Stansell Electric Company, Inc.: TDOT bid record
Stansell Electric Company, Inc. submitted 37 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 02 OCT 2026, and was the low bidder on 17 of them (46%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $22,887,588
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 1 | 50% |
| 2020 | 1 | 0 | 0% |
| 2023 | 4 | 1 | 25% |
| 2024 | 12 | 9 | 75% |
| 2025 | 8 | 2 | 25% |
| 2026 | 10 | 4 | 40% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Hamilton County | 2 | 2 | 100% |
| Coffee County | 2 | 1 | 50% |
| Shelby County | 2 | 0 | 0% |
| Robertson County | 1 | 1 | 100% |
| Franklin County | 1 | 1 | 100% |
| Knox County | 1 | 1 | 100% |
| Sullivan County | 1 | 0 | 0% |
| Counties Fentress, Franklin, Marshall, Rhea, And Union | 1 | 0 | 0% |
| Sumner County | 1 | 1 | 100% |
| Campbell County | 1 | 1 | 100% |
| Lawrence County | 1 | 1 | 100% |
| Williamson County | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sediment removal | 209-05 | CY | 12 | 8 (67%) | $55.50 | $31.36 |
| Signs (construction) | 712-06 | SF | 21 | 6 (29%) | $9.00 | $8.00 |
| Seeding (with mulch) | 801-01 | UNIT | 15 | 6 (40%) | $89.52 | $84.63 |
| Signal cable - 7 conductor | 730-08.03 | LF | 15 | 6 (40%) | $3.10 | $2.75 |
| Signal head assembly (130 with backplate) | 730-02.09 | EACH | 15 | 6 (40%) | $1,215.00 | $1,402.19 |
| High-visibility construction fence | 707-08.11 | LF | 9 | 5 (56%) | $2.30 | $3.30 |
| Removal of signal equipment | 730-01.02 | EACH | 9 | 5 (56%) | $3,500.00 | $3,750.00 |
| Cabinet (eight phase base mounted) | 730-15.32 | EACH | 8 | 5 (63%) | $19,461 | $25,000 |
| Vehicle detector (radar - stop line) | 730-13.12 | EACH | 5 | 5 (100%) | $8,115.00 | $11,200 |
| Conduit bank (type 2) | 725-22.22 | LF | 5 | 5 (100%) | $8.00 | $15.35 |
| Water (seeding & sodding) | 801-03 | MG | 17 | 4 (24%) | $250.00 | $100.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 16 | 4 (25%) | $47.25 | $34.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Davis H. Elliot Construction Company, Inc. | 21 | 10 of 21 |
| Shelby Electric Company, Inc. | 10 | 4 of 10 |
| Lumin8 Transportation Technologies, LLC | 6 | 1 of 6 |
| NABCO Electric Company, Inc. | 4 | 1 of 4 |
| Progression Electric, LLC | 4 | 2 of 4 |
| Traffic Management Solutions, LLC | 3 | 1 of 3 |
| Rogers Group, Inc. | 2 | 2 of 2 |
| Wade Electric Company, Inc. | 2 | 2 of 2 |
| S & W Contracting Company, LLC | 2 | 2 of 2 |
| Dement Construction Company, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN264058 | Counties Benton, Gibson, Obion, And Weakley | F3-008,crp-9408(14),92svar-f3-001 the traffic signal modernization improvements at various intersections along various u.s. and state routes | 1 of 3 | $320,227 | Low, 14% under the second |
| 02 OCT 2026 | CN262064 | Bradley County | The installation of signals on u.s. 11 (s.r. 2) at the intersection of 17th street northwest (l.m. 9.93) in cleveland | 2 of 2 | $120,992 | +46% |
| 02 OCT 2026 | CN261075 | Counties Cocke, Hawkins, Jefferson, Monroe, Scott, And Washington | 009,crp-32(108),15s032-f3-005,crp-33(169),62s033-f3-009,crp- 34(144),45s034-f3-004,crp-34(145),90s034-f3-007 the traffic signal modernizatio | 1 of 3 | $715,638 | Low, 11% under the second |
| 02 OCT 2026 | CN262062 | Counties Franklin, Hamilton, Jackson, Mcminn, Putnam, Rhea, And White | F3-010,crp-30(100),54s030-f3-006,crp-319(19),33s319-f3-007,crp- 53(66),44s053-f3-006,crp-84(21),71s084-f3-004 the traffic signal modernizati | 2 of 2 | $498,870 | 0.0% |
| 02 OCT 2026 | CN263063 | Counties Humphreys, Lawrence, And Smith | 008,crp-9308(12),50svar-f3-002 the traffic signal modernization improvements at various intersections along various u.s. and state routes | 1 of 2 | $189,812 | Low, 11% under the second |
| 14 AUG 2026 | CN261059 | Carter And Unicoi Counties | The interchange lighting on i-26 at s.r. 359 (l.m. 1.66 - l.m. 2.22) and at s.r. 173 (l.m. 3.83 - l.m. 4.44) | 3 of 3 | $2,091,709 | +24% |
| 08 MAY 2026 | CN263043 | Davidson County | The modification of existing pedestrian signalized intersections on various local and state routes | 1 of 2 | $1,068,195 | Low, 78% under the second |
| 08 MAY 2026 | CN261036 | Greene County | The traffic signal modernization on s.r. 70 (asheville highway) at the intersection of vann road in greeneville (l.m. 14.65) | 2 of 2 | $217,270 | +32% |
| 06 FEB 2026 | CN262007 | Coffee County | The upgrade of interchange lighting on i-24 at exit 110 (s.r. 53, l.m. 13.00) and exit 114 (u.s. 41/s.r. 2, l.m. 17.25) in manchester | 3 of 4 | $820,844 | +18% |
| 06 FEB 2026 | CN263009 | Wilson County | The interchange lighting along i-40 at golden bear gateway/beckwith road (exit 229) | 2 of 4 | $1,585,153 | +5.0% |
| 03 OCT 2025 | CNZ269 | Counties Benton, Carroll, Decatur, Dickson, Fayette, Haywood, Henderson, Humphreys, And Madison | Nh-i-9900(159),99i040-f3-004 the expansion of the smartway intelligent transportation system (its) on i-40 from the shelby/fayette county li | 2 of 3 | $28,107,640 | +4.0% |
| 03 OCT 2025 | CNZ273 | Counties Dyer, Giles, Marshall, And Roane | The expansion of the rural smartway intelligent transportation system (its) on i-155 in dyer county, on i-65 in giles and marshall counties, | 1 of 2 | $4,527,341 | Low, 10% under the second |
| 03 OCT 2025 | CNZ275 | Shelby County | The expansion of the smartway intelligent transportation system (its) on s.r. 385 from near mile marker 7 (l.m. 6.9) in shelby county crossi | 2 of 3 | $6,806,764 | +18% |
| 27 JUN 2025 | CNZ185 | Counties Marion, Montgomery, And Shelby | The installation of tdot rural smartway intelligent transportation system (its) infrastructure in various locations | 2 of 4 | $3,322,213 | +7.0% |
| 09 MAY 2025 | CNZ162 | Shelby County | The installation of vehicle detection and wrong way prevention technology at five (5) interchanges on i-240 and i-40 | 2 of 3 | $4,879,518 | +68% |
| 21 MAR 2025 | CNZ082 | Gibson County | The installation of signals on u.s. 45e (s.r. 43, south first street) at the intersection of kefauver drive (l.m. 8.70) in milan | 3 of 3 | $834,703 | +26% |
| 21 MAR 2025 | CNZ100 | Rutherford County | The interchange lighting on i-24 at joe b. jackson parkway (l.m. 20.26 - l.m. 20.94) (exit 84) | 1 of 1 | $1,585,152 | Low |
| 07 FEB 2025 | CNZ077 | Haywood County | The interchange lighting on i-40 at the junction of u.s. 70 (s.r. 1) (exit 66, l.m. 0.65) | 3 of 4 | $1,292,107 | +31% |
| 06 DEC 2024 | CNY304 | Campbell County | The traffic signal modernization on u.s. 25w (s.r. 9) from near s.r. 297 (south main street) (l.m. 0.21) to near kentucky street (l.m. 0.37) | 1 of 1 | $349,727 | Low |
| 06 DEC 2024 | CNY278 | Lawrence County | The installation of signals on u.s. 43 (s.r. 6) at the intersection of u.s. 64 (s.r. 15) (l.m. 18.04) in lawrenceburg | 1 of 1 | $322,806 | Low |
| 06 DEC 2024 | CNY215 | Williamson County | The intersection improvements including signals on u.s. 31a (s.r. 11, nolensville road) from south of sanford road (l.m. 13.25) to south of | 2 of 5 | $3,542,183 | +8.0% |
| 04 OCT 2024 | CNY209 | Sumner County | The miscellaneous safety improvements on u.s. 31e (s.r. 6) from rock bridge road (l.m. 20.75) to near mount vernon road (l.m. 24.91) | 1 of 1 | $355,559 | Low |
| 16 AUG 2024 | CNY190 | Counties Fentress, Franklin, Marshall, Rhea, And Union | The signal upgrades at various locations in jamestown, decherd, cornersville, dayton, and maynardville | 3 of 3 | $274,954 | +41% |
| 16 AUG 2024 | CNY192 | Hamilton County | The lighting upgrade of the mccallie tunnels in chattanooga | 1 of 2 | $1,495,230 | Low, 24% under the second |
| 21 JUN 2024 | CNY904 | Franklin County | The signal upgrades at three (3) intersections on u.s. 41a (s.r. 16) from kroger drive (l.m. 10.30) to s.r. 127 (aedc road) (l.m. 11.32) in | 1 of 5 | $118,873 | Low, 5.0% under the second |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way