-surface type C (4047220)TON1,629$155.00$208.00$210.00
0200Traffic control (6011000)LS1$190,000$142,000$132,750
0210Permanent construction signs (ground mounted) (6051120)SF1,688$5.50$5.50$5.50
02204" white broken lines -(gaps excluded)-fast dry paint (6240005)LF3,080$0.12$0.12$0.12
02304" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF401,330$0.11$0.11$0.11
024024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF1,860$0.01$0.01$0.01
02504" yellow broken lines(gaps exc) - fast dry paint (6240105)LF15,340$0.12$0.12$0.12
02604"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF348,600$0.11$0.11$0.11
02704" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF1,090$0.48$0.48$0.48
02804" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF146,805$0.46$0.46$0.46
029024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF670$17.50$17.50$17.50
03004" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064)LF5,770$0.48$0.48$0.48
03104" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF123,000$0.46$0.46$0.46
0320Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH1,005$5.00$5.00$5.00
0330Milled-in rumble strip (6321000)MI15.30$500.00$500.00$500.00
0340Premash W-beam strong post system WSP3 (8051050)LF50$35.00$35.00$35.00
0350Premash thrie strong post guardrail (8053050)LF100$55.00$55.00$55.00
0360Premash thriebeam bridge conn TBBC3 (8053250)EACH8$996.87$996.87$996.87
0370Premash type T TL3 leading 50' (8057100)EACH8$2,815.00$3,128.75$2,815.00
0380Permanent grassing for non-permitted resurfacing projects (8100102)ACRE14.39$3,091.06$3,091.06$3,091.06
SCDOT contract 3173780: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of September 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy