| 0010 | Mobilization (1031000) | LS | 1 | $155,500 | $167,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $30,000 | $100,000 |
| 0030 | Selected clearing & grubbing (2014000) | LS | 1 | $83,000 | $43,500 |
| 0040 | Removal & disposal of existing pavement (2023000) | SY | 977 | $37.00 | $41.00 |
| 0050 | Removal & disposal of existing curb (2024100) | LF | 215 | $17.00 | $17.00 |
| 0060 | Removal of exist. guardrail (2027801) | LF | 640 | $1.00 | $1.00 |
| 0070 | Unclassified excavation (2031000) | CY | 674 | $35.00 | $71.00 |
| 0080 | Borrow excavation (2033000) | CY | 1,024 | $32.00 | $42.00 |
| 0090 | Station grading (2035000) | STA | 28.15 | $1,200.00 | $2,400.00 |
| 0100 | Maintenance stone (3059900) | TON | 58.08 | $80.00 | $86.50 |
| 0110 | Cement modified recycled base (10" unif)-curing method B (3063232) | SY | 37,717 | $9.40 | $8.00 |
| 0120 | Portland cement for cement modified recycled base course (3064000) | TON | 1,150.50 | $260.00 | $245.00 |
| 0130 | Liquid asphalt binder PG64-22 (4011004) | TON | 537.07 | $630.00 | $670.00 |
| 0140 | Full depth asph. pav. patching 10"unif (4012100) | SY | 1,467 | $90.00 | $115.00 |
| 0150 | Milling existing asphalt pavement 1.5" (4013115) | SY | 720 | $11.00 | $6.85 |
| 0160 | Milling existing asphalt pavement 1.75" (4013117) | SY | 12,847 | $3.00 | $2.65 |
| 0170 | Milling existing asphalt pavement (variable) (4013990) | SY | 4,770 | $11.00 | $10.40 |
| 0180 | Asphalt intermediate course type C (4030330) | TON | 2,675.20 | $79.00 | $65.70 |
| 0190 | Asphalt surface course type B (4040320) | TON | 3,169.17 | $82.00 | $78.00 |
| 0200 | Asphalt surface course type C (4040340) | TON | 2,921.99 | $84.00 | $85.65 |
| 0210 | Driveway paving-surface type C (4047220) | TON | 685.50 | $160.00 | $219.00 |
| 0220 | Asphalt surface treat (single treatment) (4060010) | SY | 37,717 | $2.30 | $2.80 |
| 0230 | Traffic control (6011000) | LS | 1 | $132,000 | $331,000 |
| 0240 | Permanent construction signs (ground mounted) (6051120) | SF | 1,192 | $6.00 | $6.00 |
| 0250 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 1,000 | $0.12 | $0.12 |
| 0260 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 111,639 | $0.12 | $0.12 |
| 0270 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 864 | $0.12 | $0.12 |
| 0280 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 1,382 | $1.00 | $1.00 |
| 0290 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 18 | $10.00 | $10.00 |
| 0300 | White word message "only"- fast dry paint (6240035) | EACH | 7 | $10.00 | $10.00 |
| 0310 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 8 | $10.00 | $10.00 |
| 0320 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 860 | $0.12 | $0.12 |
| 0330 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 126,631 | $0.12 | $0.12 |
| 0340 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 360 | $2.00 | $2.00 |
| 0350 | 4" white solid lines (PVT. edge lines) epoxy paint slow cure (6261010) | LF | 400 | $5.00 | $5.00 |
| 0360 | 4" yellow broken lines(gaps exc) epoxy paint slow cure (6261105) | LF | 50 | $5.00 | $5.00 |
| 0370 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 614 | $0.75 | $0.75 |
| 0380 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 28,079 | $0.44 | $0.44 |
| 0390 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 407 | $2.50 | $2.50 |
| 0400 | 24IN X 36IN white triang. yield bar (gaps exc)thermo-125MIL (6271024) | LF | 16 | $25.00 | $25.00 |
| 0410 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 796 | $8.50 | $8.50 |
| 0420 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 8 | $100.00 | $100.00 |
| 0430 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 3 | $100.00 | $100.00 |
| 0440 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 4 | $100.00 | $100.00 |
| 0450 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 14,740 | $0.44 | $0.44 |
| 0460 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 19,123 | $0.44 | $0.44 |
| 0470 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 16 | $6.00 | $6.00 |
| 0480 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 283 | $6.00 | $6.00 |
| 0490 | Milled-in rumble strip (6321000) | MI | 2.74 | $2,600.00 | $500.00 |
| 0500 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 40 | $24.75 | $24.75 |
| 0510 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 1,600 | $0.75 | $0.75 |
| 0520 | Sawcut for loop detector (6780495) | LF | 500 | $12.00 | $12.00 |
| 0530 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 2 | $464.00 | $464.00 |
| 0540 | Temporary adjustment of traffic signal equipment (6885993) | EACH | 2 | $6,000.00 | $6,000.00 |
| 0550 | 15" smooth wall pipe (7143615) | LF | 328 | $160.00 | $156.00 |
| 0560 | 18" smooth wall pipe (7143618) | LF | 56 | $190.00 | $186.00 |
| 0570 | Concrete collar for UP to 24" pipe (7197052) | EACH | 1 | $4,000.00 | $4,000.00 |
| 0580 | Catch basin T-17 (convert C.B. type 5) (7198291) | EACH | 1 | $7,900.00 | $7,900.00 |
| 0590 | Concrete curb and gutter(1'-6") vertical face (7203110) | LF | 95 | $47.00 | $47.00 |
| 0600 | Concrete curb and gutter (2'-0") ogee (7203230) | LF | 40 | $49.00 | $48.00 |
| 0610 | Concrete curb and gutter (2'-6") vertical face (7203240) | LF | 80 | $50.00 | $50.00 |
| 0620 | Concrete sidewalk(4" uniform) (7204100) | SY | 107 | $84.00 | $84.00 |
| 0630 | Detectable warning material (7204900) | SF | 400 | $40.00 | $40.00 |
| 0640 | Concrete driveway(6" uniform) (7205000) | SY | 50 | $118.00 | $118.00 |
| 0650 | Pedestrian ramp construction (7209000) | SY | 800 | $130.00 | $130.00 |
| 0660 | Rip-rap (class B) (8041020) | TON | 60 | $100.00 | $124.00 |
| 0670 | Geotextile for erosion control under riprap(class 2)type B (8048205) | SY | 30 | $20.00 | $55.00 |
| 0680 | MT3 leading end treatment TL3 (8051151) | EACH | 1 | $3,400.00 | $2,873.00 |
| 0690 | MB trailing end treatment (8051710) | EACH | 1 | $1,600.00 | $1,200.00 |
| 0700 | MGS3 GR standard shoulder (8052100) | LF | 237.50 | $24.00 | $24.00 |
| 0710 | Premash W-to-thrie bridge conn WTBBC (8056980) | EACH | 4 | $2,400.00 | $2,870.00 |
| 0720 | Premash type T TL3 leading 50' (8057100) | EACH | 4 | $3,200.00 | $2,870.00 |
| 0730 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 1.78 | $7,800.00 | $4,375.00 |
| 0740 | Temporary erosion control blanket (ecb) (8151110) | MSY | 1 | $2,450.00 | $2,450.00 |
| 0750 | Sediment tubes for ditch checks (8152007) | LF | 200 | $10.00 | $10.00 |
| 0760 | Silt fence (8153000) | LF | 300 | $5.00 | $7.50 |