TDOT contract CNZ185 bid tabulation

The installation of tdot rural smartway intelligent transportation system (its) infrastructure in various locations. Let by Tennessee DOT on June 27, 2025, Counties Marion, Montgomery, And Shelby. 4 bids received; low bid $3,114,945 by Lumin8 Transportation Technologies, LLC.

Owner
Tennessee DOT
Letting
27 JUN 2025
Pay items
74
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lumin8 Transportation Technologies, LLC$3,114,945Low
2Stansell Electric Company, Inc.$3,322,213+7.0%
3Shelby Electric Company, Inc.$3,537,358+14%
4Davis H. Elliot Construction Company, Inc.$4,104,360+32%
TDOT contract CNZ185: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lumin8 Transportation Technologies, LLC2. Stansell Electric Company, Inc.3. Shelby Electric Company, Inc.4. Davis H. Elliot Construction Company, Inc.
1Construction stakes, lines and grades (105-01)LS1$28,475$47,250$52,019$50,000
2Clearing and grubbing (201-01)LS1$8,424.00$9,440.00$20,504$15,000
3Furnishing & spreading topsoil (203-07)CY7$438.00$405.00$68.50$350.00
4Sediment removal (209-05)CY70$323.00$64.00$24.51$150.00
5Temporary silt fence (with backing) (209-08.02)LF700$6.65$5.60$6.95$2.00
6Sandbags (209-09.01)BAG54$51.00$14.50$17.24$5.00
7Polyethylene sheeting (6 mil. minimum) (209-20.03)SY545$12.30$13.00$7.59$3.10
8Guardrail terminal (type 13) (705-04.03)EACH5$2,848.00$1,910.00$2,090.00$1,900.00
9Earth pad for type 38 GR end treatment (705-04.09)EACH7$2,848.00$2,455.00$2,200.00$2,000.00
10W beam GR (type 2) MASH TL-3 (705-06.01)LF2,062.50$44.15$40.00$34.10$31.00
11Tangent energy absorbing term MASH TL-3 (705-06.20)EACH7$5,125.00$4,450.00$3,300.00$3,500.00
12Thrie beam bridge transition MASH TL-3 (705-06.25)EACH1$4,272.00$2,300.00$3,300.00$3,000.00
13High-visibility construction fence (707-08.11)LF700$11.40$1.90$7.50$2.00
14Traffic control (712-01)LS1$243,840$118,500$46,200$200,000
15Interconnected portable barrier rail (712-02.02)LF3,370$45.65$40.00$82.50$40.00
16Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH7$10,893$7,010.00$11,000$7,650.00
17Flexible drums (channelizing) (712-04.01)EACH300$60.50$49.00$46.75$42.50
18Barrier rail delineator (712-04.50)EACH175$18.50$14.50$14.30$13.00
19Signs (construction) (712-06)SF1,520$10.95$8.60$8.47$7.70
20Arrow board (type C) (712-08.03)EACH7$2,278.00$1,875.00$1,760.00$1,600.00
21Queue protection truck (712-08.12)DAY15$2,207.00$3,295.00$1,705.00$1,550.00
22Changeable message sign unit (713-16.01)EACH10$8,685.00$7,725.00$6,710.00$6,100.00
23Mobilization (717-01)LS1$105,305$297,000$168,445$205,000
243 in conduit (725-15.82)LF2,600$9.45$8.80$22.71$13.25
253 in conduit (bored) (725-15.84)LF1,245$31.35$27.50$54.69$27.00
26CCTV pole & foundation (80FT pole W/LWRNG dvice) (725-20.02)EACH4$53,870$56,550$81,815$125,000
27Maintenance work pad (concrete pad) (725-20.09)EACH4$740.00$2,775.00$2,426.04$1,500.00
28Steel overhead sign structure (see plans and SP 725) (725-20.22)EACH1$152,095$152,000$156,500$120,000
29Steel overhead sign structure (see plans and SP 725) (725-20.23)EACH1$166,278$205,500$171,908$130,000
30Steel sign structure (multi-color DMS) (725-20.31)EACH1$109,945$96,250$95,204$100,000
31Pull box (type C) (725-20.43)EACH25$1,450.00$1,990.00$2,372.31$5,500.00
32Pull box (type D) (725-20.44)EACH8$3,828.00$4,555.00$4,007.01$8,500.00
33Pull box (type E) (725-20.45)EACH2$4,586.00$5,890.00$4,932.29$11,000
34Cable (1/C #6 AWG.) (725-20.55)LF3,300$2.20$3.30$3.79$2.35
35Cable (1/C #4 AWG.) (725-20.56)LF2,250$2.60$3.40$4.30$2.90
36Cable (1/C #1/0 AWG.) (725-20.58)LF12,015$4.80$10.00$7.35$4.70
37Electrical connection (725-20.71)LS1$41,490$54,700$43,750$10,000
38CCTV camera system (pan tilt & zoom) (725-20.91)EACH5$4,837.00$5,970.00$5,111.74$8,500.00
39CCTV camera system (static) (725-20.92)EACH2$5,350.00$6,165.00$2,467.04$7,500.00
40Dynamic message sign (multi-color) (725-21.02)EACH3$127,560$149,500$147,290$105,000
41Network switch (type A) (725-21.11)EACH7$8,460.00$15,600$12,166$50,000
42DMS comm cable (725-21.18)LF285$2.35$9.10$3.06$1.00
43DMS power cable (725-21.19)LF285$3.65$7.40$3.06$6.00
44Demarcation site (overhead power) (725-21.43)EACH5$23,968$5,845.00$10,484$10,000
45Uninterruptible power supply (725-21.85)EACH7$4,410.00$3,530.00$5,593.91$10,000
46Environmental sensor comm cable (725-21.87)LF450$1.80$6.90$6.58$1.00
47Radar detection system (725-21.91)EACH3$21,920$9,850.00$20,664$10,000
48RDS comm cable (725-21.96)LF75$6.95$7.90$9.71$1.00
49Environmental sensor (PVMT temp, precip, & visibility) (725-22.16)EACH3$71,626$70,050$49,349$75,000
50Conduit bank (type 4) (725-22.24)LF120$45.20$26.00$30.85$35.00
51DMS conduit bank (725-22.50)LF225$36.25$42.00$84.35$13.70
522IN conduit (725-22.71)LF780$10.25$20.50$18.96$12.25
532IN conduit bored (725-22.72)LF355$31.30$49.00$43.26$25.00
542IN conduit W/bank (725-22.74)LF115$323.00$8.60$9.00$0.95
55ITS cable marker (725-23.01)EACH400$44.00$135.00$215.00$500.00
56Fiber optic drop cable (12 F) (725-23.21)LF170$1.50$5.20$11.78$0.50
57Fiber optic closure (12 F) (725-23.26)EACH2$768.00$2,700.00$1,895.76$2,500.00
58Fiber optic splice fusion (725-23.28)EACH8$40.00$104.00$432.20$1.00
59Fiber optic drop panel ( 12 F ) (725-23.31)EACH7$787.00$1,890.00$2,605.50$1,500.00
60Cabinet (type B) (725-24.02)EACH4$6,872.00$7,285.00$11,421$15,000
61Cabinet (type C) (725-24.03)EACH3$12,304$18,250$12,748$20,000
62Preventive maintenance for system (725-24.21)LS1$23,963$12,600$31,250$5,000.00
63Unscheduled maintenance labor (725-24.25)HR1$15,975$123.00$562.50$75.00
64Burn-in period (725-24.41)LS1$11,500$32,000$16,250$75,000
65Software integration (725-24.52)LS1$11,652$37,450$28,750$175,000
66Network integration (725-24.54)LS1$11,652$25,750$20,000$100,000
67As-built plans (725-24.55)LS1$16,678$8,080.00$16,250$25,000
68Training (725-24.61)LS1$9,710.00$15,600$56,250$50,000
69Road side unit (rsu) (725-28.01)EACH3$7,000.00$14,200$57,539$15,000
70Pedestal pole (type B) (730-23.31)EACH2$2,930.00$2,825.00$5,592.50$10,000
71Temporary sediment tube 12IN (740-11.02)LF270$13.90$8.90$12.50$4.50
72Seeding (with mulch) (801-01)UNIT16$415.00$141.00$80.00$35.00
73Crown vetch mixture (with mulch) (801-01.02)UNIT4$415.00$362.00$343.75$145.00
74Water (seeding & sodding) (801-03)MG1.40$1,700.00$245.00$1,875.00$2.75
TDOT contract CNZ185: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy