TDOT contract CNZ082 bid tabulation
The installation of signals on u.s. 45e (s.r. 43, south first street) at the intersection of kefauver drive (l.m. 8.70) in milan. Let by Tennessee DOT on March 21, 2025, Gibson County. 3 bids received; low bid $664,593 by Wade Electric Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 21 MAR 2025
- Pay items
- 82
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wade Electric Company, Inc. | $664,593 | Low |
| 2 | Shelby Electric Company, Inc. | $761,121 | +15% |
| 3 | Stansell Electric Company, Inc. | $834,703 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wade Electric Company, Inc. | 2. Shelby Electric Company, Inc. | 3. Stansell Electric Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $6,000.00 | $8,500.00 | $18,500 |
| 2 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 175 | $19.00 | $66.00 | $71.00 |
| 3 | Removal of asphalt pavement (202-03.01) | SY | 90 | $19.00 | $51.70 | $138.00 |
| 4 | Removal of curb (concrete) (202-08.10) | LF | 10 | $25.00 | $104.50 | $1,245.00 |
| 5 | Water (203-06) | MG | 1 | $100.00 | $275.00 | $79.00 |
| 6 | Embankment (compacted in place) (203-10) | CY | 50 | $50.00 | $82.50 | $24.00 |
| 7 | Sediment removal (209-05) | CY | 5 | $100.00 | $55.00 | $39.00 |
| 8 | Curb inlet protection (type 2) (209-09.41) | EACH | 6 | $300.00 | $550.00 | $304.00 |
| 9 | Saw cutting asphalt pavement (407-20.05) | LF | 385 | $5.00 | $17.60 | $8.50 |
| 10 | Concrete sidewalk (4 ") (701-01.01) | SF | 1,910 | $14.50 | $16.50 | $24.50 |
| 11 | Concrete curb ramp (701-02.03) | SF | 615 | $20.00 | $49.50 | $20.50 |
| 12 | Concrete curb (702-01) | CY | 5 | $1,000.00 | $1,120.00 | $2,265.00 |
| 13 | Concrete combined curb & gutter (702-03) | CY | 25 | $1,200.00 | $907.50 | $789.00 |
| 14 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 6 | $400.00 | $770.00 | $304.00 |
| 15 | Traffic control (712-01) | LS | 1 | $28,850 | $42,000 | $52,200 |
| 16 | Flexible drums (channelizing) (712-04.01) | EACH | 50 | $35.00 | $39.60 | $43.50 |
| 17 | Signs (construction) (712-06) | SF | 200 | $8.00 | $8.50 | $9.60 |
| 18 | Arrow board (type C) (712-08.03) | EACH | 1 | $1,200.00 | $2,000.00 | $2,125.00 |
| 19 | Sign post delineation enhancement (713-02.21) | LF | 24 | $6.00 | $8.80 | $9.70 |
| 20 | Street name sign (rigid 0.100IN thick (713-14.21) | SF | 64 | $75.00 | $85.00 | $102.00 |
| 21 | Removal of signs, posts and footings (713-15) | LS | 1 | $150.00 | $275.00 | $304.00 |
| 22 | Suspended flat sheet aluminum sign (0.080" thick) (713-15.07) | EACH | 2 | $375.00 | $450.00 | $127.00 |
| 23 | Changeable message sign unit (713-16.01) | EACH | 3 | $5,900.00 | $7,090.00 | $7,830.00 |
| 24 | Signs (W3-3, 36"X36") (713-16.21) | EACH | 3 | $575.00 | $363.00 | $401.00 |
| 25 | Signs (R1-1, 36"X36") (713-16.22) | EACH | 1 | $575.00 | $302.00 | $328.00 |
| 26 | Signs (R2-1, 24"X30") (713-16.23) | EACH | 1 | $550.00 | $270.00 | $297.00 |
| 27 | Signs (R10-7, 24"X30") (713-16.24) | EACH | 1 | $550.00 | $270.00 | $297.00 |
| 28 | Pull boxes (type C) (714-05.04) | EACH | 2 | $1,200.00 | $1,250.00 | $776.00 |
| 29 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 47 | $45.00 | $49.50 | $54.50 |
| 30 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 52 | $45.00 | $49.50 | $54.50 |
| 31 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 125 | $39.00 | $42.90 | $47.50 |
| 32 | Plastic pavement marking (stop line) (716-02.05) | LF | 180 | $19.00 | $20.90 | $23.00 |
| 33 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 8 | $210.00 | $221.00 | $255.00 |
| 34 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 185 | $4.00 | $4.40 | $4.90 |
| 35 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 240 | $49.00 | $53.90 | $59.50 |
| 36 | Plastic pavement marking (8IN line) (716-02.12) | LM | 1 | $21,120 | $23,232 | $25,650 |
| 37 | Plastic word pavement marking (only) (716-03.01) | EACH | 2 | $240.00 | $248.00 | $291.00 |
| 38 | Plastic word pavement marking (DO not block ) (716-03.09) | EACH | 1 | $2,000.00 | $2,200.00 | $2,430.00 |
| 39 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 1 | $450.00 | $495.00 | $546.00 |
| 40 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 105 | $11.00 | $12.10 | $13.50 |
| 41 | Removal of pavement marking (8" barrier line) (716-08.02) | LF | 355 | $2.00 | $2.20 | $2.40 |
| 42 | Removal of pavement marking (cross-walk) (716-08.03) | LF | 430 | $15.00 | $16.50 | $18.00 |
| 43 | Removal of pavement marking (channelization striping) (716-08.04) | SY | 25 | $35.00 | $38.50 | $42.50 |
| 44 | Removal of pavement marking (stop line) (716-08.05) | LF | 135 | $15.00 | $16.50 | $18.00 |
| 45 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 9 | $190.00 | $209.00 | $231.00 |
| 46 | Removal of pavement marking (straight-turn arrow) (716-08.07) | EACH | 1 | $250.00 | $275.00 | $304.00 |
| 47 | Removal of pavement marking (dotted line) (716-08.09) | LF | 110 | $2.00 | $2.20 | $2.40 |
| 48 | Removal of pavement marking (transverse shoulder) (716-08.10) | LF | 105 | $7.00 | $7.70 | $8.50 |
| 49 | Removal of pavement marking (line) (716-08.20) | LM | 1 | $5,000.00 | $5,500.00 | $6,070.00 |
| 50 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1 | $9,000.00 | $9,900.00 | $10,950 |
| 51 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 1 | $4,200.00 | $4,620.00 | $5,100.00 |
| 52 | Mobilization (717-01) | LS | 1 | $65,000 | $75,000 | $83,200 |
| 53 | Removal of signal equipment (730-01.02) | EACH | 1 | $3,000.00 | $4,500.00 | $3,835.00 |
| 54 | Signal head assembly (130 A3 with backplate) (730-02.03) | EACH | 2 | $1,490.00 | $1,650.00 | $1,950.00 |
| 55 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 6 | $1,530.00 | $1,650.00 | $1,760.00 |
| 56 | Signal head assembly (140 A1 with backplate) (730-02.14) | EACH | 1 | $1,900.00 | $2,000.00 | $2,215.00 |
| 57 | Signal head assembly (140 A4F with backplate) (730-02.59) | EACH | 4 | $1,920.00 | $2,000.00 | $2,225.00 |
| 58 | Install pull box (type B) (730-03.21) | EACH | 4 | $950.00 | $1,050.00 | $1,705.00 |
| 59 | Electrical service connection (730-05.01) | EACH | 1 | $2,500.00 | $3,500.00 | $6,180.00 |
| 60 | Signal cable - 5 conductor (730-08.02) | LF | 2,500 | $2.25 | $1.75 | $2.50 |
| 61 | Signal cable - 7 conductor (730-08.03) | LF | 1,650 | $2.50 | $3.00 | $2.80 |
| 62 | Conduit 2" diameter (PVC schedule 40) (730-12.02) | LF | 220 | $15.00 | $35.00 | $23.50 |
| 63 | Conduit 3" diameter (PVC schedule 40) (730-12.03) | LF | 50 | $30.00 | $40.00 | $33.00 |
| 64 | Conduit 2" diameter (RGS) (730-12.08) | LF | 20 | $50.00 | $50.00 | $72.00 |
| 65 | Conduit 3" diameter (directional bore) (730-12.24) | LF | 350 | $32.00 | $60.00 | $40.50 |
| 66 | Vehicle detector (siren activated priority control) (730-13.07) | EACH | 3 | $7,000.00 | $5,500.00 | $1,160.00 |
| 67 | Vehicle detector (360-degree camera) (730-13.14) | EACH | 1 | $49,000 | $35,000 | $50,900 |
| 68 | Cabinet (eight phase base mounted) (730-15.32) | EACH | 1 | $23,500 | $29,500 | $31,050 |
| 69 | Controller (atc) (730-16.04) | EACH | 1 | $7,000.00 | $4,550.00 | $7,955.00 |
| 70 | Pedestal pole (type A) (730-23.28) | EACH | 3 | $2,354.00 | $3,875.00 | $3,385.00 |
| 71 | Cantilever signal support (2 @ 50' & 65') (730-25.05) | EACH | 1 | $50,670 | $51,500 | $56,900 |
| 72 | Cantilever signal support (1 arm @ 65') (730-25.13) | EACH | 1 | $39,000 | $40,000 | $40,350 |
| 73 | Cantilever signal support (1 arm @ 80') (730-25.16) | EACH | 1 | $43,255 | $44,000 | $55,450 |
| 74 | Pedestrian pushbutton post (730-26.06) | EACH | 1 | $1,900.00 | $3,500.00 | $2,535.00 |
| 75 | Pedestrian pushbutton with 15IN sign (730-26.09) | EACH | 1 | $1,392.00 | $1,500.00 | $1,775.00 |
| 76 | Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11) | EACH | 5 | $2,100.00 | $2,350.00 | $2,435.00 |
| 77 | Battery back-UP system (730-35.06) | EACH | 1 | $10,200 | $11,000 | $11,900 |
| 78 | Temporary traffic signal system (730-40) | EACH | 1 | $25,000 | $25,000 | $18,330 |
| 79 | Temporary sediment tube 12IN (740-11.02) | LF | 690 | $10.00 | $11.00 | $5.50 |
| 80 | Removal of concrete curb & gutter (797-11.65) | LF | 385 | $9.00 | $23.10 | $51.00 |
| 81 | Water (seeding & sodding) (801-03) | MG | 1 | $100.00 | $275.00 | $486.00 |
| 82 | Sodding (new sod) (803-01) | SY | 25 | $12.00 | $16.50 | $12.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.