SCDOT contract 3769260 bid tabulation

2025 Oconee Reconstruction-Rehab. Let by South Carolina DOT on March 11, 2025, Oconee, District 3. 2 bids received; low bid $11,646,304 by King Asphalt, Inc..

Owner
South Carolina DOT
Letting
11 MAR 2025
Pay items
66
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1King Asphalt, Inc.$11,646,304Low
2Rogers Group, Inc.$13,421,723+15%
SCDOT contract 3769260: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. King Asphalt, Inc.2. Rogers Group, Inc.
0010Mobilization (1031000)LS1$455,000$670,000
0020Bonds and insurance (1032010)LS1$48,800$400,000
0030Railroad insurance and flagging 001 (1071403)LS1$40,000$100,000
0040Removal & disposal of existing pavement (2023000)SY1,405$37.00$55.00
0050Removal of exist. guardrail (2027801)LF1,850$1.05$1.05
0060Borrow excavation (2033000)CY1,544$100.00$160.00
0070Excavation for shoulder paving (2036000)STA73.39$230.00$660.00
0080Hauling of excavated shoulder material (2072000)STA73.39$125.00$325.00
0090Maintenance stone (3059900)TON330$85.00$165.00
0100Cement modified recycled base (10" unif)-curing method B (3063232)SY37,976$11.00$14.10
0110Cement modified recycled base (12" unif)-curing method B (3063242)SY64,287$12.00$13.30
0120Portland cement for cement modified recycled base course (3064000)TON4,089$250.00$250.00
0130HMA shoulder widening course (3104000)TON489.28$125.00$196.85
0140Liquid asphalt binder PG64-22 (4011004)TON1,824.76$735.00$650.00
0150Full depth asph. pav. patching 8" unif (4012080)SY13,000$95.00$90.45
0160Milling existing asphalt pavement 1.5" (4013115)SY7,121$3.25$5.45
0170Milling existing asphalt pavement 1.75" (4013117)SY7,145$3.75$6.85
0180Milling existing asphalt pavement 2.0" (4013120)SY129,458$4.25$3.30
0190Milling existing asphalt pavement (variable) (4013990)SY12,116$9.00$10.95
0200Asphalt intermediate course type B (4030320)TON3,646.72$100.00$126.35
0210Asphalt surface course type B (4040320)TON18,746.97$105.00$111.35
0220Asphalt surface course type C (4040340)TON8,506.03$95.00$118.00
0230Driveway paving-surface type C (4047220)TON577.88$230.00$285.00
0240Traffic control (6011000)LS1$850,000$759,000
0250Permanent construction signs (ground mounted) (6051120)SF4,956$5.65$5.85
02604" white broken lines -(gaps excluded)-fast dry paint (6240005)LF46,670$0.13$0.15
02704" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF189,088$0.13$0.15
02808"white solid lines (crosswalk& channelization)fast dry paint (6240015)LF11,500$0.13$0.15
029024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF4,203$0.55$0.55
0300White single arrow (left, straight, right)-fast dry paint (6240030)EACH46$15.75$15.10
0310White word message "only"- fast dry paint (6240035)EACH32$15.75$15.10
0320White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040)EACH6$15.75$15.10
0330Railroad crossing symbols - fast dry paint (6240045)EACH10$26.25$25.15
03404" yellow broken lines(gaps exc) - fast dry paint (6240105)LF7,220$0.13$0.15
03504"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF556,056$0.13$0.15
03606" yellow solid line on curb/median - fast dry paint (6240112)LF300$1.60$1.55
03704" white broken lines -(gaps excluded) - epoxy paint slow cure (6261005)LF80$5.25$5.05
03804" white solid lines (PVT. edge lines) epoxy paint slow cure (6261010)LF484$5.25$5.05
03904"yellow solid lines- PVT.edge&no passing zone - epoxy paint slow cure (6261110)LF814$5.25$5.05
04004" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF11,700$0.90$0.90
04104" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF82,822$0.50$0.50
04208" white solid lines thermoplastic - 125 mil. (6271015)LF5,750$3.00$2.90
043024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF2,064$8.95$8.55
0440White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030)EACH23$78.95$75.40
0450White word message "only" - thermoplastic - 125 mil. (6271035)EACH16$89.50$85.45
0460White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040)EACH3$157.90$150.75
0470Railroad crossing symbols - thermoplastic - 125 mil. (6271045)EACH5$420.00$403.00
04804" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064)LF1,470$0.50$0.50
04904" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF128,657$0.50$0.50
0500Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH588$6.30$6.05
0510Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005)EACH80$6.30$6.05
0520Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH1,642$6.30$6.05
0530Milled-in rumble strip (6321000)MI11.70$525.00$1,350.00
0540Furnish & install 1.0" schedule 80 PVC conduit (6750275)LF3,150$26.05$15.50
0550Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413)LF56,550$0.60$3.65
0560Sawcut for loop detector (6780495)LF20,550$9.50$6.75
0570F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518)EACH45$740.00$3,615.00
0580Temporary adjustment of traffic signal equipment (6885993)EACH15$6,315.00$30,000
0590Concrete curb and gutter(1'-6") vertical face (7203110)LF250$28.50$40.00
0600Concrete sidewalk(4" uniform) (7204100)SY345$75.00$75.00
0610Detectable warning material (7204900)SF387.50$58.00$55.00
0620Pedestrian ramp construction (7209000)SY700$110.50$195.00
0630Surface applied detectable warning (7209100)SF170$58.00$60.00
0640Premash reset W-beam strong post system (8051900)LF6,225$17.00$16.70
0650Premash type T TL3 leading 50' (8057100)EACH37$3,265.00$3,180.00
0660Permanent grassing for non-permitted resurfacing projects (8100102)ACRE7.37$3,425.00$3,235.00
SCDOT contract 3769260: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of March 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy