TDOT contract CNZ275 bid tabulation

The expansion of the smartway intelligent transportation system (its) on s.r. 385 from near mile marker 7 (l.m. 6.9) in shelby county crossing into fayette county near i-269 (l.m. 15.8). Let by Tennessee DOT on October 3, 2025, Shelby County. 3 bids received; low bid $5,745,706 by Shelby Electric Company, Inc..

Owner
Tennessee DOT
Letting
03 OCT 2025
Pay items
87
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Shelby Electric Company, Inc.$5,745,706Low
2Stansell Electric Company, Inc.$6,806,764+18%
3Lumin8 Transportation Technologies, LLC$7,087,211+23%
TDOT contract CNZ275: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Shelby Electric Company, Inc.2. Stansell Electric Company, Inc.3. Lumin8 Transportation Technologies, LLC
1Clearing and grubbing (201-01)LS1$24,000$25,000$31,255
2Furnishing & spreading topsoil (203-07)CY11$15.23$130.00$485.00
3Sediment removal (209-05)CY110$17.42$80.00$353.00
4Sandbags (209-09.01)BAG96$8.40$5.20$49.00
5Polyethylene sheeting (6 mil. minimum) (209-20.03)SY784$9.60$13.00$12.50
6Mineral aggregate, type A base, grading D (303-01)TON3$60.89$832.00$1,775.00
7Earth pad for type 38 GR end treatment (705-04.09)EACH6$1,440.00$1,580.00$1,578.00
8W beam GR (type 2) MASH TL-3 (705-06.01)LF1,487.50$37.20$41.00$59.20
9GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH7$1,662.00$1,820.00$3,395.00
10Tangent energy absorbing term MASH TL-3 (705-06.20)EACH6$4,080.00$4,475.00$5,127.00
11Guardrail removed (706-01)LF10$12.00$13.00$1.60
12High-visibility construction fence (707-08.11)LF2,375$4.20$2.30$5.75
13Traffic control (712-01)LS1$54,000$200,000$335,120
14Interconnected portable barrier rail (712-02.02)LF2,100$72.00$60.00$50.50
15Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH7$11,400$12,350$14,995
16Flexible drums (channelizing) (712-04.01)EACH200$48.00$52.00$63.10
17Barrier rail delineator (712-04.50)EACH42$17.40$19.00$22.90
18Warning lights (type C) (712-05.03)EACH200$30.00$32.50$39.45
19Signs (construction) (712-06)SF1,296$8.58$9.30$11.30
20Arrow board (type C) (712-08.03)EACH2$1,680.00$1,825.00$2,210.00
21Queue protection truck (712-08.12)DAY6$1,500.00$1,630.00$1,975.00
22Changeable message sign unit (713-16.01)EACH3$12,000$13,000$15,775
23Light standards (30 FT pole height) (714-08.11)EACH3$8,434.80$6,280.00$5,700.00
24Mobilization (717-01)LS1$273,605$678,700$194,637
25CCTV pole & foundation (50FT pole W/LWRNG dvice) (725-20.01)EACH4$37,512$41,550$42,215
26CCTV pole & foundation (80FT pole W/LWRNG dvice) (725-20.02)EACH6$76,137$55,200$59,370
27Maintenance work pad (concrete pad) (725-20.09)EACH5$1,835.80$1,500.00$828.00
28Maintenance work pad (wood platform) (725-20.10)EACH5$1,353.18$1,500.00$6,145.00
29Steel overhead sign structure (spans 51FT to 70FT) (725-20.22)EACH3$100,973$175,000$184,385
30Pull box (type C) (725-20.43)EACH58$1,610.80$2,050.00$1,610.00
31Pull box (type D) (725-20.44)EACH66$2,660.87$4,300.00$4,320.00
32Pull box (type E) (725-20.45)EACH14$3,880.93$5,000.00$5,052.00
33Cable (1/C #6 AWG.) (725-20.55)LF4,770$2.20$2.50$2.05
34Cable (1/C #4 AWG.) (725-20.56)LF6,180$3.00$3.30$2.25
35Cable (1/C #2 AWG.) (725-20.57)LF16,215$4.40$4.40$3.30
36Cable (1/C #3/0 AWG.) (725-20.60)LF24,370$8.57$8.70$6.55
37Electrical connection (725-20.71)LS1$70,044$66,000$99,950
38CCTV camera system (pan tilt & zoom) (725-20.91)EACH16$4,820.53$6,700.00$5,840.00
39Dynamic message sign (multi-color) (725-21.02)EACH3$118,664$125,000$141,745
40Network switch (type A) (725-21.11)EACH13$14,420$28,000$10,287
41Network switch (type B) (725-21.12)EACH1$195,991$88,000$195,945
42Demarcation site (overhead power) (725-21.43)EACH3$5,736.71$12,500$30,015
43Demarcation site (underground power) (725-21.44)EACH5$6,864.98$15,200$25,175
44Transformer type A (10KVA) (725-21.71)EACH3$3,844.80$8,300.00$11,523
45Transformer (1.5KVA) (725-21.73)EACH5$975.90$8,300.00$5,110.00
46Uninterruptible power supply (725-21.85)EACH13$8,116.58$3,800.00$10,830
47Environmental sensor comm cable (725-21.87)LF200$13.06$4.20$7.90
48Radar detection system (725-21.91)EACH7$15,093$17,000$15,765
49RDS comm cable (725-21.96)LF865$10.04$4.00$7.90
50Environmental sensor (PVMT temp & precip) (725-22.13)EACH4$30,846$33,500$89,657
51Conduit bank (type 2) (725-22.22)LF495$16.00$5.00$9.25
52Conduit bank (type 4) (725-22.24)LF32,285$17.06$6.85$15.65
53Conduit bank bored (type 2) (725-22.32)LF1,525$22.97$20.00$42.45
54Conduit bank bored (type 4) (725-22.34)LF12,360$25.72$25.00$45.65
55DMS conduit bank (725-22.50)LF225$30.07$12.00$19.80
562IN conduit (725-22.71)LF2,055$15.20$17.00$8.65
572IN conduit bored (725-22.72)LF1,295$18.26$30.00$32.30
582IN conduit W/bank (725-22.74)LF5,700$5.14$3.50$2.85
592IN conduit bored W/bank (725-22.75)LF4,005$10.68$6.90$8.65
603IN conduit (725-22.78)LF70$21.85$21.00$9.45
613IN conduit W/bank (725-22.80)LF460$10.86$4.70$4.25
623IN conduit bored W/bank (725-22.81)LF970$20.08$36.00$15.85
63ITS cable marker (725-23.01)EACH107$161.86$125.00$50.05
64Fiber optic cable (144F) (725-23.16)LF49,235$3.90$3.50$2.65
65Fiber optic drop cable (12 F) (725-23.21)LF4,700$1.66$4.00$1.75
66Fiber optic closure (12 F) (725-23.26)EACH8$1,245.59$750.00$895.00
67Fiber optic closure (144 F) (725-23.27)EACH5$2,056.69$1,000.00$1,235.00
68Fiber optic splice fusion (725-23.28)EACH678$62.48$90.00$28.50
69Fiber optic termination cabinet (144 F) (725-23.30)EACH1$2,287.20$10,400$4,763.00
70Fiber optic drop panel ( 12 F ) (725-23.31)EACH14$782.10$355.00$990.00
71Cabinet (type B) (725-24.02)EACH10$7,800.00$7,500.00$6,285.00
72Cabinet (type C) (725-24.03)EACH3$13,758$14,900$12,070
73ITS communications hub (building) (725-24.11)EACH1$293,225$660,000$395,965
74Preventive maintenance for system (725-24.21)LS1$18,000$15,750$26,148
75Unscheduled maintenance labor (725-24.25)HR1$180.00$250.00$105.00
76Spare parts (725-24.31)LS1$145,279$133,000$238,515
77Burn-in period (725-24.41)LS1$14,400$19,000$9,555.00
78Software integration (725-24.52)LS1$42,000$50,000$12,735
79Network integration (725-24.54)LS1$42,000$97,000$12,735
80As-built plans (725-24.55)LS1$24,000$7,500.00$22,875
81Training (725-24.62)HR12$300.00$500.00$105.00
82Temporary sediment tube 12IN (740-11.02)LF480$12.00$5.00$11.25
83Pole 40FT class 4 wood (790-03.03)EACH1$2,160.00$2,500.00$3,318.00
84Seeding (with mulch) (801-01)UNIT48$90.00$50.00$145.00
85Special wetland seed mixture (801-01.36)UNIT17.50$180.00$175.00$600.00
86Seeding (without mulch) (801-02)UNIT5.50$78.00$56.00$795.00
87Water (seeding & sodding) (801-03)MG5.50$60.00$261.00$1,890.00
TDOT contract CNZ275: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy