TDOT contract CN262038 bid tabulation

R2bvar-m3-067 the random on-call signing on various interstate and state routes. Let by Tennessee DOT on May 8, 2026, Counties Bledsoe, Bradley, Cannon, Clay, Coffee, Cumberland, Dekalb, Fentress, Franklin, Grundy, Hamilton, Jackson, Marion, Mcminn, Meigs, Overton, Pickett, Polk, Putnam, Rhea, Sequatchie, Van Buren, Warren, And White. 3 bids received; low bid $250,000 by Superior Traffic Control, LLC.

Owner
Tennessee DOT
Letting
08 MAY 2026
Pay items
29
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Superior Traffic Control, LLC$250,000Low
2Vulcan Construction Materials, LLC$250,0940.0%
3Lu, Inc.$350,890+40%
TDOT contract CN262038: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Superior Traffic Control, LLC2. Vulcan Construction Materials, LLC3. Lu, Inc.
1Lane closure (712-01.02)EACH5$450.00$450.00$607.50
2Lane closure(night work) (712-01.03)EACH4$1,000.00$1,250.00$1,691.28
3Arrow board (type C) (712-08.03)EACH3$350.00$450.00$607.50
4Truck mounted attenuator W/mssage board (712-08.20)DAY20$1,450.00$1,350.00$1,973.16
5Class A concrete (foundation for sign supports) (713-01.01)CY8$750.00$950.00$1,409.40
6Steel bar reinforcement(foundation for sign supports) (713-01.02)LB3,000$3.33$3.25$4.58
7Steel I-beams & W-F beams for sign supports (713-04.02)LB250$7.50$7.75$9.42
8Steel I-beams & WF-beams(breakaway) sign support (713-06)LB8,000$7.69$7.75$10.92
9Perforated/knockout square tube post (713-11.02)LB100$6.00$5.75$7.29
10Square tube sign support (713-11.05)LB500$6.00$6.00$7.29
11Square post slip base (713-11.24)EACH10$655.00$525.00$877.50
12Flat sheet aluminum signs (0.080" thick) (713-13.02)SF120$18.00$16.50$18.23
13Flat sheet aluminum signs (0.100" thick) (713-13.03)SF120$20.00$17.00$20.66
14Flat sheet alum signs overlay (0.080" thick) (713-13.12)SF10$14.00$16.00$18.23
15Florescent yellow sign sheeting (713-13.14)SF45$4.50$4.75$6.99
16Extruded aluminum panel signs (713-14)SF3,000$33.00$32.00$45.10
17Removal of existing sign post (713-15.01)EACH1$100.00$50.00$60.75
18Removal of larger barrier mounted signs with saddle supports (713-15.03)EACH1$100.00$50.00$60.75
19Removal of small barrier mounted signs W/ flat plat supports (713-15.10)EACH1$99.00$50.00$60.75
20Remove sign, support & footing (713-15.36)EACH30$300.00$450.00$607.50
21Installation of sign message(letter,#,arrow,shield) (713-15.37)SF5$15.00$15.00$18.23
22Extruded aluminum panels for overlaying background (713-15.38)SF5$15.00$25.00$18.23
23Reset ground mounted sign (713-16.90)EACH10$500.00$550.00$704.70
24Install auxiliary support for exit number panel (713-17.02)EACH15$105.00$100.00$140.94
25Install auxiliary support on existing sign (713-17.04)LF15$8.00$7.50$10.33
26Sign adjustments (713-20.30)EACH2$300.00$300.00$364.50
27Graffiti removal (713-20.40)SF150$4.79$3.50$4.25
28Barrier mounted sign support (square tube) (713-30.09)EACH2$1,000.00$475.00$546.75
29Barrier mounted sign support (perf/knockout) (713-30.10)EACH2$400.00$475.00$546.75
TDOT contract CN262038: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy