SCDOT contract 5774770 bid tabulation

2026 District 7 Fast Dry Paint Contract. Let by South Carolina DOT on October 14, 2025, District 7, District 2. 5 bids received; low bid $243,801 by T&H Construction and Markings, LLC.

Owner
South Carolina DOT
Letting
14 OCT 2025
Pay items
9
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1T&H Construction and Markings, LLC$243,801Low
2Peek Pavement Marking, LLC$245,487+1.0%
3Alpha Space Control, LLC$352,395+45%
4Oglesby Construction, Inc.$359,237+47%
5TRP Construction Group, LLC$425,274+74%
SCDOT contract 5774770: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. T&H Construction and Markings, LLC2. Peek Pavement Marking, LLC3. Alpha Space Control, LLC4. Oglesby Construction, Inc.5. TRP Construction Group, LLC
0010Mobilization (1031000)LS1$3,000.00$2,500.00$6,500.00$38,000$15,000
0020Bonds and insurance (1032010)LS1$9,000.00$1,500.00$5,300.00$2,000.00$3,500.00
0030Traffic control (6011000)LS1$3,000.00$2,500.00$3,500.00$25,000$5,000.00
00404" white broken lines -(gaps excluded)-fast dry paint (6240005)LF12,850$0.07$0.15$0.11$0.09$0.15
00504" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF1,533,135$0.07$0.07$0.10$0.09$0.12
00608"white solid lines (crosswalk& channelization)fast dry paint (6240015)LF720$0.10$1.00$0.16$0.40$1.50
007024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF3,060$0.50$2.00$0.98$0.60$2.00
00804" yellow broken lines(gaps exc) - fast dry paint (6240105)LF156,820$0.07$0.10$0.11$0.09$0.15
00904"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF1,542,890$0.07$0.07$0.11$0.09$0.12
SCDOT contract 5774770: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy