Rogers Group, Inc.: TDOT bid record
Rogers Group, Inc. submitted 263 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 02 OCT 2026, and was the low bidder on 147 of them (56%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $382,450,158
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 31 | 21 | 68% |
| 2020 | 18 | 10 | 56% |
| 2022 | 1 | 0 | 0% |
| 2023 | 7 | 3 | 43% |
| 2024 | 58 | 33 | 57% |
| 2025 | 80 | 48 | 60% |
| 2026 | 68 | 32 | 47% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Davidson County | 15 | 3 | 20% |
| Knox County | 13 | 6 | 46% |
| Cumberland County | 12 | 11 | 92% |
| Williamson County | 10 | 2 | 20% |
| Maury County | 10 | 3 | 30% |
| Sumner County | 9 | 7 | 78% |
| Anderson County | 7 | 5 | 71% |
| Lawrence County | 6 | 4 | 67% |
| Mcminn County | 6 | 5 | 83% |
| Rutherford County | 6 | 1 | 17% |
| Lewis County | 5 | 4 | 80% |
| Putnam County | 5 | 4 | 80% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 217 | 82 (38%) | $8.00 | $8.00 |
| Mineral aggregate, type A base, grading D | 303-01 | TON | 166 | 80 (48%) | $38.50 | $45.00 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 176 | 71 (40%) | $900.00 | $969.62 |
| Cold planing bituminous pavement | 415-01.01 | TON | 170 | 71 (42%) | $28.50 | $34.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 177 | 69 (39%) | $31.00 | $34.50 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 197 | 57 (29%) | $16.00 | $17.30 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 171 | 49 (29%) | $1,600.00 | $1,500.00 |
| Arrow board (type C) | 712-08.03 | EACH | 130 | 49 (38%) | $1,196.01 | $1,170.00 |
| Painted pavement marking (6" line) | 716-05.20 | LM | 136 | 46 (34%) | $1,373.75 | $1,400.00 |
| Plastic pavement marking(channelization striping) | 716-02.04 | SY | 142 | 45 (32%) | $25.43 | $29.75 |
| Acs mix(PG70-22) grading D | 411-02.10 | TON | 77 | 43 (56%) | $135.00 | $148.25 |
| Acs mix(PG64-22) grading D | 411-01.10 | TON | 69 | 43 (62%) | $128.00 | $171.29 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Vulcan Construction Materials, LLC | 83 | 25 of 83 |
| Volunteer Paving, LLC | 56 | 24 of 56 |
| Jones Bros. Contractors, LLC | 43 | 15 of 43 |
| APAC-Atlantic, Inc. | 40 | 17 of 40 |
| PRI of East Tennessee Inc. | 22 | 8 of 22 |
| Wiregrass Construction Company, Inc | 21 | 7 of 21 |
| Eubank Asphalt Paving & Sealing, LLC | 18 | 15 of 18 |
| Tinsley Asphalt, LLC | 17 | 14 of 17 |
| Duracap Asphalt Paving Co., Inc. | 14 | 4 of 14 |
| Hawkins Asphalt Paving, LLC | 13 | 9 of 13 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN261076 | Anderson County | The construction of a turn lane on s.r. 61 at the intersection of sinking springs road/lewallen hollow road (l.m. 17.55) in clinton, includi | 1 of 4 | $348,000 | Low, 37% under the second |
| 14 AUG 2026 | CN261063 | Campbell County | The grading, drainage, signals and paving on u.s. 25w (s.r. 9) at the intersection of hunters branch road in lafollette (l.m. 26.05 - l.m. 2 | 1 of 5 | $1,493,000 | Low, 16% under the second |
| 14 AUG 2026 | CN262058 | Cumberland County | The grading, drainage, construction of concrete bulb-tee bridges, and paving on u.s. 127 (s.r. 28) from near potato farm road to near lowe r | 4 of 6 | $79,329,807 | +13% |
| 26 JUN 2026 | CN263048 | Bedford County | The resurfacing on s.r. 269 from s.r. 82 (l.m. 4.45) to s.r. 64 (l.m. 9.54) | 4 of 4 | $1,174,299 | +9.0% |
| 26 JUN 2026 | CN262047 | Fentress County | The resurfacing on u.s. 127 (s.r. 28) from south york highway (l.m. 16.89) to north of s.r. 52 (l.m. 19.83) | 1 of 2 | $1,884,000 | Low, 19% under the second |
| 26 JUN 2026 | CN262048 | Grundy County | The resurfacing on s.r. 50 from near hideaway cabin road (l.m. 13.23) to near s.r. 56 (l.m. 17.74), including thin epoxy overlay on the brid | 1 of 1 | $1,024,050 | Low |
| 26 JUN 2026 | CN261056 | Knox County | The resurfacing on u.s. 441 (s.r. 33) from near s.r. 71 (l.m. 5.72) to near central street (l.m. 8.26) | 1 of 3 | $1,660,000 | Low, 15% under the second |
| 26 JUN 2026 | CN263050 | Macon County | The resurfacing on s.r. 141 from s.r. 52 (l.m. 0.00) to the trousdale county line (l.m. 5.57) | 1 of 4 | $1,365,194 | Low, 10% under the second |
| 26 JUN 2026 | CN262049 | Marion County | 15(241),58s015-f8-002 the resurfacing on u.s. 41a (s.r. 15) from near clifftops avenue to near u.s. 41 (s.r. 2) and on u.s. 41 (s.r. 2) from | 2 of 2 | $2,220,041 | +5.0% |
| 26 JUN 2026 | CN263051 | Marshall And Williamson Counties | Microsurfacing or thin mix overlay on u.s. 31a (s.r. 11) from near sw forest street in marshall county (l.m. 26.03) to the rutherford county | 3 of 4 | $1,598,100 | +8.0% |
| 26 JUN 2026 | CN263052 | Maury County | The grading, drainage, and paving on a s.i.a. route (including u.s. 43/s.r. 6) serving project leeward | 5 of 8 | $3,173,876 | +47% |
| 26 JUN 2026 | CN262050 | Mcminn County | 54s030-m8-004 the resurfacing on s.r. 30 from south of david w. lillard memorial highway to north of east etowah road, including the traffic | 1 of 1 | $2,775,000 | Low |
| 26 JUN 2026 | CN263053 | Rutherford County | The resurfacing on u.s. 31a (s.r. 11) from the williamson county line (l.m. 0.00) to the williamson county line (l.m. 2.57) | 2 of 4 | $711,000 | +6.0% |
| 26 JUN 2026 | CN262053 | Sequatchie County | The resurfacing on u.s. 127 (s.r. 28) from the marion county line (l.m. 0.00) to east of wilson road (l.m. 4.00) | 1 of 1 | $1,822,045 | Low |
| 26 JUN 2026 | CN263054 | Williamson County | The resurfacing on i-65 from south of concord road (l.m. 17.50) to the davidson county line (l.m. 21.38) | 2 of 4 | $4,861,770 | +3.0% |
| 08 MAY 2026 | CN261051 | Anderson County | The slope stabilization on s.r. 116 near l.m. 0.9 | 3 of 4 | $1,097,000 | +10% |
| 08 MAY 2026 | CN261031 | Blount County | The resurfacing on s.r. 33 from near s.r. 35 (l.m. 12.35) to near clarks grove road (l.m. 16.08) | 3 of 3 | $2,400,000 | +42% |
| 08 MAY 2026 | CN262040 | Cumberland County | The resurfacing on u.s. 70 (s.r. 1) from near deep water road (l.m. 5.27) to pomona road (l.m. 8.86), including bridge expansion joint repai | 1 of 2 | $1,410,000 | Low, 12% under the second |
| 08 MAY 2026 | CN262046 | Cumberland And Fentress Counties | The resurfacing on u.s. 127 (s.r. 28) from near north lowe road (l.m. 29.50) in cumberland county to near old highway 28 (l.m. 0.71) in fent | 1 of 2 | $443,600 | Low, 12% under the second |
| 08 MAY 2026 | CN261045 | Grainger County | The resurfacing on u.s. 11w (s.r. 1) from near helton road (l.m. 22.02) to near u.s. 25e (s.r. 32) (l.m. 27.18), including thin epoxy overla | 3 of 3 | $1,708,389 | +20% |
| 08 MAY 2026 | CN261037 | Hancock County | The resurfacing on s.r. 31 from near deer run road (l.m. 1.58) to near ben bloomer road (l.m. 8.41) | 1 of 2 | $1,714,064 | Low, 4.0% under the second |
| 08 MAY 2026 | CN261041 | Knox County | The resurfacing on u.s. 11e (u.s. 25w, s.r. 9) from s.r. 168 (l.m. 8.09) to near strawberry plains road (l.m. 13.98) | 2 of 3 | $3,510,000 | +10% |
| 08 MAY 2026 | CN261042 | Knox County | The resurfacing on s.r. 331 from s.r. 131 (l.m. 8.31) to s.r. 61 (l.m. 16.02) | 2 of 3 | $1,705,000 | +19% |
| 08 MAY 2026 | CN261052 | Loudon County | 005,53s002-f8-005 the resurfacing on u.s. 11 (s.r. 2) from near natalie boulevard (l.m. 8.40) to near u.s. 321 (s.r. 73) (l.m. 13.42) | 2 of 3 | $2,900,000 | +24% |
| 08 MAY 2026 | CN261043 | Monroe County | 007,62s360-f8-007 the resurfacing on s.r. 360 from near s.r. 165 (l.m. 0.00) to near ballplay road (l.m. 10.33) and on s.r. 165 from near s. | 2 of 2 | $2,147,417 | +8.0% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.