TDOT contract CNZ269 bid tabulation
Nh-i-9900(159),99i040-f3-004 the expansion of the smartway intelligent transportation system (its) on i-40 from the shelby/fayette county line to near i-840 in dickson county. Let by Tennessee DOT on October 3, 2025, Counties Benton, Carroll, Decatur, Dickson, Fayette, Haywood, Henderson, Humphreys, And Madison. 3 bids received; low bid $26,998,803 by Shelby Electric Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 03 OCT 2025
- Pay items
- 92
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Shelby Electric Company, Inc. | $26,998,803 | Low |
| 2 | Stansell Electric Company, Inc. | $28,107,640 | +4.0% |
| 3 | Davis H. Elliot Construction Company, Inc. | $38,260,000 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelby Electric Company, Inc. | 2. Stansell Electric Company, Inc. | 3. Davis H. Elliot Construction Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $194,976 | $285,500 | $500,000 |
| 2 | CPM project schedule (108-03) | LS | 1 | $55,200 | $139,500 | $250,000 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $66,000 | $156,500 | $130,000 |
| 4 | Furnishing & spreading topsoil (203-07) | CY | 27 | $181.20 | $58.00 | $34.40 |
| 5 | Sediment removal (209-05) | CY | 270 | $112.37 | $28.50 | $23.35 |
| 6 | Temporary silt fence (with backing) (209-08.02) | LF | 26,445 | $6.60 | $6.10 | $4.60 |
| 7 | Sandbags (209-09.01) | BAG | 228 | $8.40 | $11.50 | $7.95 |
| 8 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 950 | $4.80 | $7.00 | $5.20 |
| 9 | Guardrail terminal (type 13) (705-04.03) | EACH | 17 | $2,520.00 | $1,625.00 | $2,205.00 |
| 10 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 21 | $1,800.00 | $1,505.00 | $1,575.00 |
| 11 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 8,100 | $36.00 | $36.50 | $31.50 |
| 12 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 21 | $4,320.00 | $3,945.00 | $3,780.00 |
| 13 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 3 | $3,240.00 | $3,655.00 | $2,835.00 |
| 14 | Guardrail removed (706-01) | LF | 150 | $6.00 | $5.80 | $5.25 |
| 15 | High-visibility construction fence (707-08.11) | LF | 496,855 | $2.92 | $1.10 | $2.46 |
| 16 | Traffic control (712-01) | LS | 1 | $402,000 | $474,500 | $2,500,000 |
| 17 | Interconnected portable barrier rail (712-02.02) | LF | 1,687.50 | $90.00 | $96.00 | $40.00 |
| 18 | Flexible drums (channelizing) (712-04.01) | EACH | 150 | $72.00 | $69.50 | $65.00 |
| 19 | Signs (construction) (712-06) | SF | 1,154 | $9.18 | $8.90 | $7.65 |
| 20 | Arrow board (type C) (712-08.03) | EACH | 3 | $2,640.00 | $2,550.00 | $11.00 |
| 21 | Queue protection truck (712-08.12) | DAY | 6 | $1,680.00 | $1,625.00 | $1,470.00 |
| 22 | Portable queue warning system (712-08.14) | DAY | 4 | $9,360.00 | $9,045.00 | $8,200.00 |
| 23 | Changeable message sign unit (713-16.01) | EACH | 6 | $13,800 | $13,350 | $12,000 |
| 24 | Light standards (35' pole height) (714-08.09) | EACH | 1 | $8,106.61 | $6,955.00 | $8,500.00 |
| 25 | Light standards (40' pole height) (714-08.10) | EACH | 1 | $9,641.00 | $7,750.00 | $9,000.00 |
| 26 | Mobilization (717-01) | LS | 1 | $1,500,000 | $1,984,000 | $1,913,000 |
| 27 | CCTV pole & foundation (80FT pole W/LWRNG dvice) (725-20.02) | EACH | 14 | $63,229 | $44,850 | $90,000 |
| 28 | Maintenance work pad (concrete pad) (725-20.09) | EACH | 16 | $1,698.90 | $1,345.00 | $1,000.00 |
| 29 | Steel overhead sign structure (spans 51 to 70 feet) (725-20.22) | EACH | 11 | $109,895 | $136,500 | $180,000 |
| 30 | Pull box (type C) (725-20.43) | EACH | 103 | $1,680.00 | $2,145.00 | $5,000.00 |
| 31 | Pull box (type D) (725-20.44) | EACH | 373 | $2,730.00 | $2,840.00 | $8,000.00 |
| 32 | Pull box (type E) (725-20.45) | EACH | 55 | $3,960.00 | $3,865.00 | $13,000 |
| 33 | Pull box (structure mounted) (725-20.46) | EACH | 3 | $5,700.00 | $5,185.00 | $5,500.00 |
| 34 | Cable (1/C #6 AWG.) (725-20.55) | LF | 6,990 | $2.20 | $2.50 | $3.30 |
| 35 | Cable (1/C #4 AWG.) (725-20.56) | LF | 17,430 | $3.00 | $3.30 | $3.85 |
| 36 | Cable (1/C #2 AWG.) (725-20.57) | LF | 13,970 | $4.40 | $4.40 | $4.75 |
| 37 | Cable (1/C #1/0 AWG.) (725-20.58) | LF | 7,215 | $6.34 | $6.10 | $5.75 |
| 38 | Cable (1/C #2/0 AWG) (725-20.59) | LF | 4,880 | $6.97 | $6.80 | $6.65 |
| 39 | Electrical connection (725-20.71) | LS | 1 | $192,000 | $91,450 | $75,000 |
| 40 | CCTV camera system (pan tilt & zoom) (725-20.91) | EACH | 14 | $4,820.53 | $3,130.00 | $5,000.00 |
| 41 | CCTV camera system (static) (725-20.92) | EACH | 10 | $2,602.00 | $4,450.00 | $3,500.00 |
| 42 | Dynamic message sign (multi-color) (725-21.02) | EACH | 11 | $118,664 | $105,000 | $125,000 |
| 43 | Network switch (type A) (725-21.11) | EACH | 27 | $14,420 | $23,750 | $25,000 |
| 44 | Network switch (type B) (725-21.12) | EACH | 2 | $289,884 | $78,000 | $150,000 |
| 45 | DMS comm cable (725-21.18) | LF | 1,045 | $2.36 | $7.30 | $2.45 |
| 46 | DMS power cable (725-21.19) | LF | 1,045 | $8.09 | $7.20 | $3.80 |
| 47 | Demarcation site (overhead power) (725-21.43) | EACH | 27 | $5,736.71 | $6,575.00 | $25,000 |
| 48 | Uninterruptible power supply (725-21.85) | EACH | 27 | $8,116.58 | $7,945.00 | $2,500.00 |
| 49 | Radar detection system (725-21.91) | EACH | 16 | $15,093 | $9,890.00 | $7,000.00 |
| 50 | RDS comm cable (725-21.96) | LF | 400 | $10.04 | $13.00 | $6.90 |
| 51 | Conduit bank (type 2) (725-22.22) | LF | 2,130 | $16.00 | $7.60 | $15.35 |
| 52 | Conduit bank (micro-conduit) (725-22.26) | LF | 117,245 | $13.70 | $8.90 | $11.00 |
| 53 | Conduit bank bored (type 2) (725-22.32) | LF | 2,260 | $22.97 | $37.50 | $6.95 |
| 54 | Conduit bank bored (micro-conduit) (725-22.36) | LF | 453,230 | $14.15 | $20.00 | $14.31 |
| 55 | DMS conduit bank (725-22.50) | LF | 825 | $30.07 | $38.00 | $13.85 |
| 56 | Structure conduit bank (type 4) (725-22.64) | LF | 10,850 | $229.20 | $175.00 | $210.45 |
| 57 | 2IN conduit (725-22.71) | LF | 3,720 | $15.20 | $8.30 | $13.95 |
| 58 | 2IN conduit bored (725-22.72) | LF | 3,875 | $18.26 | $32.00 | $6.25 |
| 59 | 2IN conduit W/bank (725-22.74) | LF | 2,165 | $5.14 | $5.40 | $2.00 |
| 60 | 2IN conduit bored W/bank (725-22.75) | LF | 1,050 | $10.68 | $12.00 | $2.15 |
| 61 | 3IN conduit (725-22.78) | LF | 70 | $19.46 | $23.50 | $14.95 |
| 62 | 3IN conduit bored (725-22.79) | LF | 710 | $30.00 | $46.50 | $7.35 |
| 63 | 3IN conduit W/bank (725-22.80) | LF | 140 | $10.86 | $7.70 | $0.90 |
| 64 | 3IN conduit bored W/bank (725-22.81) | LF | 1,955 | $24.00 | $23.50 | $3.00 |
| 65 | 4IN conduit bored W/bank (725-22.85) | LF | 840 | $38.23 | $49.00 | $5.05 |
| 66 | 4IN conduit bored (725-22.86) | LF | 250 | $42.00 | $70.00 | $9.40 |
| 67 | ITS cable marker (725-23.01) | EACH | 5,500 | $161.86 | $114.00 | $257.48 |
| 68 | Fiber optic micro-cable (144 F) (725-23.17) | LF | 630,860 | $2.06 | $2.20 | $4.25 |
| 69 | Fiber optic drop cable (12 F) (725-23.21) | LF | 7,050 | $1.34 | $2.80 | $4.70 |
| 70 | Fiber optic closure (12 F) (725-23.26) | EACH | 3 | $1,245.59 | $1,040.00 | $5,000.00 |
| 71 | Fiber optic closure (144F) (725-23.27) | EACH | 54 | $2,056.69 | $1,265.00 | $8,000.00 |
| 72 | Fiber optic splice fusion (725-23.28) | EACH | 7,900 | $62.48 | $69.00 | $100.00 |
| 73 | Fiber optic termination cabinet (144F) (725-23.30) | EACH | 2 | $2,287.20 | $2,330.00 | $10,000 |
| 74 | Fiber optic drop panel ( 12 F ) (725-23.31) | EACH | 27 | $782.10 | $1,270.00 | $3,000.00 |
| 75 | Cabinet (type A) (725-24.01) | EACH | 2 | $7,800.00 | $2,270.00 | $10,000 |
| 76 | Cabinet (type B) (725-24.02) | EACH | 14 | $7,800.00 | $6,955.00 | $15,000 |
| 77 | Cabinet (type C) (725-24.03) | EACH | 11 | $13,758 | $13,250 | $20,000 |
| 78 | ITS communications hub (building) (725-24.11) | EACH | 2 | $293,225 | $436,500 | $750,250 |
| 79 | Preventive maintenance for system (725-24.21) | LS | 1 | $60,000 | $26,900 | $75,000 |
| 80 | Unscheduled maintenance labor (725-24.25) | HR | 60 | $360.00 | $142.00 | $80.00 |
| 81 | Spare parts (725-24.31) | LS | 1 | $116,763 | $120,000 | $150,000 |
| 82 | Burn-in period (725-24.41) | LS | 1 | $30,000 | $45,650 | $250,000 |
| 83 | Software integration (725-24.52) | LS | 1 | $78,000 | $178,000 | $510,000 |
| 84 | Network integration (725-24.54) | LS | 1 | $108,000 | $137,000 | $510,000 |
| 85 | As-built plans (725-24.55) | LS | 1 | $140,064 | $24,400 | $500,000 |
| 86 | Training (725-24.62) | HR | 12 | $300.00 | $299.00 | $1,750.00 |
| 87 | Road side unit (rsu) (725-28.01) | EACH | 11 | $11,441 | $11,800 | $15,000 |
| 88 | Pedestal pole (type B) (730-23.31) | EACH | 10 | $7,205.05 | $2,470.00 | $2,500.00 |
| 89 | Temporary sediment tube 12IN (740-11.02) | LF | 1,140 | $6.60 | $4.10 | $4.40 |
| 90 | Seeding (with mulch) (801-01) | UNIT | 143 | $90.00 | $43.00 | $59.60 |
| 91 | Crown vetch mixture (with mulch) (801-01.02) | UNIT | 58 | $180.00 | $50.00 | $38.50 |
| 92 | Water (seeding & sodding) (801-03) | MG | 14.30 | $60.00 | $232.00 | $73.64 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.