TDOT contract CN263063 bid tabulation
008,crp-9308(12),50svar-f3-002 the traffic signal modernization improvements at various intersections along various u.s. and state routes. Let by Tennessee DOT on October 2, 2026, Counties Humphreys, Lawrence, And Smith. 2 bids received; low bid $189,812 by Stansell Electric Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 02 OCT 2026
- Pay items
- 20
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stansell Electric Company, Inc. | $189,812 | Low |
| 2 | Davis H. Elliot Construction Company, Inc. | $211,200 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stansell Electric Company, Inc. | 2. Davis H. Elliot Construction Company, Inc. |
|---|---|---|---|---|---|
| 1 | Traffic control (712-01) | LS | 1 | $14,250 | $13,225 |
| 2 | Mobilization (717-01) | LS | 1 | $18,600 | $10,560 |
| 3 | Signal head assembly (130 A3 with backplate) (730-02.03) | EACH | 1 | $1,205.00 | $1,750.00 |
| 4 | Signal head assembly (130 pole mounted) (730-02.08) | EACH | 1 | $934.00 | $1,550.00 |
| 5 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 9 | $1,210.00 | $1,700.00 |
| 6 | Signal head assembly (130 A2 with backplate) (730-02.11) | EACH | 1 | $1,235.00 | $1,750.00 |
| 7 | Signal head assembly (150 A2H with backplate) (730-02.17) | EACH | 1 | $1,835.00 | $2,100.00 |
| 8 | Signal head assembly (150 A4H with backplate) (730-02.20) | EACH | 1 | $1,850.00 | $2,050.00 |
| 9 | Signal cable - 7 conductor (730-08.03) | LF | 2,646 | $3.10 | $4.25 |
| 10 | Signal cable - 9 conductor (730-08.04) | LF | 1,012 | $3.20 | $5.00 |
| 11 | Span wire assembly (730-09.20) | LF | 852 | $3.90 | $4.00 |
| 12 | Tether wire assembly - 1/4" diameter (730-10.01) | LF | 763 | $4.00 | $4.00 |
| 13 | Vehicle detector (radar - advance) (730-13.13) | EACH | 2 | $9,140.00 | $8,500.00 |
| 14 | Vehicle detector (radar-single unit multi-approach) (730-13.18) | EACH | 2 | $19,050 | $18,000 |
| 15 | Cabinet maintenance (filter) (730-15.16) | EACH | 7 | $110.00 | $500.00 |
| 16 | Modify cabinet (controller programming) (730-15.25) | EACH | 1 | $751.00 | $2,750.00 |
| 17 | Modify cabinet (radar installation) (730-15.26) | EACH | 2 | $408.00 | $2,750.00 |
| 18 | Controller (atc) (730-16.04) | EACH | 4 | $5,990.00 | $6,500.00 |
| 19 | Cabinet monitor unit (730-16.51) | EACH | 4 | $1,550.00 | $2,750.00 |
| 20 | Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11) | EACH | 16 | $2,020.00 | $2,400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.